Loading...
HomeMy WebLinkAboutRESCHECK - 08-00437 - 1118 Coyote Willow Way - New SFRSep. 9. 2008 1:03PM Kartchner Homes No•9119 P. 2 'kd REScheck Software Ver Compliance C Project Title: Paul Scholes Report Date: 09/09/08 Data filename: C:lDocuments and SsWngsWohnlDesktoplPaul.rck Energy Code: 2006 IECC Location: Rexburg, Idaho Construction Type; Single Family BuBidng Orientation: Bldg. faces 180 deg. from North Conditioned Floor Area: 6256 ft2 Glazing Area Percentage; 9% Heating Degree Days; 8693 Climate Zone: 6 Construction Site: Rexburg, ID Owner/Agent: 0800437 I 118 Covote Willow Way-Scholes Compliance: 8.0 getter Than Code Maximum UA: 562 Your UA: 533 Designer/Contractor: Kartchner Homes 601 W. 1700 s. Logan. Ur 84404 (435) 755-7080 ..c,nuy r: nor a.einng or aossor i Nss 2518 49.0 D.0 65 Wall 1 Second floor: Wood Frame, 16" o,o. 1317 19.0 0.0 69 Orientation: Unspecified Window 1: Vinyl Fname:Double Pane 170 0.350 59 SHGC: 0.41 Orientation: Unspecified Wall $ Bonus room: Wood Frame, 24" o .c. 920 19.0 0.0 54 Orientation: Unspecified Floor 1: All -Wood Joist/iruss;Over Unconditioned Space 319 30.0 0.0 11 Floor 3: All -Wood Jolst/rrus%Over Outside Air 45 30.0 0.0 1 Wall Main Floor. Wood Frame, 16' o.c. 1968 19.D 0.0 106 Orientation: Unspecified Window 2: Vinyl Frame:Double Pane 128 0.350 45 SHGC: 0.41 Orientation: Unspedfled Door 1; Solid 38 0200 8 Orientation: Unspecified Door 2: Glass 34 0.350 12 SHGC: 0A1 Orientation: Unspecified Floor 2: All -Wood Jolstfrruss;Over Outside Air 18 30.0 0.0 1 Basement Wall 1: Solid Concrete or Masonry 1953 0.0 19e 72 Orientation: Unspecified Wall height 8.0' Depth below grade: 7.0' Insulation depth: 8.0' Window 3: Vinyl I mme:Double Pane 64 0.350 22 SHGC: 0.41 Orientation; Unspecified Door 3: Solid 40 0200 8 Orientation: Unspecified Furnace 1: Forced Hot Airilo AFUE Furnace 2: Forced Hot Air90 AFUE Project Title: Paul Scholes Page 1 of 5 Data filename- CADocuments and Sett ngsWohnlDesktoplPaul.rdt Report date; 09/09/08 Sep. 9. 2008 1:03PM Kartchner Homes No.9119 P. 3 Air Canditioner 1: Electric Central Airl3 SEER Compliance Statement The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2006 IECC requirements In RESchack Version 4.1.1 and corn y with the an atory requirements listed in the RES eck Inspection Checklist. ame - itl� Signature Bate Project Notes: Willow Brook Extates Black 3, Lot 1 Project Title: Paul Scholes Page 2 of 5 Data flenarne: CADocurnents and SettingsUohnU)ssktop%Paul.rck Report date: 09/09/08 Sep. 9. 2008 1:03PM Kartchner Homes No.9119 P. 4 f2TREScheck Software Version 4.1.1 Inspection Checklist Date: 09/09/08 Ceilings: U Ceiling 1; Flat Ceiling or Sdssor Truss, R-49.0 cavity insulation Comments: Above -Grade Walls: ❑ Wail 1 Second floor. Wood Frame, 16" o,c., R-19.0 cavity insulation Comments: U Wall 3 Bonus room; Wood Frame. 240 o .c., R-19.0 cavity insulation Comments: ❑ Wall 2 Main Floor: Wood Frame,1 Su o.c., R 19.0 cavity insulation Comments: Basement Walls: U Basement Wall 1; Solid Concrete or Masonry. 8.0' ht/ 7.0' bg / 8.0' insul, R-19.0 continuous insulation Comments: Windows; Q Window 1: Vinyl Frome:Double Pane, U-factor. 0.350 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments., ❑ 1Mndow 2: Vinyl Frame:Double Pane, U-factor: 0.360 For windows without labeled U factors, describe features: Wanes Frame Type Thermal Break? Yes No Comments: ❑ Window 3: Vinyl Frame:Double Pane, U-factor: 0.350 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? — Yes No Comments: Note: Up to 15 sq.ft. of glazed fenestration per dwelling is exempt from U-factor and SHGC requirements. Doom: ❑ Door 1: Solid, U factor. 0.200 Comments: U Door 2; Glass, U-factor: 0.350 Comments: ❑ Door 3: Solid, U-factor. 0200 Comments: Floors: ❑ Floor 1: Ali -Wood JoistlTruss:Over Unc onditloned Space, R-30.0 cavity Insulation Comments; Floor insulation is installed in 2ermanent contact with the underside of the subfloor decking. Project Title; Paul Scholes Page 3 of 5 Data filename: C.IDocuments and Settin9s1John%Desktop%Paul.rck Report date: 09/09/08 Sep. 9. 2008 1;03PM Kartchner Homes No,9119 P. 5 ❑ Floor 3: All -Wood Joist/Truss:Over Outside Air, R-30.0 cavity Insulation 1'nr"mAnhe- Floor insulation is Installed in permanent contact with the underside of the subfloor decking. Floor 2: Alf -Wood Joist/Truss-Over Outside Air, R-30.0 cavity insulation r-nrnms&nt,%- - - Floor insulation is installed in permanent contact with the underside of the subfloor deddng. Heating and Cooling Equipment: ❑ Furnace 1: Forced Hot Air: 90 AFUE or higher Make and Model Number. U Furnace 2: Forced Hot Air. 90 AFUE or higher Make and Model Number, (21 Air Conditioner 1: Electric Central Air. 13 SEER or higher Make and Model Number: Air Leakage: ❑ Joints. penetrations. and all other such openings In the building envelope that are sources of air leakage are sealed. ❑ Recessed lights are either 1) Type IC rated with enclosures sealed/gasketed against leaks to the calling, or 2) Type IC rated and ASTM E283 labeled. or 3) installed Inside an alr-tight assembly with a 0.5" clearance from combustible materials and a 3" clearance from insulation. Vapor Retarder: Vapor retarder is installed on the wann4n-winter side of all non -vented framed ceilings, walls, and floors; or It has been determined that moisture or its freezing will not damage the materials; or other approved means to avoid condensation are provided. Comments: Materials Identification: ❑ Materials and equipment are identified so that compliance can be determined. U Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. ❑ Insulation R-values, glazing U factors, and heating equipment efficiency are dearly marked on the building plans or specifications. ❑ Insulation is installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R-value without compressing the insulation. Duct Insulation: (-j Ducts in unconditioned spaces are insulated to R-8. U Ducts in floor trusses are insulated to R-5. Duct Construction: ❑ Air handlers, filter boxes, and duct connections to flanges of air distribution system equipment or sheet metal fittings are sealed and mechanically fastened. All Joints, seams, and connections are made substantially airtight with tapes, gasketing, mastics (adhesives) or other approved closure systems, Tapes and mastics are rated UL 181A or UL 181 B. ❑ Building framing cavities are not used as supply ducts. j Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. U Additional requirements for tape sealing and metal dud crimping are included by an Inspection for compliance with the International Mechanical Coda. Temperature Controls: Thermostats exist for each separate HVAC system. A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor is provided. Heating and Cooling Equipment Sizing: U Additional requirements for equipment sizing are included by an inspection for tompllance with the Intemational Mechanical Code, Circulating Hot Water Systems: ❑ Circulating hot water pipes are Insulated to R-2. U Circulating hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the system is not in use. Project Title: Paul Scholes (sage 4 of 5 Data filaname: C:IDocuments and Settings\JohnlDesktop%Paul.rck Report date. 09/09/08 - Sep. 9. 2008 1:04PM Kartchner Homes No.9119 P- 6 Heating and Cooling Piping Insulation: HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R 2. Certificate: A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values; window U.factors: type and efficiency of space -conditioning and water heating equipment. ' NOTES TO FIELD: (Building Department Use Only) Project idle: Paul Scholes Page 5 of 5 Data filename: C:1Docurnents and SeffingsUchnlDeslatop%Paul.rck Report date: 09/09/08 r Sep. 9. 2008 1:04PM Kartchner Homes No. 9119 P- 7 0® 2006 IECcr Energy Efficiency Certificate Ceiling I Roof 49.00 Wall 19.00 Floor / Foundation 30.00 Ductwork (unconditioned spaces): =-11 Window US 0.41 Door 0.20 0.41 Forced Hot Air Furnace 90 AFUE Forced Hot Air Furnace 90 AFUE Electric Central Air Conditioner 13 SEER Water Heater: Name: Date: Comments: