Loading...
HomeMy WebLinkAboutPLANS REDLINED - 20-00839 - BYUI Hart Building - MEP-B RemodelAuthor Name Author Email Author Phone No.: Bret Stoddard brets@rexburg.org 208-372-2171 Description : BYUI Hart Building - MEP-B RemodelAddress : 285 S 1st WRecord Type : Commercial - RemodelDocument Filename : Bid Set - 201015 MEP-B.pdf Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Approved # 20-00839 Commercial - Remodel Approval of plans does not constitute approval of variance from code Powered by TCPDF (www.tcpdf.org) 11 12 13 14 15 16 17 18 21 22 23 24 25 26 27 28 29 BA C D E F G 19 20 F1 G1C1D1 PH A S E 3 W O R K 'P 3 M ' PA N E L LO C A T E D I N L E V E L ( 3 ) ME C H R O O M 3 3 3 AR E A O F W O R K - HV A C U P G R A D E (2 / M E P -B -EE -10 1 ) PH A S E 3 W O R K 21 22 23 24 25 26 27 B C DC1 FH R -9,1 1 , 1 3 1 1 / 2 " C . , 4 -#1 / 0 + G N D FH R -8 FH R -2 E. . C S H A L L R E M O V E , C L E A N , R E I N S T A L L , A N D RE C O N N E C T E X I S T I N G R A C Q U E T B A L L CO U R T L I G H T I N G A S N E E D E D F O R ME C H A N I C A L W O R K T O B E D O N E . P3 M -2,4 , 6 4" C . , 4 -50 0 + G N D SE E L E V E L 2 O V E R A L L - ME P b T H I S S H E E T 1 2 3 3 A H U -3 0 0 'F H R ' NE W P A N E L 4 5 WP 8270 S T AT E O F I D AHO T O D D P A Y N EREGISTEREDRPOFESSIONALENGINEER Engineering Inc.Consulting Engineers 1823 E. Center Pocatello, Idaho 83201 tel (208) 232 -4439 www.payneengineeringinc.com 2 " 1 " 0 " 6 5 4 3 2 1 6 5 4 3 2 1 E D C B A DATE REVISION PROJECT NUMBER P.E. JOB #2048JOHN W. HART MEP-b MECHANICAL UPGRADE CONSTRUCTION DOCUMENT - 10-6-2020 10-16-2020 1 0 / 1 3 / 2 0 2 0 1 0 : 5 5 : 0 1 A M MEP-B-EE-101RAQUETBALLROOFELECTRICALPLANSREXBURG, ID 20054A. REFER TO SYMBOL SCHEDULE SHEET FOR PROJECT GENER AL NOTES AND GENERAL NOTES ASSOCIATED WITH THE INSTALLATION OF EACH SYSTEM, INCLUDING BUT NOT LIMI TED TO; LIGHTING, POWER, FIRE ALARM, SPECIAL SYSTEMS, ETC. GENERAL NOTES:KEY NOTES:#1 PROVIDE AND INSTALL A 3/4" CONDUIT FOR CONTROL CAB LE. SEE MECHANICAL DRAWINGS FOR DESTINATION.2 PROVIDE AND INSTALL A 120V. 20A CIRCUIT TO EACH AI R HANDLER FOR INTEGRAL LIGHTING AND SERVICE RECEPTACLE. MAKE ALL REQUIRED CONNECTIONS, CONNECT OT SPARE BREAKERS IN PANEL "FHR".3 E . C . S H A L L D I S C O N N E C T E X I S T I N G H V A C U N I T S I N T H I S AREA FOR REMOVAL. REMOVE ALL ASSOCIATED CONDUIT AND WIRE BAC K TO SOURCE. SEE MECH. DRAWINGS FOR EQUIPMENT AND LOCATI ON.4 P R O V I D E A N D I N S T A L L D U C T D E T E C T O R S I N S U P P L Y A N D R ETURN DUCTS IN THIS UNIT. PROVIDE RELAY MODULE AND WIRE S UCH THAT UNIT WILL SHUT DOWN UPON DETECTION. SEE MECH. DRAWI NGS FOR QUANTITY AND LOCATION OF ALL DUCTS.5 R O U T E F E E D E R F R O M U P P E R M E D I A R O O M , T H R O U G H U P P E R STRUCTURE OF STAGE TO NEW PANEL FHR ON ROOF ABOVE RACQUET BALL COURTS. CORE DRILL ALL WALL PENETRATIO NS AND SEAL AROUND CONDUIT. SC A L E : 1 " = 2 0 ' - 0 " 1 LE V E L 2 - O V E R A L L M E P b SC A L E : 1 / 8 " = 1 ' - 0 " 2 HV A C U P G R A D E M E P b 16 ' 8' 0" 16 ' 8' 0" NO R T H NO R T H S = S H U N T - T R I P B R E A K E R G = G F C I B R E A K E R R = R E D H A N D L E D , LOCK-OUT TYPE A = A R C - F A U L T B R E A K E R GP = G F E P D B R E A K E R L C P = C R K T T O B E R O U T E D T H R O U G H L T G CONTROL PANEL BR K N O T E S : TO T A L E S T I M A T E D D E M A N D A M P S : 295 ATOTAL AMPS:294 A 2 9 3 A 2 9 3 A TOTAL LOAD:35.3 kVA 3 5 . 1 k V A 3 5 . 1 k V A 41 P R E P A R E D S P A C E - - - - - - 0 0 - - - - - - P R E P A R E D S P A C E 4 2 39 P R E P A R E D S P A C E - - - - - - 0 0 - - - - - - P R E P A R E D S P A C E 4 0 37 P R E P A R E D S P A C E - - - - - - 0 0 - - - - - - P R E P A R E D S P A C E 3 8 35 P R E P A R E D S P A C E - - - - - - 0 0 - - - - - - P R E P A R E D S P A C E 3 6 33 P R E P A R E D S P A C E - - - - - - 0 0 - - - - - - P R E P A R E D S P A C E 3 4 31 P R E P A R E D S P A C E - - - - - - 0 0 - - - - - - P R E P A R E D S P A C E 3 2 29 P R E P A R E D S P A C E - - - - - - 0 0 - - - - - - P R E P A R E D S P A C E 3 0 27 P R E P A R E D S P A C E - - - - - - 0 0 - - - - - - P R E P A R E D S P A C E 2 8 25 P R E P A R E D S P A C E - - - - - - 0 0 - - - - - - P R E P A R E D S P A C E 2 6 23 P R E P A R E D S P A C E - - - - - - 0 0 - - - - - - P R E P A R E D S P A C E 2 4 21 P R E P A R E D S P A C E - - - - - - 0 0 - - - - - - P R E P A R E D S P A C E 2 2 19 - - -- - - - - 1 2 0 0 0 1 2 7 3 - - - - - - - - 20 17 - - -- - - - - 1 2 0 0 0 1 2 7 3 - - - - - - - - 18 15 A H U 4 0 0 A ( P H A S E 3 ) 1 5 0 A 3 1 2 0 0 0 1 2 7 3 3 2 0 A D R Y E R E X H A U ST FAN (PHASE 3) 1 6 13 - - -- - - - - 9 5 0 0 1 2 0 0 0 - - - - - - - - 14 11 - - -- - - - - 9 5 0 0 1 2 0 0 0 - - - - - - - - 12 9 A H U 3 0 0 125 A 3 9 5 0 0 1 2 0 0 0 3 1 5 0 A A H U 4 0 0 B ( P H A S E 3 ) 1 0 7 S P A R E - - 2 0 A 1 0 1 8 0 1 2 0 A R e c e p t a c l e 8 5 S P A R E - - 2 0 A 1 0 5 0 0 1 2 0 A A H U 4 0 0 B L I G H T S A N D R E C E P T . . . 6 3 S P A R E - - 2 0 A 1 0 5 0 0 1 2 0 A A H U 4 0 0 A L I G H T S A N D R E C E P T . . . 4 1 S P A R E - - 2 0 A 1 0 5 0 0 1 2 0 A A H U 3 0 0 L I G H T S A N D R E C E P T S . 2 CK T C I R C U I T D E S C R I P T I O N N O T E A M P S P A B C P A M P S N O T E C I R C U I T DESCRIPTION C K T NO T E S : MF G & M O D E L : SQ . D / N Q S E R I E S DIMENSIONS:20"W x 5.8"D x *"H FEED: EN C L O S U R E : NE M A 3 R BUSSING:SEE SPEC'S MBR AMPS:N/A MO U N T I N G : SU R F A C E WIRES:4 PANEL AMPS:400 A J O H N W . H A R T B U I L D I N G M E P - b FE D F R O M : P3 M PHASES:3 PANEL TYPE:MLO J O H N W . H A R T B U I L D I N G P H A S E 3 . . . LO C A T I O N : V O L T A G E : 120/208 Wye A.I.C. RATING:0 PROJECT: PA N E L : F H R PAYNE ENGINEERING