HomeMy WebLinkAboutMISC DOCS - 08-00501 - Wal-Mart - SignSHEET M3 - MECHANICAL SCHEDULES
FAN SCHEDULE
0 Add note 2 to General Information section per proto update.
BERNER AIR CURTAIN SCHEDULE
Revise model cumber of air curtain per proto update.
SHEET P1- ENLARGED PLUMBING PLANS
PLAN 4 - GARDEN CENTER PLUMBING PLAN
• Add note per proto update.
SHEET P2 - PLUMBING DETAILS
EMERGENCY THERMOSTATIC MIXING VALVE DETAIL
Revise note per proto update.
WATER HEATER DETAIL
• Revise detail to show vacuum relief valve.
SHEET P3 - PLUMBING SCHEDULES
NON -CUSTOMER PLUMBING FIXTURE SCHEDULE
0 Update model numbers per proto update.
FLOOR/ROOF DRAIN SCHEDULE
• Add FD2 per revised plumbing design.
• Add FS1 per revised plumbing design.
CLEANOUT/HOSE BIBB/HYDRANT SCHEDULE
• Revise material of FCO per proto update.
SHEET MPHI - PHARMACY MECHANICAL PLANS
PLAN 1 - PHARMACY MECHANICAL PLAN
• Update Floorplan per Architectural update.
• Revised HVAC design per relocation of Pharmacy.
F'LHfV 1 - F'I1fiFf lVlfiCY PLUMBING PLAN
Update Floorplan per Architectural update.
• Revise plumbing design per relocation of Pharmacy and proto updates.
DETAIL 3 - PHARMACY DVVV RISER
• Add floor drain under the sink per proto update.
DETAIL 4 - PHARMACY WATER RISER
• Replace keynote 15.407 with 15.408.
DETAIL 5 - WATER HEATER BELOW COUNTER
0 Add vacuum relief valve to water heater detail.
KEYNOTES
0 Replace keynote 15-407 with 15.408.
SHEET RPI - REFRIGERATION PLUMBING PLANS
PLAN 1 - REFRIGERATION PLUMBING PLANS
• Add sheet to set per Architectural update.
SHEET R1 - REFRIGERATION PLANS
PLAN 1 - REFRIGERATION PLANS
• Add sheet to set per Architectural update.
SHEET R2 - REFRIGERATION SCHEDULES
REFRIGERATION SCHEDULES
0 Add sheet to set per Architectural update
WAL-MART STORE NO. 187b
PROJECT:, RE,XBURG, ID
PROJECT N0. 0802021
ELECTRICAL
SHEET E1 - LIGHTING PLAN
PLAN 1 - LIGHTING PLAN
• Update Floorplan per Architectural update.
• Add Electronics Specialty Lighting busway per new Client criteria.
Revise plan callouts per new Floorplan.
KEYNOTES
• Add Keynotes 16.027, 16.127, and 16.148.
SPECIALTY LIGHTING NOTES
• Add notes to sheet.
LIGHTING GENERAL NOTES
• Revise notes per new Client criteria.
SHEET E1.1 - LIGHTING PLANS
PLAN 1 - REAR OFFICE LIGHTING PLAN
• Update Floorplan per Architectural update.
• Revise lighting layout for new rooms and walls.
KEYNOTES
• Add Keynote 16.S07.
SHEET E2 - POWER PLAN
PLAN 1 - REAR OFFICE LIGHTING PLAN
• Update Floorplan per Architectural update.
• Revise plan callouts per new Floorplan.
Add signage note.
POWER GENERAL NOTES
0 Revise notes per new Client criteria.
KEYNOTES
• Add Keynote 16.472.
SHEET E2.1 - POWER DROP PLAN
PLAN 1 - POWER DROP PLAN
� Update Floorplan per Architectural update.
• Revise locations of 46A and 18A power drops per new Floorplan.
• Revise planC211OUtSper new Floorplan.
SHEET E2.4POWER PLANS
PLAN 1 - VESTIBULE POWER PLAN
• Update Floorplan per Architectural update.
• Add power forice merchandiser.
SHEET E2.5 - POWER PLANS
PLAN 1 - REAR OFFICE POWER PLAN
• Update Fborplan per Architectural update.
• Add power for new bite -Ta -Story layout and new Bike Assembly.
• Revise plan callauts per new Floorplan.
PIAN 3 - RECEIVING ELECTRICAL PLAN
Add mounting heights to door belt and buzzer.
PLAN 4 - TRAINING ROOM POWER PLAN
• Update Floorplan per Architectural update.
•
Revise entire power layout per new Floorplan.
KEYNOTES
Add Keynote 16.477.
• Delete Keynote 16.472.
9
MARCH 13,2009
ADDENDUM NO. 1
WAL-MART STORE NO. 1878
PROJECT: REXBURG, ID
PROJECT NO. 0802021
MARCH 13, 2009
ADDENDUM NO. 1
SHEET E3 - ELECTRICAL DETAILS
DETAIL 1 -HORN/STROBE AND SECURITY SYSTEM CONDUITS
• Revise detail per new Client criteria.
SHEET E4 - PARTIAL ELECTRICAL RISER DIAGRAM
DETAIL 1 - PARTIAL ELECTRICAL RISER DIAGRAM
Revise Riser to include feeder for new Compressor House Assembly.
Revise Riser, to include lighting controls.
PLAN 3 - ELECTRICAL ROOM #1 PLAN
Add powerwall dernolition rote.
Q Add Contactor C1.
CONNECTED LARDS TABLE
f Reprise loads per updated plans.
KEYNOTES
Add new Keynotes 16.R58.
• Change previous Keynote 16.R58 to 16.R59.
SHEET E4.1 - ELECTRICAL SCHEDULES
PANELBOARD LIF SCHEDULE
• Revised schedule for new loads.
LIGHTING FIXTURE SCHEDULE
• Add Light Fixtures Type 50 and 57 to schedule.
Revise Note D per new Client criteria.
SAFETY SWITCH SCHEDULE
• Add new S2 for Compressor House Assembly.
CONTACTOR SCHEDULE
• Add schedule to sheet.
PANELBOARD NOTES
0 Revise nates pernew Client criteria.
SHEET EPHI - PHARMACY ELECTRICAL PLANS
PLAN 1 - LIGHTING PLAN
• Update Floorplan per Architectural update.
Revise entire lighting layout per new Floorplan.
PLAN 2 - POWER PLAN
• Update Floorplan per Architectural update,
Revise entire power layout per new Floorplan.
KEYNOTES
Add new Keynotes 16.125 and 16.131,
SHEET EM1 - ENERGY MANAGEMENT PLAN
PLAN 1 - RTU SENSOR LOCATION PLAN
• Update Floorplan per Architectural update.
Revise S-2 location per new Floorplan.
DETAIL 4 -PARTIAL EMS ONE-LINF DIAGRAM
• Revise One -Line to include controls for Electronics Specialty Lighting.
CONTROL INFORMATION
• Added notes to sheet.
LIGHTING SEQUENCE QF OPERATION
0 Add notes to sheet.
SHEET RE11- - REFRIGERATION ELECTRICAL PLANS
• Added new sheet to Construction Document Set.
irs
SHEET RE2 - REFRIGERATION ELECTRICAL DETAILS
• Added new sheet to Construction Document Set.
SHEET REIVII - REFRIGERATION ENERGY MANAGEMENT PLANS
• Added new sheet to Construction Document Set.
END OF ADDENDUM NO. 1
BY: Trevor Tyson Holcomb Architect
The Contractor shall acknowledge receipt of all -formation cvmpri�fng this ADDENl7UM' by immediatqty
returning this form,. signed and dated� �'Q �'J7e 5Ef]deF Vla facsimile, (274) 748,-0656..
Contractor Company Name
Signature,
11
Date