Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION - 19-00731 - The Grove at Thomson Farms PH2 - Hickory - 30 Unit Bldg 4Inspection Date 02/23/2021 File Name 20001DFR02232021WDM Inspector's Signature Inspector's Name W. Moffat Reviewer's Signature Reviewer's Name S.Thompson Reviewed Date 02/23/2021 5b433c08aac70bf4-1614095523829 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name The Grove Time Start 08:30 AM Client Stillwater Equity Partners Contractor Headwaters Time End 11:30 AM Inspection Type(s) Epoxy Embeds/ Anchors Location(s) Building 4, all hold downs Observations/ Remarks I arrived on site at approximately 8:45 AM. I observed that all of the hold down holes were cleaned. I observed that epoxy was placed all of the way into the hole and that when the bolts were placed into the epoxied holes they were twisted to allow air to escape and provide proper adhesion. I left the site for the lab at approximately 11:00 AM. Items observed are in general conformance with approved project documents and jurisdictional requirements. New Multi Photo Inspection Date 02/23/2021 File Name 20001DFR02232021WDM Inspector's Signature Inspector's Name W. Moffat Reviewer's Signature Reviewer's Name S.Thompson Reviewed Date 02/23/2021 5b433c08aac70bf4-1614095523829 2