Loading...
HomeMy WebLinkAboutCOMCHECK - 08-00554 - Arctic Circle - Remodel2006 IECC COMcheck Software Version 3.6.0 Envelope Compliance Certificate Section 1: Project Information Project Type= Addition Project Title : Artic Circle Ikemdl Construction Site: 210 N 2nd E Rexburg, I D 83440 Owner/Agent, Dave Bell Artie Circle 210 N 2nd E Rexburg, ID 83440 Section 2: General Information Building Location (for weather data): Climate Zone: Heating Degree Days (base 65 degrees F): Coaling Degree Days (base 50 degrees F): Vertical Glazing 1 Wall Area Pct.: Apt i Dining' Cafeteria/Fast Food Rexlburg,, Idaho b 8693 1446 % Section 3: Requirements Checklist Floor Area 850 - - r ;IMW - D i n r/Contractor: Kathy Goff J RW & Associates 1152 Bond Ave Rexburg, ID 83440 208-359-2309 Origination Date: Completion Date DO NOT DESTROY MAL STATE STORAGE ARCHIVES 44 of Rexburg Records aay_ Climate -Specific Requirements: Component Iame/Description Gross Area Cavity Cont. Pry ad 3u f et or Prim ter 1 -Value I -Vallee -Factor U -Factor Roof I: Attic Roof with Wood Joists 850 00.14- Exterior ' all 1: Wood -Framed , 16" o.c., Window 1: Vinyl Frarn :Double Pane with Lc -Ef Tinted, SHGC 0,60 Floor 1: Slab -On -Grade- unheated, Horizontal without vertical 4 ft, 1494 21.0 0.0 0.062 480 --- -- 0.490 e IM (a) Budget U -factors are used for software baseline f ulation 1L and ONLY, are not code requirements. Air Leakage, Creification and Vapor Retarder Requirements: L 1 All joints and penetrations are caulked, gasketed or covered with a moisture vapor-permeablewrapping installed in accordance with t h Q rnanftq turar'� inst .IEution inatru #ron . Ll . Windows, doors, and skylights certified as meeting leakage requirement . F -i I Component 1 -values & U -factors labeled as certified. Li . Insulation instalI d according to manufacturer's i n tru tion , in substantial contact with the tae being insulated, and in a manner that achieves the rated -value without compressing the insulation. Fi. No root i n ulatton i's installed on a suspended ceiling with removable e it i n anel . Lj . Stair, elevator shaft vents, and other outdoor air intake and exhaustopenings in the building envelope are mia th motorized dampers. Lj 7. Cargo doors and loading dock doors are weather sealed. Li 8. Recessed lighting fixtures are: (i) Type.1C rated and sealed or gasketed, or (H) installed inside ars appropriate ir= t� �ht assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material. Project Title: rti Circle I ern dle Deport data: 11107108 Data filename :�Eitterr of Builders'. -PROD ECT BIDSMOMIDDINGTave Bell' rti i r le" rtiCircle\AC Rex.cck tae 1 of 11 Li . Building entrance doors have stftle equipped with closing devices. Exceptions. - Building tions.Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft. in area. I , apor retarder installed, Section 4; Compliance Statement COMP'liance Statement.- The proposed envelope design represented in this document i . consistent the building �Ir�r specifications and other calculations su bittd with this prat application. Tproposed � � envelope -tern has been designed to rpt the 0IECC requirements in ren � end t � � i�h t rid t r requirements In theRequirementsAlit. Name - Title Sig natu re Date Project Tale: Artic Circle t fiP n : : �itterr t i �F IC � Report date: 11/07/08 I IDC I I k a B e rti i r i' .rt ' i r l e \AC Rexcck Pa 0 2006 IECC COMcheck Software Version 3.6.0 Interior Lighting Compliance Certificate Section 1: Project Information Project Type: Addition Project Title Artic Circle Re dl Construction Site: 210 N 2nd P Rexburg, ID 83440 Owner/Agent: Section 2: General Information Building Use Description b : Activit Ty_pels� Dining- Cafeteria/Fast Food Activity Tie Cava Bell Artic Circle 210 N 2nd F Rexburg, I D 83440 Section 3: Requirements Checklist Interior Lighting: Floor Area j T. Total Proposed wafts must be less than or equal to total allowed waits. Allowed Watts . Proposed Watts Complies 1190 352 YES Controls, Switching, and Wiring: Li- 2. Independent controls for each space (switch/occupancy sensor). Exceptions; Designer/Contract-or- Kathy r/ ntract r: Kathy Goff J FEW & Associates.S. 1152 Bond Ave Rexburg, ICS 83440 208-359-2309 Areas designated u rit r emergency ,rams that must be contifluouslyilluminated. Lighting in stairways or corridors that are elements of the means of egress. ❑ . )`Master switch at entry to hotel/motel guest room. 4. individual dwelling units separately metered. 5. Each space provided with a manual r.,ontrof to provide uniform light reduction by at least Excepficns.- Only one luminaire in space; An occupant -sensing device controls the area; The area i .a carridora storeroom, restroom, public [obby or sleeping unit. Areas that use less that 0-6 WQft A_ft. Lj . Automatic fighting shutoff control in buildings larger than 51000sq-ft. Ep ti,r7 Sleeping units, patient care areas; and spaces where automatic shutoff wouldendanger safety or u nii Lj f Photocell/astronomical time SWitch on exterior lights. E pti , : Lighting intended for 24 hour use. Ll. Tandem wired one -lamp and three -lamp ballasted luminaires (1 single -lamp ballasts). Exceptions., Electronic high -frequency ballasts; Luminaires on emergency ci r uit rr't � h no available fair. Project Title:Arfic CircleRemodl :.u._.�. �.:._ ..�....�.�.. ... ... T �.�_..,.�. at f I c n rn o r i tt rr t E it r- T I Report date; 11/07/08 [ S� � I D I NG�Da e B I l rtj c i r le ti ircl . c Page 3 of 11 MUM Section 4: Compliance .. �atement Compliance Statements The proposed lighting 1 n represented in this document � � . . . � �r��tr�t with the ��rr�r� plans,specifications and other )cul ti ns submitted with this permit application. The proposed lighting system has been designed to meet the 2006 JECC requirements in COMcheckVersion 3.6.0 and to complywith the mandatory requirements in the Requirements Checklist. Name - Title Signature r p t Tide, Artie Circle o�II Report date: 11107/08 Data filename: Q:�Bitterroot Builders -PROD ECT BIDS\2008\ IDD 1 \Dave Bell\Artie r l e\Artic Circla\AC Rex.cck Page 4 of I I 2006 IECC `-MANWk COMcheck Software Version 3.6,0 Interior Lighting Application Worksheet Section 1: Allowed Lighting Power Calculation U1 Area Category B C D Floor Area Allowed Allowed Watts (M) Watts 1 ft2 iB X c} Dining: Cafeteria/Fast Food 850 1.4 1190 Total Allowed Watts = 1190 Section 2: Proposed Lighting Power Calculation A B C D E Fixture ID :Description !Lamp I Wattage Per Lamp I Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Diningd, Cafeteria/Fast Food (850q.ft.) Linear Fluorescent 1, 48,r T8 25W (Supper T8) / Electronic 4 4 88 352 Total Proposed Watts 352 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Proposed Watts is greater than or equal to zero, the building complies. Total Allowed Watts = 1190 Total Proposed Watts = 352 Project Compliance = 838 Project Title.- Artie Circle Remodle - - - - Report date: 11/07/08 Data filename: Q:\Bifterroot E301der-PROJECT BIC S\2008MIDDINGOave BeRArtic Circle\Artic Circle�AC Rex.cck Page 5 of 11 2006 JECC COMcheck Software Version 3.6.0 Lighting ComE.xterior pliance Certificate Section 1: Project Information Project Type., Addition Project Title : Artic Circle Remodl Construction Site: 210 N 2nd E Rexburg, ID 83440 Owner/Agent: Dave Bel[ Artic Circle 210 ISI 2nd F Rexburg, ID 83440 Designer/Contractor- Kathy i n r/Contractor:fth Goff J W & Associates 1152 Bond Ave Rexburg, IIS 83440 208-359-2309 Section 2: Exterior Lighting Area/Surface Power Calculation B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage Watts Waits I Unit (C.x D) Illuminated length of wall or surface 83 ft 5 Na 415 360 Total Tradable Watts* _ 0 Q Total Allowed 'watts = 41 Total Allowed Supplemental Wafts** = 21 Wattage tradeoffs are only allowed between tradable areas/surfaces. ** supplemental allowance equal to % of total allowed wattage may be applied towardorr plies ncof both non -tradable and tradable areas/surfaces, Section 3.- Exterior Lighting Fixture Schedule B C D E Fixture ID : Description # Lamp /Wattage Per Lamp] Ballast Lamps/ # of Fixture 0 Fixture Fixture, Watt. Illuminated d l n th of wall or surface (83 ft): on -tradable Wattage Incandescent : Incandescent O 1 6 60 360 Total Tradable Proposed Wafts Section 4: Requirements Checklist Lighting Wattage: Li 1 VVithin each non -,tradable area/surface, total proposed wafts rust be less than or equal to total allowed watts. Across all trail b areas/surfaces, total proposed watts must be less than or equal to total allowed watts. Compliance: Passes. Controls, Switching, and Wiring; Li . All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt I i h iri L] . All lighfing fixtures are contmIjed by a photosensor or astronomical time switch that'is capable of automatically trurning off the fiat ure when sufficient daylight « available or the lighting is not required. ,exceptions: Covered vehicle entrance/exit areas requiring lighting for safety, security and eye adaptation, Exterior Lighting Efficacy; Project Title: Artie Circle R moll Data filename: :k itt rr t uiI r -P JECT BID \200 \l3IDi INN\C ave BelhArtic Circlerticit l Rex.cck Report date: 11107/08 Page 6 of 11 F -i 4. All exterior building grounds iu Exceptions: ,aires that operate at greater than IOOW have resin i u . . �i racy of 60 lumen/watt. Controlled by motion sensor or exempt from consideration under the provisions of Section 505,62. Section 5-1: Compliance Statement Compliance Statement. The, proposed exterior lighting design represented in this document is consistentwith the building plans, specifications and other calculations submitted with this permit application. There eyed lighting stem has been � designed to met the 0IECC req u i rm ents in COM check Version 3.6.0 and to comply with the mandate re i �" � u rements in the Req u irements C hlit. Name Title Signature Date x. Pro*t Title. Arta Circle I m adle. Report date: 11/07/08 Data Filename: QA13itterroot Builder ,►-PRJ T BIBS\20,08\BlDDl G\bays BellkArtic it l rtlCircle\AC Rex.rck Fie 7 of 11 2006 IECC COMcheck Software Version 3.6.0 Mechanical Compliance Certificate Section 1: Project Information Project Type: Addition Project Title : Artic Circle Remo -die Construction Site: 12nd E Rexburg, ID 83440 Owner/Agent:. Cave Bell Arfic Circle 210 12nd E Rexburg, Ir 83440 Section 2: General Information Building Location (for weather data): Rexburg, Idaho Climate Zone: sb Heating Degree Days abase 65 degrees F}: 8693 Coaling Degree Days (base 50 degrees F): 1446 Section 3n. Mechanical Systems List Designer/Contractor.- Kathy i n r/Contractor:Kathy Goff IOW & Associates 1152 Bond Ave Rexburg, I 83440 208-359-2309 QMA-0-ity System T egj tiprn 1 HVAC System 1: Cooling: Rooftop Package Unit, Capacity >=90 - < 13 5 I Btu/ha Air -Cooled Condenser ng le Zone Section 4.% Requirements Checklist Requirements Specific To: HVAC System 1 n 1. equipment minimum efficiency: Rooftop Package Unit: 10.3 EER 0 2. Coaling system provides a means to relieve excess outdoor air during economizer operation. Fi 3. Integrated air ecanornizer required Generic Requirements; Must be met by all systems to which the requirement is applicably: 0 1. Load calculations per 2001 ASHRAE Fundamentals 0 2. Plant equipment and system capacity no greater than needed to meet loads Exception; Standby equipment automatically off when primary system is operating - Exception: Multiple units controlled to sequence operation as o function of load Lj 3. Minimum one temperature control device per system ❑ 4. Minimum one humidity control device per installed humid ifitin/d ehu mi if cation system F-1 Automatic Controls: : tb k to 55 dearees F (Deet) and 85 degrees P (cool): 7-dny clock, -hour occupant ovorride, I 0 -hour bacK .a p b- Exception: Continuously operating zones Exception: W demand or less, submit calculations LJ 6. Outside -air source for ventilation; system capable of reducing OSA to required minimum 07. R-5 uppl and return air duct insulation in unconditioned spares R-8 uppi and return air duct insulation n utld the building I. - insulation between ducts and the building exterior when ducts arep art of a building assembly bi - Exception- Ducts looted within equipment - Exception: Ducts with interior and exterior temperature difference not exceeding 15 degrees F, - Exception- Continuously welded and locking -type longitudinal joints and seams on ducts operating t static pressures [ess thaninches w.g. pressure classification • ...._ .. .. a. J. a�.ya.-. ,.'��'4'hi_r. .meq®asnr—:r —f... _, - _. aana'�'v�.�fr-a •e - - ._ss a.�irw. �v-- . aa'�v�.sa�u^an r!S. .::.. ....�,�J.. r.1TT _""___ ._.._. 5..1 � • �. � .�_v..— —.... . sys:.•rn rtx;n Project Title: Artie Circle Remodle Report date: 11107/08 Data filename- :�Bitt r root Builder -PROJECT BI D&8\BI DDJ 0a B il' rti rel \Artie Gird Fi , Mechanical fasteners and seg -a used to connect ducts and air distribution qulpmi, . Chu cts seal ed - longitud i nal seams on d gid d u t ; tra nsverse seams on all d u ct # U 1, 181 A or 18 1 B tapes and ma-stic's Fi 10. Operation and maintenance manual provided to building owner Lj 11. Balancing devices provided in accordanre with J M (2006) 603,1 j . Motorized, automatic h uto dampers required on exhaust and outdoor air supply openings - Exception: Gravity dampers acceptable in buildings stories - Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfn1 where dampers ars interlocked with fare Li 13.Stairani elevator shaft vents are equipped with motorized dampers Section 5: Compliance Statement Compliance Statement: The proposed mechanical design r presented 'In this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2006 IECC requirements in COMcheck Version 3.6,0 and to comply with the mandatory requirements in the Requirements Checklist. Jamie - Title Signature Date .. :.,.aava....an.� �...3 �.. ,.. ._.. •�_""_'-"v_ ,��ri,i•a-...erm.��ua'ava_._ .'. . .. ,mr"-.:•. ,.cam.__ —� ._---- - �,�•.. ,...� PrOJOCt Title: ArLic Circle F em dl Data filename: Altterr- t Builders -PROJ ECT BICC \2008\B1DDl \Dave BeMArtic circl \Arfic Circle I e .cc Report date.- 11/07/08 Page 9 of 11 'IN 2006 IECC COMcheck Software Version 3.6.0 Mechanical Requirements Description The following list provides more detailed descriptions of the requirements i section 4 of the Mechanical Compliance Certificate. Requirements Specific To. HVAC System 1 1. The specified heating and/or coling equipment is covered by ASHRAM 90.1 Rooftop Package Unit: 10.3 SER Code and must neat the following minimum efficiency: 2. Cooling system provides a means to relieve excess outdoor air during economizer operation to prevent overpressurizing the building, . An integrated air economizer is required for individual coaling systems over 65 kBtuJh in the selected s climate. n integrated economizer allows � � simultaneous operation f outdoor -air and mechanical cooling. GenericRequirements: Must be ret. by all systems to which the requirement 1 . Design heating and cocling loads for the buildirg rust be determined using procedures in the ASHFZAE Handbook of Fundamentals or ars approved equivalent: calculation procedure. . All equipment and systems must be sized to be no greater than needed to neat calculated loads. A single piece of equipment r- idin both heating and cooling must satisfy this provision for one function with the capacity for the other function as small as possible, within available equipment options.. Exception: The equipment and/or system capacitor may be greater than calculated loads for standby purposes. Standby equipment must be automatically controlled to be off when the primary equipment and/or system is operating. - Exception: Multiple units of the same equipmentcombinedpe hose capacities es exceed the calculated load are allowed if they are provided with controls to sequence operation of the units as the load 'increases or decreases. . Each heating or cooling systern serving a single zona must have its own temperature control device. 4. Each humidification system must have its own humidity control device. . The system or zone control must be a programmable thermostat or other automatic control meeting the following criteria: a capable of setting back temperature to 55 degrees F during heating and setting up to 85 degrees F during cooling, h capable of automatically setting back or shutting down systems during unoccupied hours using 7 different day schedules, c have an accessible -hour occupant prat override, d have a baft ry back-up capable of maintaining programmed settings for at least 10 hours withoutp ower, - Exception: A setback or shutoff control is not required on thermostats that control systems serving areas that operate continuously. - Exception: A setback r shutoff control is not required on systems with total energy demand of 2 kW 826 BtWh) or less. . The system must soppy outside ventilation air as required by Chapter 4 of the Intem tional Mechanical Code. If the ventilation system em is designed to supply outdoor -air quantities exceeding minimum required i red level s�, the system must b capable of reducing n outdoor -air r the m. p file t� inimum required levels. 7. Air ducts must b 'Insulated to the following levels: a supply and return air ducts for conditioned air located 1n unconditioned spas (spaces neither heated nor coaled) must he irrsu l .t d with a minimum of R-5. Unconditioned sac s include. attics crawl unheated basements, and unheated garages. h) Supply and return air ducts and plenums must be insulated to a minimum of R-8 when located outside the building. c) When ducts are iocat d within exterior components (e.g., floors or roofs minimum - insulation is required only between the duct and the building exterior. - Exception: Duct insu lotion is not required on ducts l ted within equipment. - Exception: Duct insulation is not required when the design temperature difference between the Interior and exterior of the dint or plenum does not exceed 15 degrees F. - Exception: nt n u u.sl welded and locking -type longitudinal joints and seams on ducts operating t static pressures less than inches w..9, pressurc au*ifat on.8. Mechanical fasteners and seals, mastics, or gas -bets must be us -ed when connecting d u is to fans and other air d istd buti n � equipment, including multiple -zone terminal units. . All joints, longitudinal and transverse seams, and connections in ductwork must be securely sealed using we idrnnts; mechanical fasteners with seals, gas'kets, or mastics; mesh and mastic sealing systems -,or tapes. Tapes and mastics est b listed �n� labeled i in a c rdan ce with U L 18 1 A and s hall he m an d '181 -P' for pressu re sen siti 'e tape, ' �I 1 -i ' for m astir or'l 1 -heat-sensitive p LI f+�r tape. Tapes and mastics used to seal flexible air ducts and flexible air connectors scomply with UL 1.81 B andshall be mired 181 B -FX for pressure -sensitive tape or 181 B -K for mastic. Unlisted dint to is not a rated as a seal nt n � p' any meta I d utss 10. Operation and maintenance documentation must be provided to the owner that includes at least the following information:. � equipment capacity (input and output) and required maintenance actions b equipment operation and maintenance manuals HVAC system ntrl ainten nc and calibration information, including wiring diagrams, s her atics, and control sequence descriptions; desired Project Title: Artic Circle Remodle Data filename: QABitterroot wild rs' -PRO JE T BIDWOMBIDDINGTave ell\Artic CircWArtic Circle\AC Report date: 11/07108 page 10 of 11 r field -determined set point r be Permanently recorded on control drawings, at cot. Jevices, or, for digital control systems, in programming corn mrets d) complete narrative of how each system is intended to operate. 11. Replaced with 12. Outdoor air supply and exhaust systems must have motorized dampers that automatically shut when the systems or spaces served are not in use. Dampers rust be capable of automatically shutting off during preoccupancy building warm-up, cool -down, and setback, a except when ventilation reduces energy costs (e..g., night purge) or when ventilation must be supplied to meet code requirements. Both outdoor air suppler and exhaust air dampers rust have a m xi m u rri leakage rate of 3 cfm/ft2at 1.0 in w.g. when tested in accordance with AMCA Standard 500. Exception: Gravity (non -motorized) d rip rs are acceptable in buildings less than, three tor" in height. - Exception: Systems with a design outside air intake or exhaust capacity of 300 cfm (140 U r less thatequipped � r with motor operated dampers that open and close when the unit is energized and de -energized, respe ti l . 13. Stair and elevator shaft vents must bye quipped with motorized dampers capable of beim utornati allduringclosed normal building operation and interlocked to open as required by fire and smoke detection systems. All gravity outdoor air supply and exhaust hood, vents, and ventilators must be equipped with motorized d mp r that wN automatically shut when the spaces dr not . in u. - Exception: Gravity (non -motorized) dampers are acceptable in buildings less than three stories in height above grade. - Exception: ' ntilat�on systems serving uncondItioned spices. Project Tits Arti n Circle Rernodle Report date. 11/07/08 Data fil narn : QABitt rro t Bulld r \A--PROJE T E I S \BID INGD v SelMrti it l ,.rti