Loading...
HomeMy WebLinkAboutFIELD REPORT 4 - 20-00273 - Madison High School Field HouseInspection Date 04/20/2021 File Name 20027C04202021WDM Inspector's Signature Inspector's Name W. Moffat Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 04/20/2021 5b433c08aac70bf4-1618939417509 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Madison Fieldhouse Time Start 09:45 AM Client Madison School District Contractor Thompson Excavation Time End 11:45 AM Inspection Type(s) Concrete Placement Location(s) Sidewalk on the north west corner of the tennis ball courts Observations/ Remarks We arrived at approximately 10:10AM. The truck was already there when we arrived. We tested the concrete and informed the superintendent of the results. The pour took longer than usual to pour do to the fact that they were moving the concrete by skidster. We watched the duration of the pour and returned to the lab at approximately 11:30 AM. Items observed are in general conformance with approved project documents and jurisdictional requirements.