HomeMy WebLinkAboutSPECIAL INSPECTION STEEL WELDING 2 - 20-00273 - Madison High School Field HouseProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MHS Field House
20027
Madison School Districtd
Ultimate Steel Erection 10/12/2020
P/ Cloudy
10:00 AM 12:00 PM
●
I arrived on site and began my observations of the structural steel erection. I observed that the contractor
had placed the majority of the main structural steel members and was working on attaching the perlins. I
spoke with the contractor who informed me that they had the bolts to a snug tight position but had not yet
performed the 1/3 turn of the nut yet and they were waiting to finish squaring the building up. I told them to
let me know when they were ready to perform the 1/3 turns on the bolts.
Digitally signed by Jacob P Christensen
Date: 2021.03.01 10:31:28 -07'00'8129697
●
J. Christensen
Page 2 of 2