HomeMy WebLinkAboutSTAFF REVIEW - 06-00520 - Harvest Heights Div 3 - Preliminary PlatCITY OF
REXBURG
nv
Arnerimi Pomity Communrry
November 2, 2006
Permit Number: 06 00520
Review Action
P.O Box 280
19 E Main St.
Rexburg, Idaho 83440
Phone (208) 359-3020
Fax(208) 359-3022
Project Name: Harvest Heights, Div.3 - Preliminary Plat
Project Type: Preliminary Subdivision Plat
Review Item Actions Required for Approval Approved
Idn wing Staff Revlewr.
Development Standards Review Any proposed emergency turn arounds?
Development Standards Review
Development Standards Review
Development Standards Review
Development Standards Review
Parcel #'s RPRXBCA0290008
Potential Conditions of Approval:
Commission should make a condition of
approval that the driveway location for lot #15
be limited to the eastern portion of the lot. This
will decrease the liklihood of vehiclular conflicts
at the intersection of Millhollow and 7th South.
What is the street grade of 7th South?
Proposed cross section does not show
required curb, gutter, and sidewalks. See
section 4.2 of the subdivision ordinance.
Fire hydrants and flow rates must be provided.
opR %BLgC
CITY OF
, V 0
REXBURG
Amerirai Pomi7y Cmnmuniiy
Review Action
P.O Box 280
19 E Main St.
Rexburg, Idaho 83440
Phone (208) 359-3020
Fax(208)359-3022
November 2, 2006
Permit Number: 06 00520
Project Name: Harvest Heights, Div.3 - Preliminary Plat
Project Type: Preliminary Subdivision Plat
Review Item Actions Reautred for A
pproval Approved
Public Works Review
Public Work's Review 1. That protion of 7th south to be constructed
adjacent to this development is to be
constructed on the north half or the right-of-way
and to the typical section required by the
engineering department.
2. The subdivision needs to be extended to the
west side of Mill Hollow and the right-of-way for
Mill Hollow dedicated to the city of Rexburg.
3. The sewer lines shown on the Plat go to no
where. A solution to the wastewater collection
needs to be developed.
4. The water line on 7th south needs to be 12
inch.
5. A water valve will be required at the north
end of Twin Canyon Road.
6. The Right-of-way shown for Twin Canyon
Road is set at 68 feet. This road is designated
as a residential collector and requires a 78 Poor
right-of-way.
7. Twin Canyou Road is actually the extension
of Hidden Valley Road and should be called
this.
8. The typical section shows a 4:1 side slope
at the edge of the section. This slope does not
conform to our typical section is is too steep
and will not provide adequate protection for the
curbing. This should be changed to a 4% slope
for the first four feet.
Parcel Xs RPRXBCA0290008
°Fycxeuq� CITY OF P.0 Box 280
19 E Main St.
' REXBURG Rexburg, Idaho 83440
CW—
Am.. iw
Amenw7 Family Caniniunlry Phone (208) 359-3020
Review Action Fax (208) 359-3022
November 2, 2006
Permit Number: 06 00520
Project Name: Harvest Heights, Div.3 - Preliminary Plat
Project Type: Preliminary Subdivision Plat
Review Item Actions Required for Approval Approved
Description Closes and described the desired 11/02/200E
area.
Legal Description closes and describes the
correct area
Utility and access easments are shown
graphically
Can identify ownership withing the subdivision
Subdivision and Street name are not in
conflict with existing names
Subdivision adjoiners are correctly
Subdivision is Addressable
Boundary description matches the plat
Parcel 4's RPRXBCA0290008
Change name of subdivision
Street names are acceptable
The master plan for Harvest Heights shows
Division 3 south of Division 2.
list land owner to the east of subdivision
will homes on lots 4 & 5 be allowed to front 7th
S
The 2nd call in the boundary description is S
88-44-56 W and the plat is N 88-44-56 W
11/02/2006
11/02/2006
11/02/2006