Loading...
HomeMy WebLinkAboutCHECKLIST & REVIEW ACTION - 07-00387 - American Self Storage - A110001 Building Safety Department City of Rexburg REXnT R4 G 19 E. Main janellh@rexburg.org Phone: 208.359.3020 exf 326 1.1\.,ll-�,;,.,;;, Rexburg, ID 83440 www.rexburg.org Fax: 208.359.3024 Office Hours: Monday -Friday 8:00am-4:00pm Commercial/Multi Family Pre -Construction Checklist Seismic Design Category — D Roof Snow Load — 35 lbs. per sq. ft. (unless soil evaluation confirms category C) Wind Load — 90 MPH Ground Snow — 50 lbs. per sq. ft. Frost Depth — 36" The follov ing items should he compleled be oreyou submityour building permit application. Completion ofa Building Permit Application: You may print this application from our website wail .rcNburg.ore or pick up a copy at the City Annex Building (address above). Commercial Permits. (the following must be submitted with the Application) 2"4 sets of site plans and 2 sets of building plans stamped by a licensed professional ❑ Site olans and building plans in PDF format must be submitted after plans have been approved Ci Structural Calculations stamped by a licensed Engineer 2' Energy Compliance Report: As per the 2003 IECC, a Compliance check must be completed and submitted (the comcheck is available online at xxnvw.cnergycodes.goy). Please complete the envelope, mechanical lighting sections. LT Page 2 of the Application must include the Idaho Contractor's Registration Number or th(ex1emptio),rm must be completed and signed, see Page 9. C�PAge 4 of the Application must be completed and signed by your Plumber. Page 5 of the Application must be completed by signed bNyour Mechanical Contractor. lechanical system sizing and design. Ga"Page 6 of the .Application must be completed and stetted by your Electrician. C3YElectrical layout must be included with the building plans. Plans will be reviewed by the electrical inspector nor to issuance of the building permit. mergency Services Construction Permit LT Lighting Plan Electrical Permits are now issued through the City of Rexburg. See Page 6 of the application. Remodels If you are considering a remodel, a g= of the bid or estimate f e remodel must be sub(�mitted with the Permit Application. 1 , • 2 set of plans (may need TECC Review) RFAUG U E• :Additions — Same as new construction 1 5 2007 Cf (Y OF REXBURG h; cCITY OF M 19 E Main St. REXBURG Rexburg, Idaho 83440 O,-- Americas Famiiy Commnniry Phone (208) 359-3020 Review Action Fax (208) 359-3022 September 12, 2007 Permit Number: 07 00387 Project Name: American Self Storage Addition Project Type: Commercial Addition Review Item Electrical Service Review The electrical plan that was submitted was 08/20/2007 vague. Conduit is required where subject to physical damage. Make sure that this is wired to the 2005 NEC. Any questions call Bret at 716-1332. Electrical Circuits Review 08/20/2007 Miscellaneous The plans are stamped only for the structural aspects of the plan. Tech -Fast Metal Systems does not take liability as the "Professional of Record" as required by the IBC. Who is the "Professional of Record" for this project? A restroom is required fords.the office. It must meet accessible standards. How will ventilation be handled? See Section 1203.4. How will drainage be provided? See requirements of IBC Sections 1803.3 and 1805.3.4. Provide details. Water and Sewer Service Interior Environment Building Type Compliance Height and Area Review Building Code Fire Compliance Review As Type IIB Buildings, only non-combustible materials as per IBC Section 603 may be used. Identify materials and methods used to construct the interior walls. Provide a one -hour fire barrier around the office area. This barrier must be constructed as per IBC Section 706.4 (including supporting structure). The North wall on Building # 5 is required to be a one hour rated wall in accordance with IBC Table 602. Provide details for this wall that satisfy IBC Section 704.6.