Loading...
HomeMy WebLinkAboutNOTES - 07-00055 - Bart Stevens - S 2nd E - Valley View Div 6 PH3 - Final PlatFindings of Fact City of Rexburg 12 North Center Phone: 208.359.3020 Rexburg, 1D 83440 www.rexburg.org fox: 208.359.3022 Valley View, Division 6, Phase 3 Final Plat CITY 0H REXBURG .......... �............... OW ...................-.... Amerirn� Family Community 1. On February 15, 2007, Schiess' & Associates presented to the Rexburg Planning & Zoning Coordinator a Request and Application for a Final Plat for Valley View, Division 6, Phase 3. 2. On March 1, 2007, Gary Leikness presented to the Rexburg Planning & Zoning Commission the Request for approval of the Final Plat for Valley View, Division 6, Phase 3. David Stein motioned to recommend to City Council to approve the Final Plat for Valley View Division 6, Phase 32 with the condition that the staff review issues be resolved prior to the plat being signed. Dan Hanna seconded the motion. None opposed. Motion carried. 3. On March 7, 2007, Council Member Young moved to approve the Final Plat for Valley View Division 6, Phase 3 with City Attorney Zollinger's suggested restrictions notated on the final plat. The restrictions on the final plat would state: 1. No primary access to the major arterial from adjoining lots; 2. Lots are adjacent to a major arterial; 3. Lots will comply with arterial design standards at the time building permits are requested. Council Member Mann seconded the motion; Discussion: the developers/builders in the room agreed this is a reasonable request. City Attorney Zollinger explained Planning and Zoning Administrator Gary Leikness will design a few different options that will qualify under the restrictions given. Some applicants may want a stone wall; others may want a vinyl wall, or. a berm with a rod iron fence. All the options will be acceptable to Planning and Zoning and then the developer will make an election on which option to choose to make the fences uniform around the area. Mr. Stevens said this is a really good idea because this will give a range in prices for how much lots will cost as well. Mayor Larsen called for a vote: All voted aye; none opposed. The motion carried. bQWt E5 Findings of Fact City of Rexburg 12 North Center Phone: 208.359.3020 Rexburg, ID 83440 www.rexburg.org fax: 208.359.3022 Valley View, Division 6, Phase 3 Final Plat C I T Y O P REXBUR•.J CAU America's Family Community 1. On February 15, 2007, Schiess & Associates presented to the Rexburg Planning & Zoning Coordinator a Request and Application for a Final Plat for Valley View, Division 6, Phase 3. 2. On March 1, 2007, Gary Leikness presented to the Rexburg Planning & Zoning Commission the Request for approval of the Final Plat for Valley View, Division 6, Phase 3. David Stein motioned to recommend to City Council to approve the Final Plat for Valley View Division 6, Phase 3, with the condition that the staff review issues be resolved prior to the plat being signed. Dan Hanna seconded the motion. None opposed. Motion carried. 3. On March 7, 2007, Council Member Young moved to approve the Final Plat for Valley View Division 6, Phase 3 with City Attorney Zollinger's suggested restrictions notated on the final plat. The restrictions on the final plat would state: 1. No primary access to the major arterial from adjoining lots; 2. Lots are adjacent to a major arterial; 3. Lots will comply with arterial design standards at the time building permits are requested. Council Member Mann seconded the motion; Discussion: the developers/builders in the room agreed this is a reasonable request. City Attorney Zollinger explained Planning and Zoning Administrator Gary Leikness will design a few different options that will qualify under the restrictions given. Some applicants may want a stone wall; others may want a vinyl wall, or a berm with a rod iron fence. All the options will be acceptable to Planning and Zoning and then the developer will make an election on which option to choose to make the fences uniform around the area. Mr. Stevens said this is a really good idea because this will give a range in prices for how much lots will cost as well. Mayor Larsen called for a vote: All voted aye; none opposed. The motion carried. STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY 900 North Skyline Drive, Suite B " Idaho Falls, Idaho 83402 • (208) 528-2650 C.L. "Butch" Otter, Governor Toni Hardesty, Director June 16, 2008 Bart Stevens Stevens Construction 210 Nez Pearce Rexburg ID, 83440 Re: Valley View Division #6 Phase 2 Water and Sewer System Design, Saddleback Drive (water and sewer) Rexburg ID DEQ # 08-11-33 Dear Mr. Stevens We have reviewed the plans and specifications for the proposed water and sewer design. The project plans and specifications appear to meet State standards and are approved. Our approval is for the design. We will give final project approval after the systems are constructed. Deviations from the approved design that might result in violations of Idaho Regulations must be reviewed by this office before field installation. This office must be kept informed of the scheduling of all construction phases so that we can make spot inspections as necessary. Within 30 days after construction, a professional engineer registered in the State of Idaho must provide this office with as -built plans, or a letter of certification stating that the project was installed substantially according to the approved design. A copy of the approved design and specifications will be kept on file at this office. Please reference DEQ No. 08-11-33 when submitting any future correspondence related to this project. If you have any questions regarding this letter or if we can be of further assistance, please call me at (208) 528-2650. incer ly, Gregory Eager PE Engineering Manager Idaho Falls Regional Office C: Kellye Eager, EIPHD Chris Park PE, Schiess & Associates John Millar PE, Director of Public Works, City of Rexburg Carl Lohrengel, Idaho Division of Plumbing SCANNED 08-11.33 Valley View C)1 - pff-5v STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY 900 North Skyline Drive, Suite B • Idaho Falls, Idaho 83402 • (208) 528-2650 C.L. "Butch" Otter, Governor Toni Hardesty, Director July 10, 2007 Bart Stevens Stevens Construction 210 Nez Pearce Rexburg ID, 83440 Re: Valley View Division #6 Phase 3 Water and Sewer System Design, Rexburg ID DEQ # 07-09-33 Dear Mr. Stevens We have reviewed the plans and specifications for the proposed water and sewer design. The project plans and specifications appear to meet State standards and are approved. Our approval is for the design. We will give final project approval after the systems are constructed. Deviations from the approved design that might result in violations of Idaho Regulations must be reviewed by this office before field installation. This office must be kept informed of the scheduling of all construction phases so that we can make spot inspections as necessary. Within 30 days after construction, a professional engineer registered in the State of Idaho must provide this office with as -built plans, or a letter of certification stating that the project was installed substantially according to the approved design. A copy of the approved design and specifications will be kept on file at this office. Please reference DEQ No. 07-09-33 when submitting any future correspondence related to this project. If you have any questions regarding this letter or if we can be of further assistance, please call me at (208) 528-2650. Sincerely, William Te sG cher PE Water Quality Engineer Idaho Falls Regional Office C: James Johnston, Regional Administrator Chris Park PE, Schiess & Associates John Millar PE, Director of Public Works, City of Rexburg Kellye.Eager, D7HD IF Carl Lohrengel, Idaho Division of Plumbing SCANNED 07-09-33 Valley View ,j 'l_ 1 0 2007 May 21 07 03:17p Madison County Pand Z 208-359-6261 p.2 Mountain River, Inc. CONSULTING ENGINEERS AND LAND SURVEYORS May 16, 2007 VALLEY VIEW, DIVISION NO, 6-PHASE 3 SHEET 1 OF 1 1. Change the bearing along the Section line from the East 1 /4 Corner in your boundary description. It should be the some bearing as the North boundary line of the plat. 2. The Health Department has changed their name from DISTRICT 7 STATE BOARD OF HEALTH to EASTERN IDAHO PUBLIC HEALTH DEPARTMENT. 3. Show the Block number. 4. Remove the set 5/8" iron rod symbol from the pc and pt at the Northwest corner of Lot 15 and the Northeast comer of Lot 12 and replace with set 1 /2" iron rod. 5. Remove the set 5/8" iron rod symbol from the centerline of the drives that are not being platted. 6. Dimension the radius of the cul-de-sac for Westview Circle. 7. Dimension the width of the Right -of -Way for Westview Circle, 8. Dimension the Right-of-way of Westview Circle along the Boundary line of the division. 9. Remove all future development line work and lot information; it does not pertain to this division. 10. Label the POINT OF BEGINNING at the Northeast Boundary corner of the plat. 11. Check the bearing of the common line between Lots 11 and 12. 12. Change the dimension of the Northwest line of Lot 7 to add up with the adjacent lots. If you have any questions, please call. Jeff L. Williams 208-524-6175 1020 East Lincoln Road • Idaho Falls, Idaho 83401 Phone: (208) 524-6175 Fax:(208) 524-6181