HomeMy WebLinkAboutPERMIT NOTES - 07-00013 - Help U Sell - Remodel - Site PlanBuilding a reputation one job at a time
escobarj®byui.edv'
I
INTEGRITY
CONSTRUCTION & DESIGN
Permit # 07 00013
Help U Sell Remodel at 279 W. Main
Joe Escobar RCT-19833
Tel: 709-2294 exp.09/03/2008
Fire separation: There is 9' from the back fence to the back of the house. There is a vinyl
exterior with 1 'h" of wood then a 2x4 wall with a %:" fiber board and '/2" drywall. The garage is 16'
from the fence. The roof will be re -roofed with a 30yr composition shingle. The garage will be an
open conference/ multi use space.
Snow storage: See new parking lot plan
Parking configuration: See new parking lot plan
The total square footage of the house including the garage is 1426 sq. feet at 3 parking spots per
1000 square feet {that equates to a rounded up number of parking spots} 5 spots needed.
Site plan: We will do a Franch drain or similar for the parking lot. Yes, the existing
driveway will be removed.
If there are any questions, please contact Joe at 709-2294
JAh 2 2 2001
cl-r� 0 X_ BUUR ,
Thank you for the opportunity to do business with you.
Building a reputation one job at a time
escobagQbyui.edtr' _
Joe Escobar RCT-19M
Tel: 709-2294 exp.09/03/2008
INTEGRITY
CONSTRUCTION & DESIGN
Permit # 07 00014
Help U Sell Remodel at 279 W. Main
Permit notes: The electrician is Nick and Ryan Leishman with Legacy Electrical. The approx.
labor and materials are $1,000.00. We have a lot of calls into plumbers but have not contacted
with one yet, we will be using a licensed plumber. (any suggestions of one)C
Height review: The interior height is a minimum of 94" in the house and garage all doors are
36" by 82". There is an unusable basement with a ceiling height of only 68". The basement will not
be usable space.
Building fire review: The house is 9' from the fence with a vinyl exterior and 1 %," of wood 2x4
constructed with a'/2" fiber board and'h" drywall. The garage is 16' away from the house and has
the same exterior with a'h" drywall. The garage walls are r-11 and the ceiling is r-19.
Structural review: The garage is already on a solid concrete foundation. We will be bricking the
north and west walls from the ground to approx. 42" up then a stucco exterior will be on the rest.
See attached handicap ramp plans.
Miscellaneous: See floor plans with ramp door width and exit doors and signs
Energy review: The house has existing heat and duct work. Nick Leishman will wire the garage
for 3 fan forced baseboard heaters.
Exiting review: None of the rooms will be classroom or assembly
Accessibility review: See attached bathroom ADA plans
Thank you for the opportunity to do business with you.
escobaq@byui.edu
...-.
Building a reputation one job at a time
INTEGRITY
Joe Escobar RCT-19833
Tel: 709-2294 exp.09/03/2008
0600013
CONSTRUCTION & 0ES16! Help U Sell Remodel -Site Plan
Permit # 07 00013-4
Help U Sell Remodel at 279 W. Main
January 26, 2007
Revisions 1/26/2007
Fire separation: I have spoken with the owner of C & L Body Shop and he has stated that he
would sign an easement agreement. So we will no longer need an IBC requirement.
Snow storage: See new parking lot plan
Parking configuration: I have adjusted it per our meeting... See new parking lot plan
Site plan: We will do a French drain or similar for the parking lot. Yes, the existing
driveway will be removed. I have noted on the parking plan the location of the exit signs, emergency
lights, and two city upgrades. I have shown the main sidewalk going attaching to the main entrance.
If there are any questions, please contact Joe at 709-2294
� �CEJW E
JAN 2 6 2007 D
CI'Pe OF REXBURG
Thank you for the opportunity to do business with you.
Page 1 of 1
Gary Leikness
From: Gary Leikness
Sent: Monday, January 22, 2007 4:50 PM
To: JaNell Hansen
Subject: Help U Sell- Planning Comments 1 M 0M 1.3
Jenell,
After reviewing the initial site plan submitted, the following are my comments:
1) Only 1 parking space can be compact, and should not be included as a parallel space, which need to be
up to 22-feet long.
2) A minimum of 10 percent of the parking area needs to be designated as snow storage.
3) Old driveway should be removed and restored to landscaping.
4) Ramp/walkway should be located a minimum of 6-feet from the building facade.
5) New pedestrian walkways need to be constructed of either pavers, bricks, or scored concrete.
6) Need to provide at least two pedestrian/community features (see Development Code Section 4.13(13)(xi).
7) Should provide wheel stops for parking spaces that are adjacent to building.
8) Not shown on site plan is the existing sidewalk from the front of the building. This sidewalk connection
should remain, or other designated pedestrian route (min 5-feet wide) to a public right-of-way needs to be
provided.
Thanks,
Gary
Gary Leikness
Planning and Zoning Administrator
19 E Main, PO Box 280
Rexburg, Idaho 83440
garyl@rexburg.org
208-359-3020 ext. 314
1 /22/2007
35/-(0Sr6
s (c A Ac)4? ss� iS
MA S
f� CGS AC�Aj >
rl�
Joc
c�on��iz��G li= LC)
ui�p ![ L- /✓D% �C f�Dly6 f% /y CLC Gj/C (�L
ZZ
f'
5�a —