HomeMy WebLinkAboutCOMCHECK - 08-00440 - Boice Buildin005
COMcheck Software Version 3.5.3
Envelope Coi
2006 IECC
08 00439 & 08 00440
Boice Bldg #2
1087 Summers Dr
Report Date: 08/22/08
Data filename: S:\Scott\Year 2008\2008-159-Boice Commercial Building #2\BoiseBuilding2.cck
Section 1: Project Information
Project Type: New Construction
Project Title :
Construction Site:
Owner/Agent:
Section 2: General Information
Building Location (for weather data):
Rexburg, Idaho
Climate Zone:
6b
Heating Degree Days (base 65 degrees F):
8693
Cooling Degree Days (base 50 degrees F):
1446
Vertical Glazing / Wall Area Pct.:
21%
Activity Tyoefs) Floor Area
Office 3458
Section 3: Requirements Checklist
Envelope PASSES Design-23°A better then code.
Climate-Specific
Designer/Contractor:
NamelDescription
Gross Area
Cavity
Cont.
Proposed
Budget
or Perimeter
R-Value
R-Value
U-Factor
U-Factor
Roof 1: All -Wood Joist/Rafter/Truss
3442
38.0
0.0
0.027
0.034
Exterior Wall 1: Wood Frame, Any Spacing
2600
19.0
0.0
0.067
0.089
Window 1: Vinyl Frame:Double Pane with Low-E, Clear, SHGC 0.63
573
•--
--
0.320
0.350
Door 1: Glass, Entrance Door, SHGC 0.70
20
—
--
0.320
0.800
Basement Wall 1: Solid Concrete:8" Thickness, Medium Density,
2340
0.0
13.0
0.063
0.351
Furring: Wood, Wall Ht 9.0, Depth B.G. 8.0
Floor 1: Slab-On-Grade:Unheated
260
---
—
---
---
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
Air Leakage, Component Certification, and Vapor Retarder Requirements:
1. All joints and penetrations are caulked, asketed or covered with a moisture va or- ermea �.ty to I i to c
1 P 9 P P 9 2 `1� �P `�
with the manufacturers installation instructions.
Cj 2. Windows, doors, and skylights certified as meeting leakage requirements.
3. Component R-values & U-factors labeled as certified. CC — 8 2008
0 4. Insulation installed according to manufacturers instructions, in substantial contact with the being insulated, and in a m 1
achieves the rated R-value without compressing the insulation.
* ❑ 5. No roof insulation is installed on a suspended telling with removable ceiling panels.t 1 1
17 6. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the buildin a bD ear ui RU
dampers.
7. Cargo doors and loading dock doors are weather sealed.
❑ 8. Recessed lighting fixtures are: (i) Type IC rated and sealed or gaskeled: or (ii) installed inside an appropriate air -tight assembly with a
0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material.
Project Title: Report date: 08/22/08
Data filename: S:\Scott\Year 2008\2008-159-Boice Commercial Building #2\BoiseBuilding2.cck Page 1 of 2
Q 9. Building entrance doors have a vestibule and equipped with closing devices.
Exceptions:
Building entrances with revolving doors.
Doors that open directly from a space less than 3000 sq. ft. in area.
10.Vapor retarder installed.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2006 IECC
requirements In COMcheck Version 3.5.3 and to comply with the mandatory requirements in the Requirements Checklist.
Name - Title
Project Notes:
Previously saved project information:
Boice Building
Valley Wide Business Park
Design Intelligence, LLC
Scott A Spaulding, P.E.
Signature Date
Project Title: Report date: 08/22/08
Data filename: SAScott\Year 200812008-159-Boice Commercial Building #21BoiseBuilding2.cck Page 2 of 2
COMcheck Software Version 3.5.3
Interior Lighting Compliance
Certificate
2006 IECC
Report Date: 09/02/08
Data filename: Unfitled.cck
Section 1: Project Information
Project Type: New Construction
Project Title : Boice Office
Construction Site:
Owner/Agent:
Section 2: General Information
Building Use Description by: Activity Type
Activity Tvoelsl Floor Area
Office 2500
Section 3: Requirements Checklist
Interior Lighting:
1. Total proposed watts must be less than or equal to total allowed watts.
Allowed Watts Proposed Watts Complies
2500 2432 YES
Controls, Switching, and Wiring:
1-1 2. Independent controls for each space (switch/occupancy sensor).
Exceptions.,
Designer/Contractor:
Areas designated as security or emergency areas that must be continuously Illuminated.
Lighting in stairways or corridors that are elements of the means of egress.
❑ 3. Master switch at entry to hotel/motel guest room.
❑ 4. Individual dwelling units separately metered.
❑ 5. Each space provided with a manual control to provide uniform light reduction by at least 50%.
Exceptions:
Only one Iuminaire in space;
An occupant -sensing device controls the area;
The area is a corridor, storeroom, restroom, public lobby or sleeping unit.
Areas that use less than 0.6 Watts/sq.ff.
Lj 6. Automatic lighting shutoff control in buildings larger than 5,000 sq.it.
Exceptions:
Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security.
❑ 7. Photocell/astronomical time switch on exterior lights.
Exceptions.,
Lighting intended for 24 hour use.
O 8. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts).
Exceptions:
Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair.
Project Title: Boice Office
Data filename: Unfitled.wk
Report date: 09/02/08
Page 1 of 5
Section 4: Complianc,,�tatement
Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2006 IECC
requirements in COMcheck Version 3.5.3 and to comply with the mandatory requirements in the Requirements Checklist.
Name - Title
Project Title: Boice Office
Data filename: Untitled.ock
Signature Date
Report date: 09/02/08
Page 2 of 5
COMcheck Software Version 3.5.3
Interior Lighting Application
Worksheet
2006 IECC
Report Date:
Data filename: Untitled.cck
Section 1: Allowed Lighting Power Calculation
Office
A B
Area Category Floor Area
2500
Section 2: Proposed Lighting Power Calculation
A
Fixture ID : Description / Lamp I Wattage Per Lamp / Ballast
C
D
Allowed
Allowed Watts
Watts / ffi
(B x C)
1
2500
Total Allowed Watts =
2500
B C
D E
Lamps/ # of
Fixture (C X D)
Fixture Fixtures
Watt.
Office (2500 sq.ft.)
Linear Fluorescent 1: 48" T8 32W / Electronic 4 19 128 2432
Total Proposed Watts = 2432
Section 3: Compliance Calculation
If the Total Allowed Watts minus the Total Proposed Watts is greater than or equal to zero, the building complies
Total Allowed Watts =
2500
Total Proposed Watts =
2432
Project Compliance=
68
Interior Lighting MSES: D-
Project Title: Boice Office Report date: 09/02/08
Data filename: Untitled.cck Page 3 of 5
COMcheck Software Version 3.5.3
Exterior Lighting Compliance
Certificate
Kii t tolo
Report Date: D9/02/06
Data filename: Unfitled.cck
Section 1: Project Information
Project Type: New Construction
Project Title : Boice Office
Construction Site: Owner/Agent: Designer/Contractor:
Section 2: Exterior Lighting Area/Surface Power Calculation
A B C D
E
F
Exterior Area/Surface Quantity Allowed Tradable
Allowed
Proposed
Wafts Wattage
Watts
Watts
I Unit
(C x D)
Parking area(s) 4000 ft2 0.15 Yes
600
400
Driveway 2000 ft2 0.15 Yes
300
520
Total Tradable Watts* =
900
920
Total Allowed Watts =
900
Total Allowed Supplemental Watts— =
45
• Wattage tradeoffs are only allowed between tradable areas/surfaces.
"A supplemental allowance equal to 5%of total allowed wattage may be applied toward compliance of both non -tradable and tradable
areas/surfaces.
Section 3: Exterior Lighting Fixture Schedule
A B C D E
Fixture ID: Description / Lamp I Wattage Per Lamp I Ballast Lampsl • of Fixture (C X D)
Fixture Fixtures Watt.
Parking area(s) (4000 ft2): Tradable Wattage
HID 1: Metal Halide 10OW / Electronic 1 4 100 400
Driveway (2000 ft2): Tradable Wattage
Incandescent 1: Incandescent 65W 1 8 65 520
Total Tradable Proposed Watts = 920
Section 4: Requirements Checklist
Lighting Wattage:
1. Within each non -tradable area/surface, total proposed watts must be less than or equal to total allowed watts. Across all tradable
areas/surfaces, total proposed watts must be less than or equal to total allowed watts.
Compliance: Passes using supplemental allowance watts.
Controls, Switching, and Wiring:
Q 2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting.
3. All nonexempt lighting fixtures shall be controlled by a photosensor or astronomical time switch that is capable of automatically turning
off the fixture when sufficient daylight is available or the lighting is not required.
Exterior Lighting Efficacy:
Project Title: Balm Office Report date: 09102/08
Data filename: Untitled.cck Page 4 of 5
4. All exterior building ground, inaires that operate at greater than t00W have minims fcacy of 60 lumen/watt.
Exceptions: 'err/
Exterior Lighting PASSES. Design 0.0,% helter than code.
Section 5: Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications
and other calculations submitted With this permit application. The proposed lighting system has been designed to meet the 2oD61ECC
requirements in COMcheck Version 3.5.3 and to comply with the mandatory requirements in the Requirements Checklist.
Name - Title Signature Date
Project Title: Bolce Office Report date: 09/02/08