Loading...
HomeMy WebLinkAboutMISC DOCS - 08-00501 - Wal-Mart - SignSHEET M3 - MECHANICAL SCHEDULES FAN SCHEDULE 0 Add note 2 to General Information section per proto update. BERNER AIR CURTAIN SCHEDULE Revise model cumber of air curtain per proto update. SHEET P1- ENLARGED PLUMBING PLANS PLAN 4 - GARDEN CENTER PLUMBING PLAN • Add note per proto update. SHEET P2 - PLUMBING DETAILS EMERGENCY THERMOSTATIC MIXING VALVE DETAIL Revise note per proto update. WATER HEATER DETAIL • Revise detail to show vacuum relief valve. SHEET P3 - PLUMBING SCHEDULES NON -CUSTOMER PLUMBING FIXTURE SCHEDULE 0 Update model numbers per proto update. FLOOR/ROOF DRAIN SCHEDULE • Add FD2 per revised plumbing design. • Add FS1 per revised plumbing design. CLEANOUT/HOSE BIBB/HYDRANT SCHEDULE • Revise material of FCO per proto update. SHEET MPHI - PHARMACY MECHANICAL PLANS PLAN 1 - PHARMACY MECHANICAL PLAN • Update Floorplan per Architectural update. • Revised HVAC design per relocation of Pharmacy. F'LHfV 1 - F'I1fiFf lVlfiCY PLUMBING PLAN Update Floorplan per Architectural update. • Revise plumbing design per relocation of Pharmacy and proto updates. DETAIL 3 - PHARMACY DVVV RISER • Add floor drain under the sink per proto update. DETAIL 4 - PHARMACY WATER RISER • Replace keynote 15.407 with 15.408. DETAIL 5 - WATER HEATER BELOW COUNTER 0 Add vacuum relief valve to water heater detail. KEYNOTES 0 Replace keynote 15-407 with 15.408. SHEET RPI - REFRIGERATION PLUMBING PLANS PLAN 1 - REFRIGERATION PLUMBING PLANS • Add sheet to set per Architectural update. SHEET R1 - REFRIGERATION PLANS PLAN 1 - REFRIGERATION PLANS • Add sheet to set per Architectural update. SHEET R2 - REFRIGERATION SCHEDULES REFRIGERATION SCHEDULES 0 Add sheet to set per Architectural update WAL-MART STORE NO. 187b PROJECT:, RE,XBURG, ID PROJECT N0. 0802021 ELECTRICAL SHEET E1 - LIGHTING PLAN PLAN 1 - LIGHTING PLAN • Update Floorplan per Architectural update. • Add Electronics Specialty Lighting busway per new Client criteria. Revise plan callouts per new Floorplan. KEYNOTES • Add Keynotes 16.027, 16.127, and 16.148. SPECIALTY LIGHTING NOTES • Add notes to sheet. LIGHTING GENERAL NOTES • Revise notes per new Client criteria. SHEET E1.1 - LIGHTING PLANS PLAN 1 - REAR OFFICE LIGHTING PLAN • Update Floorplan per Architectural update. • Revise lighting layout for new rooms and walls. KEYNOTES • Add Keynote 16.S07. SHEET E2 - POWER PLAN PLAN 1 - REAR OFFICE LIGHTING PLAN • Update Floorplan per Architectural update. • Revise plan callouts per new Floorplan. Add signage note. POWER GENERAL NOTES 0 Revise notes per new Client criteria. KEYNOTES • Add Keynote 16.472. SHEET E2.1 - POWER DROP PLAN PLAN 1 - POWER DROP PLAN � Update Floorplan per Architectural update. • Revise locations of 46A and 18A power drops per new Floorplan. • Revise planC211OUtSper new Floorplan. SHEET E2.4POWER PLANS PLAN 1 - VESTIBULE POWER PLAN • Update Floorplan per Architectural update. • Add power forice merchandiser. SHEET E2.5 - POWER PLANS PLAN 1 - REAR OFFICE POWER PLAN • Update Fborplan per Architectural update. • Add power for new bite -Ta -Story layout and new Bike Assembly. • Revise plan callauts per new Floorplan. PIAN 3 - RECEIVING ELECTRICAL PLAN Add mounting heights to door belt and buzzer. PLAN 4 - TRAINING ROOM POWER PLAN • Update Floorplan per Architectural update. • Revise entire power layout per new Floorplan. KEYNOTES Add Keynote 16.477. • Delete Keynote 16.472. 9 MARCH 13,2009 ADDENDUM NO. 1 WAL-MART STORE NO. 1878 PROJECT: REXBURG, ID PROJECT NO. 0802021 MARCH 13, 2009 ADDENDUM NO. 1 SHEET E3 - ELECTRICAL DETAILS DETAIL 1 -HORN/STROBE AND SECURITY SYSTEM CONDUITS • Revise detail per new Client criteria. SHEET E4 - PARTIAL ELECTRICAL RISER DIAGRAM DETAIL 1 - PARTIAL ELECTRICAL RISER DIAGRAM Revise Riser to include feeder for new Compressor House Assembly. Revise Riser, to include lighting controls. PLAN 3 - ELECTRICAL ROOM #1 PLAN Add powerwall dernolition rote. Q Add Contactor C1. CONNECTED LARDS TABLE f Reprise loads per updated plans. KEYNOTES Add new Keynotes 16.R58. • Change previous Keynote 16.R58 to 16.R59. SHEET E4.1 - ELECTRICAL SCHEDULES PANELBOARD LIF SCHEDULE • Revised schedule for new loads. LIGHTING FIXTURE SCHEDULE • Add Light Fixtures Type 50 and 57 to schedule. Revise Note D per new Client criteria. SAFETY SWITCH SCHEDULE • Add new S2 for Compressor House Assembly. CONTACTOR SCHEDULE • Add schedule to sheet. PANELBOARD NOTES 0 Revise nates pernew Client criteria. SHEET EPHI - PHARMACY ELECTRICAL PLANS PLAN 1 - LIGHTING PLAN • Update Floorplan per Architectural update. Revise entire lighting layout per new Floorplan. PLAN 2 - POWER PLAN • Update Floorplan per Architectural update, Revise entire power layout per new Floorplan. KEYNOTES Add new Keynotes 16.125 and 16.131, SHEET EM1 - ENERGY MANAGEMENT PLAN PLAN 1 - RTU SENSOR LOCATION PLAN • Update Floorplan per Architectural update. Revise S-2 location per new Floorplan. DETAIL 4 -PARTIAL EMS ONE-LINF DIAGRAM • Revise One -Line to include controls for Electronics Specialty Lighting. CONTROL INFORMATION • Added notes to sheet. LIGHTING SEQUENCE QF OPERATION 0 Add notes to sheet. SHEET RE11- - REFRIGERATION ELECTRICAL PLANS • Added new sheet to Construction Document Set. irs SHEET RE2 - REFRIGERATION ELECTRICAL DETAILS • Added new sheet to Construction Document Set. SHEET REIVII - REFRIGERATION ENERGY MANAGEMENT PLANS • Added new sheet to Construction Document Set. END OF ADDENDUM NO. 1 BY: Trevor Tyson Holcomb Architect The Contractor shall acknowledge receipt of all -formation cvmpri�fng this ADDENl7UM' by immediatqty returning this form,. signed and dated� �'Q �'J7e 5Ef]deF Vla facsimile, (274) 748,-0656.. Contractor Company Name Signature, 11 Date