Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 3 - The Grove at Thomson FarmsInspection Date 04/22/2021 File Name 20001DFR04222021LIC Inspector's Signature Inspector's Name Loren Clifford Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 04/22/2021 C0A80059-9536-4410-8B9E-345BD23A80DC 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 02:30 PM Client Stillwater Equity Partners Contractor Headwaters Time End 04:30 PM Inspection Type(s) Other Location(s) South sides of southern most units across from trailer office Observations/ Remarks Contractor requested Three passing density shots per building for a total of six passing shots. All densities met specification. Arrived on site at 3 PM finished testing by 3:45 PM and left site around 4 PM Items observed are in general conformance with approved project documents and jurisdictional requirements. New Multi Photo Inspection Date 04/22/2021 File Name 20001DFR04222021LIC Inspector's Signature Inspector's Name Loren Clifford Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 04/22/2021 C0A80059-9536-4410-8B9E-345BD23A80DC 2