HomeMy WebLinkAboutFIELD REPORT 4 - 20-00273 - Madison High School Field HouseInspection Date
04/20/2021
File Name
20027C04202021WDM
Inspector's Signature Inspector's Name
W. Moffat
Reviewer's Signature Reviewer's Name
E. Vail
Reviewed Date
04/20/2021
5b433c08aac70bf4-1618939417509 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name
Madison Fieldhouse
Time Start
09:45 AM
Client
Madison School District
Contractor
Thompson Excavation
Time End
11:45 AM
Inspection Type(s)
Concrete Placement
Location(s)
Sidewalk on the north west corner of the tennis
ball courts
Observations/ Remarks
We arrived at approximately 10:10AM. The truck was already there when we arrived. We tested the
concrete and informed the superintendent of the results. The pour took longer than usual to pour do to
the fact that they were moving the concrete by skidster. We watched the duration of the pour and
returned to the lab at approximately 11:30 AM.
Items observed are in general conformance with approved project documents and jurisdictional requirements.