HomeMy WebLinkAboutSHORT FORM -07-00220 - 309 Oaktrail Dr - New SFR,T
i4�.• i : � � _ a S, fr'• Y7A-:'S � r �+ T ;y -"7 a ryad.." "} ' _,
F r
r
r,
Load Short Form
Entire House
Job:
Date: Apr 04, 2007
B: Performance Aar 11
" p " .309 Oaktrail Dr-h-.-Kartchner
N
Qufside db (7), -6
Inside db (T) 70
Design TD (°F) 76
Daily range --
Inside humidity (%) -
Moisture difference (gr/lb) -
HEATING EQUIPMENT
Mace Bryant
Trade Plus 90t
Model 350AAV024440x
Efficiency 93..9 AFUE
Hating input 40000 Btuh
Heating output 38000 Btuh
Temperature rise 71 OF
Actual air flow 580 cfm
Air flaw factor 0.020 cfmlBtuh
Static pressure 0.65 in H2O
Space thermostat
ROOM NAME
Method
Construction quality
Fireplaces
Infiltration
Simplified
Semi -loose
0
COOLING EQUIPMENT
Make Bryant
Trade Legacy RNC 13 R22 AC
Cond 11 Rel ,G 01 -
il *241 **+AA
Efficiency 14 SEER
E
Sensibie cooling 12180 tuh
Latent cooling 5220
tib
Total cooling 17400 Btuh
Actual air flow 580 cfm
Air flow factor 0.071 f/tu
Static pressure O�65 j
Lord sensible beat ratio 1.00
Area Hag load Gig load Htg AVF
(ft2) 1 (Btuh) (Btuh) (Cf M)
Master Bath
� 81
WIC
81
Master Suite
168
Dieing
126
Kitchen
126
Bedroom 2
143
Bath
60
Family
309
Bedroom 3
118
F. Family Room
kgs
Future Bedraam
168
Future Bath
72
Laundry
gg
Future Bedroom 2
143
Mechanical
35
Clg AVF
(Cfm)
1734
329
35
23
1474
204
30
15
1468
820
30
58
1166
316
24
23
1166
1464 1
24
1 �}4
2295
653
47
47
849
129
17
g
4610
1140
94
.8 i
261
836
53
60
5287
1108
has
79
1 674
421
34
30
691
17
14
1
9970
29
24
2
1981
665
40
47
295
7
6
0
Printout ifi d by ACOA to meet all requirements f M2nual JP
fall
I A -- do
""'r-1 Ej F t5C>ft Right -Suite Residential 6.0, 101 R.P,40767
Aaff-K CADocuments and eing�ffiDocurrrnts�Heat Ioad\KartchnerWeado+ Brook , r-rp
laic = MJ8 Ori
PDF created with pdfFactory trial version www. dffacto .com
2007 -Apr -10 10:57,50
MAY 14 W.1gel
CiTy
............ hi4 Lf k Lj U n,
Entire House 2424 28472 8137
Other equip Toads 4881 899
Equip. a.94 R -SM 8494
Latent cooling Q
TOTALS
2424
33353
Printout certified by ACOA to meet ail requirements of Manual J 8th Ed.
:. r -I ttRight-Stiff Residential B_0.101 PSR40767
L ACC K, CADocumentsand ettings�MN!y DacumentsNHeat b2d's�Kartchner\Meadow Brood; A.rrp Calo = MA (Dr -I
PDF created with pd-fFactory trial version www. dffacto .com
2007 -Apr -ID M57-150
Page
dO 7
P E. R rt 0 R N1 A N'IrZ EF
�t� iae;*
Building
Analysis
f=nure tiouse
Job:
Date: Apr 04, 2007
By: Performance Air 11c
For:
Location.
Idaho Falls,
Eievation:
Latitude:
ID, US
4741 ft
44°N
Outdoor:
Dry bulb (T)
Davy range{°F}
Wef bulb (°F)
Wind speed (mp.h)
Heating
-s
15.0
Gaoling
89
34 �
60
7,5
Indoor:
Indoor temperature (°F)
Design TD 4°F}
Rela�ive humidity
Moisture difference (gr/lb)
infiltration:
H 7 Method
Construction quality
Fireplaces
Pleating
70
7s
so
[sib
Simplified
Sera i -loose
0
Coaling
75
14
50
-31.5
Component Btuhlft2 Btuh % of load
Falls
4.9 12193
36.6
Glazing
26.6 3937
11.8
Doors
29.6 1 245
Doors
Ceilings
2.0 2305
7.
Floors
1.4 1750
5.2
Infiltration
6952
20.8
Ducts
0
0.0
1ping
0
0.0
Humidification
0
0.0
Ventilation
4881
14.6
Adjustments
0
Internal gains
Total 1
333531
100.0
Lr 4 rW
Ion
ComponentF-13tuh/ft2 F Btuh I % of load
Walls
03
661
7.3
Glazing
17.7
2616
29.0
Doors
7.2
3033.4
Ceilings
1.1
1324-:
14.6
Floors
0.0
0
0.0
infiltration
0 .
653
7.2
Ducts
0
0.0
Ventilation
899
10.01
Internal gains
2580
28.6
Blower
i u t nt
Total
9036
100,0
Overall -value = 0.053 Btuh/ t -OF
Data entries checked
Glyn
mM f #
Coi lI gs
terrLal Gains
vv1 Fifit-Suite Re rd ntial 6.0.101 RSR40767
CADocuments and SetfingskMMy DocumentHeat loadskKartchnerWeadow Brook A.rrp C21r, = M38 Cri Pace I
PDF crewed with pdfFactory trial version www.pdffacto[y.com
y
V E 11 r- o n �)oj A N
Component Constructions
Entire House
Job:
Date
Apr 04, 2007
Performance Atr 1I
For:
Lti n
Idaho Falls, ID, US
Elevation: 4741 ft
Latitude: 440N
Outdoor: Heating
Dry bUb (OF)
Daily range T -
W t bulb (OF) -
Wind speed (mph) 15.0
Indoor:
indoor tempera#ure (OF)
Design TD (OF)
Relative humidity
Cooling Moisture difference (gr/lb)
Infiltration:
34 H 3 Method
60 Construction quality
7•5 Fireplaces
Construcfion descriptions Or
Walls
1 5B1 1-O - : Basement - 841 concrete, wood f.rarnii
ng, interior finish,
R-11 cavity, no board insulation,
1 F -O : Wood stud frame,, siding or stucco, no board insUhtion,
R-21 1 cavity insulation
Partitions
{none}
Windows
61A: Vynal Frame Due! Gazed, clear low -e; NFRC rated
(SHGC-0.34)
Doors
11 DO: Wood door, solid core, no storm
Ceilings
1 - ads Ceiling under vented attic, no radrant barr=ier, dark
shingles, R-38 insulation
Floors
1 B- 0c. Carpeted basement floor, R-3 or higher ins ul, 20 -'wide
Heating
70
76
50
61.5
Simplified
Semi' -loose
0
Coaling
75
14
50
-31.5
Area
U-vallue
Insul R
Htg HTM
Loss
C1g HTM
Gain
2
Btu hMt -`F
W-DF1173tuh
Bt-Uh/ftz
Btu
Btuh F
Btu.
n
384
0.056
11.0
4.87
1870
0.06
24
248
0.056
11.0
5.07
1 258
0.08
21
S
400
0.056
11.0
4,97
1990
0.07
30
232
0.056
11.0
4.90
1138
0.07
1
all
1264
0.056
11.0
4.'
6255
0.07
90
n
356
0.065
21.0
4.94
1 759
0.47
169
e
248
0.065
1.
4.94
1 225
0.47
115
371
0.065
21.0
4.94
1 833
0.47
176
.227
0,065
21.0
4.94
1121
0.47
10
all
1202
0.065
21.0
4,94
5938
OT47
570
n
32
0.350
0,0
26.6
851
11.4
363
n
60
0.350
0.0
26.6
1596
1 1A
681
16
0.350
0.0
26.6
426
20.2
323
4
0.350
0.0
26.6
638
20.2
485
16
0.350
U
26.6
426
36.7
587
all
148
0.350
0.0
26.6
3937
16.5
2440
1
0.390
0.0
29,6
622
7.22
152
1
0.390
0.0
29.6
622
7.22
152
all
42
0,390
0.
29.6
1 245
7.22
303
1212 0.026 38.0 1 T98 2395 1.09 1324
1212 0,019 3.o 1.44 1750 OM 0
VV r'l !D h t S C�>ft R I gh t -S u fte R es i d en ti aJ 6, 0. 10 1 R S R40 767
CADccuments and SettingsB\MyDO umerit \Heat foa'd � arthnr� endow Brook, A.rrp Calc = mja ori
PDF created with pdfFactory trial version www.pdffacto[y.com
2007 -Apr -lo 10-57:50
Page 1
'ter rI g htsc>ft
le�lk
Righ t -S cite Residant [al 6 _C).101 RS 840 767
PDF created with pdfFactory trial Persian www, dffacto ,com
2007 -Apr -10 10-57:50
Page
r.
P 1-1' R NIAN
Project
Entire House
Job:
Date;
By:
Apr 04, 2007
Performance Air tic
For;
Notes-,
Weather., Idaho Falls, 1D, U5
Winter Design Conditions
Outside db -6 9F
Inside db 70 OF
Design TD 76 °F
Heating Summary
Structure
Ducts
Central ventcfm)
Humidification
Piping
Equipment load
Infiltration
Method
Construction quality
Fireplaces
Area (ft;!)
Volume (ft3)
Air changes/hour
Equiv. AVF (cfm)
Summer Design Conditions
Outside db 89 OF
Inside db 75 OF
Design TD 14 h
Daily range H
Relative humidity %
Moisture difference -31
Mb
Sensible Cooling Equipment Load Sizina
28472
Btuh
Structure
8137
Btuh
0
4881
Btuh
Btuh
Duds
Central vent (7'Q cfm)
(}
899
Btuh
Btuh
d
D
Btuh
Btu
Blower
0
Btuh
33353
Btuh
Use manufacturer's data
n
Rate/swing multiplier
0.94
Equipment sensibie load
8494
Btuh
Heating
2424
12120
0.49
99
Simplified
Semi -loose
0
Cooling
2424
12120
0,25
1
Heating Equipment Summary
Make Bryant
Trade Pius 90t
Madel 350AAV024040x
Efficiency
Heating input
Heating output
Temperature rise
Actual air flow
Air flow factor
Static pressure
Space thermostat
93.9
AFUE
40000
Btuh
38000
Btuh
71
QF
580
cfm
0.020
cfmlBtuh
0.65
in H2O
Latent Cooling Equipment Load sizing
Structure
Ducts
Central vend (70 cfm)
Equipment latent load
292 Btuh
Btuh
-1250 Btuh
Uh
Equipment total load 8494 Btuh
Req. total capacity at 0.70 SHR 1.0 ton
Cooling Equipment Summary
Malo Bryant
Trade Legacy SNC 13 R22 AC
Coed 113RN(A,G)018-q
Coif CNRH*241 7A**+355AAV0420$0
Efficiency 14 SEER
Sensible cooling 12180 Btuh
Latent cooling 5220 Btuh
Total cooling 17400 Btuh
Actual air flow 580 cfm
Air flow factor 0.071 cfmlBtuh
statIC pressure 0.E5 in. H20
Load sensible heat ratio 1.00
Printout certified by ACCA to meet CJI requirements of Manual J 8th Fd.
i: '_ N^fIrI Fight -Suite Res 1 R S R407 7
AC�QN C:Mocurnents and SettingS\MMy DocumentsNF!eat loads�KartchnerWeadow Brook A.FTP Calc -_ MA Od
PDQ created with pdfFactory trial vers€on www. dfFacta .com
2007 -Apr -10 10:571-50
Page I
Main Floor
-al
MAIN FLOOR PLAN
Jab #:
Performed by Performance Air 11c, for.
PAF created with pdfFactory trial version www.pdffactory,com
� a'�1�- uar �► �n r'uu fru �,i � � � � • rg5
�. .� ..av-r� ti+ti■i i 4:?W i1 pe . r'C'4l■L X31'
A
IT -4 1/J'
� F
"
nAL asp
!,p fi' IL
a
Q
4'-U' i 4 -CF'
4+= A- 1%4
]
1
r[kit ox's
`
t
7-4 1/1'
1 V-4 �
1
-U'
P-71
r-3 Imo'
41-1
x 1R� a ❑
-24 of e I
rL ;.
M1 r `*
Master Bath
122
.- C]NG
[# NI
1.2" 9'x 9 7'- I l
ROOMa�r��■
do
r. L i2
Badrcom 24
-
Master Sal
!
t
Dini ng K1tch,
J I!
{
}
91
ti
5'
.�]
NJ
frFl W
3C
J
rj '`' S'
-9 1/1, Fies-a LAM]
115=1'J'
TWO Wu
Y
0
Li
LJ APAGE
+
Qe droern 313
y
a
COVERED
60
vim AWJI
Cfm
--- ------_--_-
I
E-1
59-1
E
J
I
I
I
r
#
I
61
I
It
MAIN FLOOR PLAN
Jab #:
Performed by Performance Air 11c, for.
PAF created with pdfFactory trial version www.pdffactory,com
� a'�1�- uar �► �n r'uu fru �,i � � � � • rg5
�. .� ..av-r� ti+ti■i i 4:?W i1 pe . r'C'4l■L X31'
A
- $"
f
nAL asp
!,p fi' IL
7
Q
4'-U' i 4 -CF'
4+= A- 1%4
]
1
r[kit ox's
t
aLAZY. 01M
1
Scale: I t 147
page 1
Right -Suite Residential
6.0.101 RS R4,076 7
2007 -Apr -1 0 10:57:57
C,ADOCuments and Settings\B\My
L_
Basement
BAHMENT FLDOR PLAN
5Q&Z- I/V - I' -q.
Job #:
Performed by Performance Aar 11c for-,
PDF created with pdfFactory trial version www.iDdffa.ctoU.com
WINCIM SCHEDULE
IL_�
F.CO&E P -M
M .M[RMN
Scale, 1 : 147
P2
Right -Suite Residential
6.0-101 RSR40767
20C7 -Apr -JO 10:57.57'
CADocuments and ngsTNY..,
F`EnFORKEMN
Duct System Summary
max.7P
Entire House
Job:
Date., Apr 04,, 2007
By : Performance Air 11
For.0
External static pressure
Pressure losses
Available static pressure
Supply return available pressure
Lowest friction rate
Actual air flow
Total effective length (TEL)
Heating
0.65
in H2O
0.34
in H2O
0.31
in H2O
0.24/0-07
in H2O
0.078
in/I 00ft
580
cfm
f
397 tt
Cooling
0.65
in H20
0.34
in H20
0.31
irk H2O
0.24/0-07
in H2O
0.078
in/1 00ft
580
cfm
Design Htg Glg Design lista Rett
Duct Actual Ftg.Eqv
Name tuh f fr F Si a
(in) M tl Lr(ft) Ln (ft) Trunk
Master Bath h 1734 35 23 0.078 6 OX 0 ShMt 53.0 255.
Master suite h 204 30 15 0.000 0 Ox 0 S h Mt 0.0 0.0
Master Suite -A C 410 15 29 0.083 6 OX 0 S h t 46.0 245
DI-ning C 410 15 29 .i 6 OX 0 S1t 41.0 255.E
Kitchen h 1166 24 23 0.087 6 OX 0 Sht 31.0 245,E
Bedroom 2 C 1464 24 104 0.186 6 OX 0 ShMt 24.0 105.0 st2
Bath h 2295 47 47 0.202 6 OX 0 ShMt 24.-0 95.0 sti
Bedroom 3 h 4610 94 81 0.219 6 OX 0 St 15,0 95.0 st2
F. Family Roonn G 836 53 60 0.2171 6 OX 0 Sht 16.0 95.0 StI
Future Bedroom h 5287 108 79 0.127 6 OX 0 h lit 20.0 170.0 t
ShMt 12.0 105.0
Fu���� BathLaundry h 1 1 t1
.1 1 h t 15.E
Future Bedroom 2 h 1170' 24 2 0.221 6 OX 0 S ht 14.0 95.0 st2
Mechanical C 665 40 47 0.131 6 OX 0 Stitt 14.E
0-1961 6 1 OX 0 S Mt 8.0 115.0 st2
_VVr_l g HtS C:)ft Right -Suite ResidentiiaJ 6.0.101 RSP,40767
-\Documents and Sattings\BWy DocumentsHeat Joads artchner\Meadow Brook A,.rrp Caja = j8 ri
PDF created with pdfFactory trial version wWw`pdffactQry_eam
2007 -Apr -lo 10,57-50
Page
ig
Trunk Htg C19 Design Veloc Dam Recd Duct Qac#
Name Tyke (CfM) (CfM) FR {fpm} (in) Size {in} Material
st213 Peak AVF 89 104 D_081 470 6 8 x 4 ShtMetd
stl B Peak AIF 14 1 0.117 63 3 8 x 4 ShtMefl
stIA Peak AVF 72 58 0.131 323 5 8 x 4 ShtMetl
st1 Peak AVF 206 194 0,202 617 7 H x fi S htMet]
st2 Peak AVF 344 372 0.186 836 9 8 x 8 Sh#Met!
st2A Peak AVF 197 183 0.127 590 7 8 x 6 ShtMetl
st2C Peak AVF 35 23 0.078 759 4 8 x 4 ShtMeti
Trunk
t2
tI
St I
Right-SuiteResiden.tial6,C),ioiRSR40767
CADocuments and SettingsILDWy nocumentskHeatl c \J rt h r m e a cf o �c f 1_ f I I ,� LTi
PDF created with pdfFactory trial version www.iDdffactory.com
2007 -Apr -IC) 10=57:5D
Page