Loading...
HomeMy WebLinkAboutCOMCHECK - 08-00440 - Boice Buildin005 COMcheck Software Version 3.5.3 Envelope Coi 2006 IECC 08 00439 & 08 00440 Boice Bldg #2 1087 Summers Dr Report Date: 08/22/08 Data filename: S:\Scott\Year 2008\2008-159-Boice Commercial Building #2\BoiseBuilding2.cck Section 1: Project Information Project Type: New Construction Project Title : Construction Site: Owner/Agent: Section 2: General Information Building Location (for weather data): Rexburg, Idaho Climate Zone: 6b Heating Degree Days (base 65 degrees F): 8693 Cooling Degree Days (base 50 degrees F): 1446 Vertical Glazing / Wall Area Pct.: 21% Activity Tyoefs) Floor Area Office 3458 Section 3: Requirements Checklist Envelope PASSES Design-23°A better then code. Climate-Specific Designer/Contractor: NamelDescription Gross Area Cavity Cont. Proposed Budget or Perimeter R-Value R-Value U-Factor U-Factor Roof 1: All -Wood Joist/Rafter/Truss 3442 38.0 0.0 0.027 0.034 Exterior Wall 1: Wood Frame, Any Spacing 2600 19.0 0.0 0.067 0.089 Window 1: Vinyl Frame:Double Pane with Low-E, Clear, SHGC 0.63 573 •-- -- 0.320 0.350 Door 1: Glass, Entrance Door, SHGC 0.70 20 — -- 0.320 0.800 Basement Wall 1: Solid Concrete:8" Thickness, Medium Density, 2340 0.0 13.0 0.063 0.351 Furring: Wood, Wall Ht 9.0, Depth B.G. 8.0 Floor 1: Slab-On-Grade:Unheated 260 --- — --- --- (a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: 1. All joints and penetrations are caulked, asketed or covered with a moisture va or- ermea �.ty to I i to c 1 P 9 P P 9 2 `1� �P `� with the manufacturers installation instructions. Cj 2. Windows, doors, and skylights certified as meeting leakage requirements. 3. Component R-values & U-factors labeled as certified. CC — 8 2008 0 4. Insulation installed according to manufacturers instructions, in substantial contact with the being insulated, and in a m 1 achieves the rated R-value without compressing the insulation. * ❑ 5. No roof insulation is installed on a suspended telling with removable ceiling panels.t 1 1 17 6. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the buildin a bD ear ui RU dampers. 7. Cargo doors and loading dock doors are weather sealed. ❑ 8. Recessed lighting fixtures are: (i) Type IC rated and sealed or gaskeled: or (ii) installed inside an appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material. Project Title: Report date: 08/22/08 Data filename: S:\Scott\Year 2008\2008-159-Boice Commercial Building #2\BoiseBuilding2.cck Page 1 of 2 Q 9. Building entrance doors have a vestibule and equipped with closing devices. Exceptions: Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft. in area. 10.Vapor retarder installed. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2006 IECC requirements In COMcheck Version 3.5.3 and to comply with the mandatory requirements in the Requirements Checklist. Name - Title Project Notes: Previously saved project information: Boice Building Valley Wide Business Park Design Intelligence, LLC Scott A Spaulding, P.E. Signature Date Project Title: Report date: 08/22/08 Data filename: SAScott\Year 200812008-159-Boice Commercial Building #21BoiseBuilding2.cck Page 2 of 2 COMcheck Software Version 3.5.3 Interior Lighting Compliance Certificate 2006 IECC Report Date: 09/02/08 Data filename: Unfitled.cck Section 1: Project Information Project Type: New Construction Project Title : Boice Office Construction Site: Owner/Agent: Section 2: General Information Building Use Description by: Activity Type Activity Tvoelsl Floor Area Office 2500 Section 3: Requirements Checklist Interior Lighting: 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 2500 2432 YES Controls, Switching, and Wiring: 1-1 2. Independent controls for each space (switch/occupancy sensor). Exceptions., Designer/Contractor: Areas designated as security or emergency areas that must be continuously Illuminated. Lighting in stairways or corridors that are elements of the means of egress. ❑ 3. Master switch at entry to hotel/motel guest room. ❑ 4. Individual dwelling units separately metered. ❑ 5. Each space provided with a manual control to provide uniform light reduction by at least 50%. Exceptions: Only one Iuminaire in space; An occupant -sensing device controls the area; The area is a corridor, storeroom, restroom, public lobby or sleeping unit. Areas that use less than 0.6 Watts/sq.ff. Lj 6. Automatic lighting shutoff control in buildings larger than 5,000 sq.it. Exceptions: Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security. ❑ 7. Photocell/astronomical time switch on exterior lights. Exceptions., Lighting intended for 24 hour use. O 8. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts). Exceptions: Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair. Project Title: Boice Office Data filename: Unfitled.wk Report date: 09/02/08 Page 1 of 5 Section 4: Complianc,,�tatement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2006 IECC requirements in COMcheck Version 3.5.3 and to comply with the mandatory requirements in the Requirements Checklist. Name - Title Project Title: Boice Office Data filename: Untitled.ock Signature Date Report date: 09/02/08 Page 2 of 5 COMcheck Software Version 3.5.3 Interior Lighting Application Worksheet 2006 IECC Report Date: Data filename: Untitled.cck Section 1: Allowed Lighting Power Calculation Office A B Area Category Floor Area 2500 Section 2: Proposed Lighting Power Calculation A Fixture ID : Description / Lamp I Wattage Per Lamp / Ballast C D Allowed Allowed Watts Watts / ffi (B x C) 1 2500 Total Allowed Watts = 2500 B C D E Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Office (2500 sq.ft.) Linear Fluorescent 1: 48" T8 32W / Electronic 4 19 128 2432 Total Proposed Watts = 2432 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Proposed Watts is greater than or equal to zero, the building complies Total Allowed Watts = 2500 Total Proposed Watts = 2432 Project Compliance= 68 Interior Lighting MSES: D- Project Title: Boice Office Report date: 09/02/08 Data filename: Untitled.cck Page 3 of 5 COMcheck Software Version 3.5.3 Exterior Lighting Compliance Certificate Kii t tolo Report Date: D9/02/06 Data filename: Unfitled.cck Section 1: Project Information Project Type: New Construction Project Title : Boice Office Construction Site: Owner/Agent: Designer/Contractor: Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Wafts Wattage Watts Watts I Unit (C x D) Parking area(s) 4000 ft2 0.15 Yes 600 400 Driveway 2000 ft2 0.15 Yes 300 520 Total Tradable Watts* = 900 920 Total Allowed Watts = 900 Total Allowed Supplemental Watts— = 45 • Wattage tradeoffs are only allowed between tradable areas/surfaces. "A supplemental allowance equal to 5%of total allowed wattage may be applied toward compliance of both non -tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C D E Fixture ID: Description / Lamp I Wattage Per Lamp I Ballast Lampsl • of Fixture (C X D) Fixture Fixtures Watt. Parking area(s) (4000 ft2): Tradable Wattage HID 1: Metal Halide 10OW / Electronic 1 4 100 400 Driveway (2000 ft2): Tradable Wattage Incandescent 1: Incandescent 65W 1 8 65 520 Total Tradable Proposed Watts = 920 Section 4: Requirements Checklist Lighting Wattage: 1. Within each non -tradable area/surface, total proposed watts must be less than or equal to total allowed watts. Across all tradable areas/surfaces, total proposed watts must be less than or equal to total allowed watts. Compliance: Passes using supplemental allowance watts. Controls, Switching, and Wiring: Q 2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting. 3. All nonexempt lighting fixtures shall be controlled by a photosensor or astronomical time switch that is capable of automatically turning off the fixture when sufficient daylight is available or the lighting is not required. Exterior Lighting Efficacy: Project Title: Balm Office Report date: 09102/08 Data filename: Untitled.cck Page 4 of 5 4. All exterior building ground, inaires that operate at greater than t00W have minims fcacy of 60 lumen/watt. Exceptions: 'err/ Exterior Lighting PASSES. Design 0.0,% helter than code. Section 5: Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted With this permit application. The proposed lighting system has been designed to meet the 2oD61ECC requirements in COMcheck Version 3.5.3 and to comply with the mandatory requirements in the Requirements Checklist. Name - Title Signature Date Project Title: Bolce Office Report date: 09/02/08 Data filename: Untitled.xk Page 5 of 5