HomeMy WebLinkAboutRESCHECK - 07-00357 - 304 Jill Dr - New SFRRESCheck Software Version 4.02-1
Compliance Certificate
Project Title: Gordon & Cherrie Allen
Report Date: 08f01107
Data fileriame: C:1Docurrtents and SetfingslJohnlDesktop\Kartchner Narnes\ResCheck Xb5licfahMA,llen - Winchesfer.rck
Energy Code:
Location:
Construction Type:
BI. l idng N- nt tion:
Conditioned Floor Area:
Glazing Area Percentage-
Heating
ercentageH ating Degree Days:
Climate Zeas:
Construction site.-
304
ite.304 Jill Crier
Rexburg, ID 83440
2006 IECC
Rexburg, Idaho
Single Frail
Bldg. faces 0 deg. from North
1675 ft2
15%
8693,
6
Owner/Agent-
Wall
r/Agent:
designer
/Con irac#or:
FCarfchner Hames
345 E. 17 Street
Ammon City, ED 83406
(2Q8) 528-8898
Jhoellein@att.net
Wall Bonus Froom: Wood Frame, 1 'T O.C.:
Orientation: Unspecified
Window I Vinyl Fram :D u 1 Pane:
SHGC, D. I
Orientation: Unspecified
Ceiling Bonus oorn: Fiat Ceiling or Scissor Truss,
Flog : All -Wood Joist/Truss: Over Unconditioned ace:
`a I I 1 Main Floor: Food Frame, 1611 O,C..,
Orientation- unspecified
Window 1; Vinyl Frame. -Double Pane;
SHGC: 0.41
Orientation: Unspecified
Cor 1: Solid:
ri nt tion:n pecifi d
Door : Glass:
H: 0.41
orientation: Unspecified
Floor : All -Wood Joi t ru -Over Outside Air:
Rasement wall 1 Solid Concrete or Masonry:
Orientations Unspecified
Wall height: 9.o,
Depth below rade .o'
Inuitio depth: 8.al
Window : Vinyl FraMe,.Double Fane:
H+: 0.41
rientafion: Unspecified
Furnace 1 Forced Hot Air 90 AFUE
325
280
280
1418
155
33
37
1405
64
u.0
Compliance Statement,, T he proposed buildin design described here is consistent with the buil
calculations submitted with the permit application. firero� o .
E� ' rias �. � p d b�._rlrir� hbeen designed to
91 and to Ompl with the nd for requirements fisted in
the RESche
Gordon & Cherneil n
0,0
0.
L4;
0.350
0.350
0.035
0.350
7
9
72
54
F1
E
I
63
22
Yo E
IMS, p l i tion , and other
'et 4 2006 ECC rrrt ti tints in
tion heojit.
Page I of 5
Name - Title
Project Notes--
Henderson
t:Hend r on Subd.
Lot 7, Block
c? —?— 0-7
••. �'ek FAQ ..
Gordon & Cherrie Mer
Ip
Date: 08/01107
Ili n:
[I Ceiling 1: Flat Ceiling or Scissor Truss, R-50.0 cavity insulation
Comments:
LJ Ceiling 2 Bonus Room: + Flat: Ceiling or Scissor Truss, R-50.0 cavity insulation
Comments-
Above -Grade Walls:
LJ Wall 2 Bonus Froom: Wood Frame, 16" O.C., .lI 9.0 cavityinsulation
Comments:
El Wall I Main Floor: Wood Frame, 16T" o.o., -1 9.0cavity insulation
Comments -
Basement
meat :Basement 'malls:
LI Basement Wa 111: solid Con trete or IM aso nry, 9 . 0 .fit / 8.O .0' i
Comments:
Windows:
'rindo r I'vinyl Fram :Do b1 Pare, Ul-tactor: 0.350
For windows without labeled U -fa for , describe features-,
#Paries - Frame Type Thermal Break?
Comments: -
LI Window I - Vinyl 1=r m :Double Pan U -tact . 0.350
For windows without labeled U -fa torr describe features,
#Panes � Frame Type - Thermal Break? '
Comments:
3 Window 2, Vinyl Frame; ou l Pane -factor: 0,350
For windows without labeled U -factors,' describe features:
#Panes . Frame Type Thermal Break?
Comments:
Note. Up to 1sq,-ft. f glazed fenestration r dwelling is exem t from
Doors.
El moor 1: Solid, U -factor: 0.200
Comments-
Door
mm nt -Door Glass, -factor: 0.035
Comments:
Floors:
FJa r. All -food JorstfTruss: Over Unconditioned Space,insulation
Comments:
Floor insulation is installed in p rM 2n ent contact with the underside side of the subf[oor decking -
LI Floor : I! -''mood Mst/Tr-u s: Over Outside Air, R-30.0 C2vity insulation
comments.
Gordon 4..1 ChiE!.1rrie Men
Fags 3 of
Floor insulation is installed in permanent corp tact with the underside oftdecking.
� ufi��r
Heating and Cooling Equipmn :
EJ Furnace 1: Forced Hot Air: 90 AFLJE or higher
Make and Mcd l Number:
Air Leakage:
0 JOint , Penetrations,. and all other such openings in the building envelope that are sources of air* leakage
Ll Recessed lights arei h r 1 Type IC rated with enclosures sealed
td against leaks to the ceiling, or Type jC rid
and ASTM E283 labeled, or ire tolled inside n r -ti ht a e bi ith a 0. �, clearance fromombu til 1f
� � rr�tr`��i end
clearance from insulation,
Vapor Retarder
Lj Vapor retarder is installed on the warm -in -winter side of all non -vented framed ceilings, walls,and floors. or it has been determined
that moisture or its freezing will not damage the materials; or other approved meads to avoid condensation are
prnvrdd*
Comments:
t
1
t
WJ
Materials Identification:
Materials and equipment are Ed ntGfi d so that connPliance rare b determined.
Manufacturer manuals for all installed heating and cooling equipment and service water h tln equipment prpt hbeen provided.
Insulation E -va lu , -glazing U -fa t r r 2nd heating q ui pry tit efficiency are clearly marked on the building plans or specifications.
Insulation is installed according to manufacturer's instructions, in substantial contact with the ubeing insulated, nulatd, end in
manner that achieves the rated R-valuewithout compressing the ire u l atlon.
Duct Insulation-:
Ducts
in
unconditioned spaces are
insulated to R-&
Ducts
in
floor trusses are insulated
to -+
Duct Construction:
L] Air handlers, filter bo . , and duct connections to flanges of air distribution stemui m
� p nt or sheet metal fittings rsealed
and mechanically fastened.
El All joints, seams, and connections are made substantia[ly aidight with to a
tapes, tin , mastics (adhesives) or other aPProved
closu re systems. Tapes a nd mastics are rated UL 181 A or UL 18 1 B'
Building framing cavities are nct used as supply ducts.
Automatic or gravity dampers are installed on all outdoor air intakes and exhausts.
Additional requirements for tape lire and metal duct r`
� �m,r-�cd are1r�lr.�,dd ban inspection for rnp�lir� with the
lr-�trn�t�r�1 1�I�r�ilCode.
Temperature Controls:
Thermostats exist for each separate HVAC system, A manual or automatic means t
par -till` restrict or shut off the heating andfor
cooling input to each zone or floor is provided}
Heating and Cooling Equipment Sizing:
Additional requirements for equipment sizing r included by an inspection fir� .
o�ipl�anwith the lntmtiorri mechanical Code.
Circulating Hot Water Systems:
Fi Circulating hot water pipes are insulated to R-2.
Circulating hot water systems include an automatic or accessilb,le manual
switch to turn off the circulating pump when the t i
not in use.
Heating an,.d Cooling Piping Insulation:
HVAC Piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are.. insulated to R-.
Certificate:
[A perrnan erg t Carol tate is provided on or in the electrical e n l d i tn' utl r listing the
� � predominant insulation R -values; window
-factors; typ.e and efficiency of space -conditioning and water heating ori m nt.
MOTES TO FIELM Bu ldin Dom-pnr- mc• n# Ugez% nn1y)
++'A'V"�VAOC.4gS--0aiTfia�n'+f'Y�fh{�AA Vxx49f'v �f�jppJpp�: :.
�. e`'_�ra� :�wJ�Jar:v Y'rHYC:�.^745}L�.vrn°^o-•�•, .
+:+�P9't•}{rk no-.x:cwi4ana�fv,. n.�t�•-nxt�•xdvRC��w.]v�.�rt� .,T^^;.-:�+w•.v.rar . ..., ._.
ky.9L44P�W:C�+4'. �fJLi .. .... _....r..:d.W Jhv�:v.'ah•'fii':`:' • f •.+vtti'-ti+M1S'i�^}irJ rvmrKSPA®.L4A. bJP L}ii
Gordon & CherrieAllen
W3!1,
A
0
�rw::=r�:t��a,.�J.��,.ts���raen,,�wr.•{,,�.r=yas+r�.,� ,
Gordon & Chemie Allen:....�.
Page 5 of
`.allEi
}
Ur..
a �
� �� ����,,:. r fpm: � � �:� f���f�",t +�"' 't"'�• • ; i v r
s x
, J
Ceiling Roof 50.00
Wall 19.00
Floor / Foundation 30.00
Ductwork (unconditioned space,%):
w
r,.Fryf �N r
r
Window 0.35 0.41 x
Door 0.04 041
._ _: a �?".•-:•:..�, � - � x �. �. f .: rH Esc # � °-� kc
� ,."`"� w. � .r�•';. � � •,. r �,,. � �" f �F,�s •� ��•�f�rg�� i .i� �#� � yr �,,�.,,`"'�:.- ��
r
Forced Hot Air .Furnace FUE
Water Heater:
.ren: - Date;
Comments: