Loading...
HomeMy WebLinkAboutFIELD REPORT 2 - 20-00273 - Madison High School Field HouseInspection Date 04/19/2021 File Name 20027DFR04192021WDM Inspector's Signature Inspector's Name W. Moffat Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 04/19/2021 5b433c08aac70bf4-1618867835740 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Madison Fieldhouse Time Start 02:15 PM Client Madison School District Contractor Thompson paving Time End 03:30 PM Inspection Type(s) Earthwork Inspection Location(s) Sidewalk between field house and tennis courts on the East side of the building. Observations/ Remarks We loaded the gauge into the truck at 2:20pm and arrived at the site out of proximity 2:50 PM. We got four passing tests on the three quarter base and informed the superintendent. We left the site at approximately 3:15 pm to return to the lab to return the gauge at approximately 3:30 pm. Items observed are in general conformance with approved project documents and jurisdictional requirements.