HomeMy WebLinkAboutCHECKLIST & REVIEW ACTION - 07-00387 - American Self Storage - A110001
Building Safety Department
City of Rexburg REXnT R4 G
19 E. Main janellh@rexburg.org Phone: 208.359.3020 exf 326 1.1\.,ll-�,;,.,;;,
Rexburg, ID 83440 www.rexburg.org Fax: 208.359.3024
Office Hours: Monday -Friday 8:00am-4:00pm
Commercial/Multi Family Pre -Construction Checklist
Seismic Design Category — D Roof Snow Load — 35 lbs. per sq. ft.
(unless soil evaluation confirms category C) Wind Load — 90 MPH
Ground Snow — 50 lbs. per sq. ft. Frost Depth — 36"
The follov ing items should he compleled be oreyou submityour building permit application.
Completion ofa Building Permit Application: You may print this application from our website
wail .rcNburg.ore or pick up a copy at the City Annex Building (address above).
Commercial Permits. (the following must be submitted with the Application)
2"4 sets of site plans and 2 sets of building plans stamped by a licensed professional
❑ Site olans and building plans in PDF format must be submitted after plans have been approved
Ci Structural Calculations stamped by a licensed Engineer
2' Energy Compliance Report: As per the 2003 IECC, a Compliance check must be completed and submitted
(the comcheck is available online at xxnvw.cnergycodes.goy). Please complete the envelope, mechanical
lighting sections.
LT Page 2 of the Application must include the Idaho Contractor's Registration Number or th(ex1emptio),rm
must be completed and signed, see Page 9.
C�PAge 4 of the Application must be completed and signed by your Plumber.
Page 5 of the Application must be completed by signed bNyour Mechanical Contractor.
lechanical system sizing and design.
Ga"Page 6 of the .Application must be completed and stetted by your Electrician.
C3YElectrical layout must be included with the building plans. Plans will be reviewed by the electrical inspector
nor to issuance of the building permit.
mergency Services Construction Permit
LT Lighting Plan
Electrical Permits are now issued through the City of Rexburg. See Page 6 of the application.
Remodels If you are considering a remodel, a g= of the bid or estimate f e remodel must be sub(�mitted
with the Permit Application. 1 ,
• 2 set of plans (may need TECC Review) RFAUG
U E• :Additions — Same as new construction 1 5 2007
Cf (Y OF REXBURG
h; cCITY OF M 19 E Main St.
REXBURG Rexburg, Idaho 83440
O,--
Americas Famiiy Commnniry Phone (208) 359-3020
Review Action Fax (208) 359-3022
September 12, 2007
Permit Number: 07 00387
Project Name: American Self Storage Addition
Project Type: Commercial Addition
Review Item
Electrical Service Review The electrical plan that was submitted was 08/20/2007
vague. Conduit is required where subject to
physical damage. Make sure that this is wired
to the 2005 NEC. Any questions call Bret at
716-1332.
Electrical Circuits Review 08/20/2007
Miscellaneous The plans are stamped only for the structural
aspects of the plan. Tech -Fast Metal Systems
does not take liability as the "Professional of
Record" as required by the IBC. Who is the
"Professional of Record" for this project? A
restroom is required fords.the office. It must
meet accessible standards. How will ventilation
be handled? See Section 1203.4. How will
drainage be provided? See requirements of
IBC Sections 1803.3 and 1805.3.4. Provide
details.
Water and Sewer Service
Interior Environment
Building Type Compliance
Height and Area Review
Building Code Fire Compliance Review
As Type IIB Buildings, only non-combustible
materials as per IBC Section 603 may be used.
Identify materials and methods used to
construct the interior walls.
Provide a one -hour fire barrier around the office
area. This barrier must be constructed as per
IBC Section 706.4 (including supporting
structure). The North wall on Building # 5 is
required to be a one hour rated wall in
accordance with IBC Table 602. Provide
details for this wall that satisfy IBC Section
704.6.