Loading...
HomeMy WebLinkAboutGARAGE TRUSS SPECS - 21-00028 - 881 Oak Way - New SFR.pdfJob B0043-21 Truss A1G Truss Type Common Supported Gable Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:18 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-mlNpKCohBBuAbumGtP09xhAMafh8ZWsuAa?tv?zvSg3 Scale = 1:52.4 W1 T1 T1 W1 B1 ST6 ST5 ST4 ST3 ST2ST1 ST5 ST4 ST3 ST2 ST1 B21 2 3 4 5 6 7 8 9 10 11 12 13 14 15 29 28 27 26 25 24 23 22 21 20 19 18 17 16 30 31 4x4 3x4 22-0-0 22-0-0 -1-6-0 1-6-0 11-0-0 11-0-0 22-0-0 11-0-0 23-6-0 1-6-0 0- 1 1 - 6 8- 3 - 6 0- 1 1 - 6 8.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.20 0.04 0.23 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.02 -0.03 0.00 (loc) 15 15 16 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 133 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 22-0-0. (lb) - Max Horz29=-149(LC 10) Max Uplift All uplift 100 lb or less at joint(s) 29, 16, 23, 24, 26, 27, 28, 21, 20, 19, 18, 17 Max Grav All reactions 250 lb or less at joint(s) 22, 23, 24, 26, 27, 28, 21, 20, 19, 18, 17 except 29=308(LC 23), 16=308(LC 24) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-29=-271/77, 14-16=-271/77 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=2ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Corner(3E) -1-7-0 to 1-5-0, Exterior(2N) 1-5-0 to 11-0-0, Corner(3R) 11-0-0 to 14-0-0, Exterior(2N) 14-0-0 to 23-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 2-0-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 29, 16, 23, 24, 26, 27 , 28, 21, 20, 19, 18, 17. 11) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss A2 Truss Type Common Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:19 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-ExxBXYpJyV11D2LSQ6XOTviVK3yUIzp1PEkRSRzvSg2 Scale = 1:47.1 T1 T2 B1 W2 W1 W2 W1 HW1 HW1 B21 2 3 4 5 6 7 8 10 9 11 12 13 14 4x6 4x8 4x4 4x4 4x8 4x4 4x4 5x6 3x4 2x4 2x4 7-5-3 7-5-3 14-6-13 7-1-11 22-0-0 7-5-3 -1-6-0 1-6-0 5-7-12 5-7-12 11-0-0 5-4-4 16-4-4 5-4-4 22-0-0 5-7-12 0- 1 1 - 6 8- 3 - 6 0- 1 1 - 6 8.00 12 Plate Offsets (X,Y)-- [2:0-5-14,0-0-4], [5:0-3-0,0-1-12], [8:0-5-14,0-0-4], [10:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.33 0.35 0.24 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.11 -0.15 0.03 0.01 (loc) 9-10 9-10 8 9 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 118 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Left 2x6 DF 1800F 1.6E - 3-5-14, Right 2x6 DF 1800F 1.6E -t 3-5-14 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-5-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 8=1117/0-3-8 (min. 0-1-8), 2=1263/0-3-8 (min. 0-1-8) Max Horz2=129(LC 11) Max Uplift8=-62(LC 12), 2=-106(LC 12) Max Grav8=1135(LC 18), 2=1263(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1484/102, 3-4=-1369/120, 4-11=-1307/150, 5-11=-1214/164, 5-12=-1224/170, 6-12=-1319/156, 6-7=-1375/125, 7-8=-1490/108 BOT CHORD 2-10=-39/1171, 10-13=0/844, 13-14=0/844, 9-14=0/844, 8-9=-35/1105 WEBS 5-9=-50/563, 6-9=-360/114, 5-10=-47/545, 4-10=-343/112 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 11-0-0, Exterior(2R) 11-0-0 to 14-0-0, Interior(1) 14-0-0 to 22-0-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8 except (jt=lb) 2=106. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss A3 Truss Type Common Qty 2 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:20 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-j8UZlupxjo9uqBwe_q2d06Fg4SIj1Q3BduU__uzvSg1 Scale = 1:47.1 T1 T2 B1 W2 W1 W2 W1 HW1 HW1 B21 2 3 4 5 6 7 8 10 9 11 12 13 14 4x6 4x8 4x4 4x4 4x8 4x4 4x4 5x6 3x4 2x4 2x4 7-5-3 7-5-3 14-6-13 7-1-11 22-0-0 7-5-3 -1-6-0 1-6-0 5-7-12 5-7-12 11-0-0 5-4-4 16-4-4 5-4-4 22-0-0 5-7-12 0- 1 1 - 6 8- 3 - 6 0- 1 1 - 6 8.00 12 Plate Offsets (X,Y)-- [2:0-5-14,0-0-4], [5:0-3-0,0-1-12], [8:0-5-14,0-0-4], [10:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.33 0.35 0.24 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.11 -0.15 0.03 0.01 (loc) 9-10 9-10 8 9 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 118 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Left 2x6 DF 1800F 1.6E -t 3-5-14, Right 2x6 DF 1800F 1.6E -t 3-5-14 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-5-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 8=1117/Mechanical, 2=1263/0-3-8 (min. 0-1-8) Max Horz2=129(LC 11) Max Uplift8=-62(LC 12), 2=-106(LC 12) Max Grav8=1135(LC 18), 2=1263(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1484/102, 3-4=-1369/120, 4-11=-1307/150, 5-11=-1214/164, 5-12=-1224/170, 6-12=-1319/156, 6-7=-1375/125, 7-8=-1490/108 BOT CHORD 2-10=-39/1171, 10-13=0/844, 13-14=0/844, 9-14=0/844, 8-9=-35/1105 WEBS 5-9=-50/563, 6-9=-360/114, 5-10=-47/545, 4-10=-343/112 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 11-0-0, Exterior(2R) 11-0-0 to 14-0-0, Interior(1) 14-0-0 to 22-0-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8 except (jt=lb) 2=106. 7) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss B1G Truss Type Common Structural Gable Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:22 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-fWcK9arBEQPc4V416F555XKxAG_QVAjU5Cz52mzvSg? Scale = 1:66.0 T2 T3 B1 W3 W4 W5 W6 W7 W8 W1 W2 W10 W9 ST10ST8 ST9 ST6 ST7 ST4 ST5 ST2 ST3 ST1 ST11 T1 T4 B2 1 2 3 4 5 6 7 8 13 12 11 10 9 32 33 34 35 3x4 6x8 M18SHS 3x4 3x4 4x4 3x4 5x8 3x4 4x4 3x4 4x4 3x4 5x6 8-1-12 8-1-12 14-11-4 6-9-8 22-3-14 7-4-10 30-0-0 7-8-2 4-2-10 4-2-10 8-1-12 3-11-2 14-11-4 6-9-8 22-3-14 7-4-10 30-0-0 7-8-2 1- 0 - 6 10 - 1 1 - 1 4 0- 1 1 - 6 8.00 12 Plate Offsets (X,Y)-- [4:0-1-12,0-1-8], [6:0-1-12,0-1-8], [8:Edge,0-1-0], [9:Edge,0-1-8], [11:0-4-0,0-3-0], [13:0-1-8,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.68 0.33 0.87 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.07 -0.12 0.02 0.01 (loc) 10-11 10-11 9 10 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 222 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W10: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 5-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 6-11 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 12=1583/0-3-8 (min. 0-1-13), 13=358/0-2-0 (min. 0-1-8), 9=1089/Mechanical Max Horz13=-179(LC 10) Max Uplift12=-101(LC 12), 13=-12(LC 12), 9=-59(LC 12) Max Grav12=1673(LC 17), 13=402(LC 23), 9=1121(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-427/22, 2-3=-341/31, 4-32=-754/124, 5-32=-536/142, 5-33=-582/136, 6-33=-779/117, 6-7=-1134/104, 7-8=-1392/86, 1-13=-344/41, 8-9=-1026/93 BOT CHORD 11-35=-26/1016, 10-35=-26/1016, 9-10=-94/651 WEBS 3-12=-268/73, 4-12=-1287/133, 4-11=0/726, 6-11=-724/115, 6-10=0/296, 8-10=0/431 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=30ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 14-11-4, Exterior(2R) 14-11-4 to 17-11-4, Interior(1) 17-11-4 to 29-10-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are MT20 plates unless otherwise indicated. 5) All plates are 2x4 MT20 unless otherwise indicated. 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 9) Refer to girder(s) for truss to truss connections. 10) Provide mechanical connection (by others) of truss to bearing plate at joint(s) 13. 11) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 9 except (jt=lb) 12=101. 12) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss C1 Truss Type Roof Special Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:25 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-35ISoct4XLnAxzocnNeojAyReTzxiVewnABle5zvSfy Scale = 1:81.4 T2 T3 T4 T5 B1 W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W11 W12 W11 W13 W14 W15HW1 HW2B1B2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 27 26 25 24 23 22 21 20 19 18 17 28 29 30 31 32 33 3x6 5x6 5x6 5x6 4x12 4x4 4x8 3x4 2x4 4x4 4x4 5x6 3x4 4x8 4x4 5x8 2x4 6x8 3x8 3x4 4x8 3x4 2x4 5x7 3x8 4x8 4-2-10 4-2-10 8-1-12 3-11-2 11-6-8 3-4-12 14-11-4 3-4-12 22-0-0 7-0-12 26-3-7 4-3-7 30-8-9 4-5-3 35-0-0 4-3-7 38-10-4 3-10-4 43-0-0 4-1-12 4-2-10 4-2-10 8-1-12 3-11-2 11-6-8 3-4-12 14-11-4 3-4-12 18-5-10 3-6-6 22-0-0 3-6-6 26-3-7 4-3-7 30-8-9 4-5-3 35-0-0 4-3-7 38-10-4 3-10-4 43-0-0 4-1-12 44-6-0 1-6-0 1- 0 - 6 6- 1 - 9 10 - 1 1 - 1 4 0- 1 1 - 6 6- 1 - 9 8.00 12 Plate Offsets (X,Y)-- [1:0-8-2,Edge], [3:0-1-12,0-1-8], [5:0-1-12,0-1-12], [6:0-1-12,0-1-8], [8:0-0-8,0-2-0], [9:0-3-0,0-2-3], [12:0-3-0,0-2-3], [13:0-1-12,0-1-8], [19:0-3-8,0-4-8], [22:0-4-0,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.73 0.47 0.99 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.22 -0.32 0.05 0.08 (loc) 19-21 19-21 15 19-21 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 649 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std *Except* W9: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Left 2x6 DF 1800F 1.6E -t 2-6-13, Right 2x4 DF Stud/Std -t 2-5-12 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-6-1 oc purlins, except 2-0-0 oc purlins (5-7-0 max.): 9-12. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size) 1=-1165/Mechanical, 26=5379/0-3-8 (min. 0-2-14), 15=4198/0-3-8 (min. 0-2-4) Max Horz1=-184(LC 25) Max Uplift1=-1449(LC 20), 26=-495(LC 8), 15=-469(LC 8) Max Grav1=153(LC 8), 26=5379(LC 1), 15=4198(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-237/2232, 2-3=-227/2260, 3-4=-236/2460, 4-5=-232/2546, 5-6=-227/445, 6-7=-971/169, 7-8=-987/170, 8-9=-4912/530, 9-28=-4090/414, 10-28=-4093/414, 10-11=-6391/706, 11-29=-4997/616, 12-29=-4992/616, 12-13=-6047/714, 13-14=-5800/639, 14-15=-5900/628 BOT CHORD 1-27=-1767/241, 26-27=-1767/241, 25-26=-2076/316, 24-25=-366/188, 23-24=-57/2017, 23-30=-57/2017, 30-31=-57/2017, 22-31=-57/2017, 21-22=-438/5570, 20-21=-438/5570, 20-32=-438/5570, 19-32=-438/5570, 19-33=-559/6391, 18-33=-559/6391, 17-18=-438/4593, 15-17=-438/4593 WEBS 3-26=-642/101, 5-26=-4762/453, 5-25=-307/3730, 6-25=-3319/297, 6-24=-186/2611, 7-24=-129/727, 8-24=-3223/377, 8-22=-538/5253, 9-22=-2945/337, 10-22=-2480/282, 10-21=0/392, 10-19=-342/1442, 11-19=-57/1463, 11-18=-2289/149, 12-18=-322/2846, 13-18=-141/640, 13-17=-382/81 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-4-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=43ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 8) Refer to girder(s) for truss to truss connections. Continued on page 2 Job B0043-21 Truss C1 Truss Type Roof Special Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:25 2021 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-35ISoct4XLnAxzocnNeojAyReTzxiVewnABle5zvSfy NOTES- 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=1449, 26=495, 15=469. 10) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 11) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 12) This truss has large uplift reaction(s) from gravity load case(s). Proper connection is required to secure truss against upward movement at the bearings. Building designer must provide for uplift reactions indicated. 13) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 2025 lb down and 175 lb up at 30-1-8, 371 lb down and 71 lb up at 30-11-4, and 371 lb down and 71 lb up at 32-11-4, and 1122 lb down and 246 lb up at 34-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-7=-86, 7-9=-86, 9-12=-86, 12-16=-86, 1-15=-16 Concentrated Loads (lb) Vert: 19=-371(F) 18=-1122(F) 32=-2025(F) 33=-371(F) Job B0043-21 Truss C2 Truss Type Roof Special Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:26 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-XHsq?yuiIev1Y6NoL591GNVfDtHeR0o30qxJAXzvSfx Scale = 1:81.4 T2 T3 T4 T5 B1 W1 W2 W3 W4 W5 W6 W7 W8 W7 W9 W10HW1 HW2B3B2 1 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 23 24 25 26 27 28 29 30 3x6 5x6 6x8 3x8 5x6 3x6 3x4 2x4 4x4 4x8 6x8 3x4 2x4 3x8 3x8 2x4 5x8 4x4 4x4 3x6 8-1-12 8-1-12 14-11-4 6-9-8 20-0-0 5-0-12 26-6-0 6-6-0 33-0-0 6-6-0 43-0-0 10-0-0 4-2-10 4-2-10 8-1-12 3-11-2 14-11-4 6-9-8 20-0-0 5-0-12 26-6-0 6-6-0 33-0-0 6-6-0 37-10-4 4-10-4 43-0-0 5-1-12 44-6-0 1-6-0 1- 0 - 6 7- 5 - 9 10 - 1 1 - 1 4 0- 1 1 - 6 7- 5 - 9 8.00 12 Plate Offsets (X,Y)-- [1:0-6-2,0-0-1], [5:0-1-12,0-2-0], [7:0-2-8,0-2-4], [9:0-5-5,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.55 0.64 0.74 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.17 -0.27 0.07 0.04 (loc) 16-17 12-14 12 16 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 256 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Left 2x8 DF SS -t 2-8-1, Right 2x6 DF 1800F 1.6E -t 3-2-3 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-6-15 oc purlins, except 2-0-0 oc purlins (4-10-0 max.): 7-9. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 5-20, 7-19, 8-17, 8-14 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=-46/Mechanical, 20=2759/0-3-8 (min. 0-3-2), 12=1809/0-3-8 (min. 0-1-15) Max Horz1=-184(LC 10) Max Uplift1=-351(LC 24), 20=-156(LC 12), 12=-136(LC 12) Max Grav1=287(LC 23), 20=2909(LC 17), 12=1852(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-212/664, 2-3=-118/673, 3-4=-18/731, 4-5=-1/817, 5-21=-954/145, 6-21=-830/165, 6-22=-725/172, 7-22=-905/150, 7-23=-1666/193, 8-23=-1668/193, 8-24=-1730/195, 24-25=-1728/195, 9-25=-1726/195, 9-26=-2065/193, 10-26=-2117/173, 10-11=-2272/194, 11-12=-2381/172 BOT CHORD 1-20=-482/104, 20-27=-668/133, 19-27=-668/133, 18-19=-15/1702, 18-28=-15/1702, 17-28=-15/1702, 17-29=-39/2049, 16-29=-39/2049, 15-16=-39/2049, 15-30=-39/2049, 14-30=-39/2049, 12-14=-82/1787 WEBS 3-20=-369/74, 5-20=-2386/202, 5-19=-48/1712, 6-19=-66/521, 7-19=-1788/177, 7-17=0/646, 8-17=-587/35, 8-16=0/330, 8-14=-532/42, 9-14=-2/691 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=43ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-0-0 to 4-1-4, Interior(1) 4-1-4 to 14-11-4, Exterior(2R) 14-11-4 to 19-2-14, Interior(1) 19-2-14 to 33-0-0, Exterior(2R) 33-0-0 to 37-3-10, Interior(1) 37-3-10 to 44-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=351, 20=156, 12=136. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss C3 Truss Type Roof Special Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:27 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-?UQDDHvK3y1uAGy_uohGob1qnHfNATLDEUgsj_zvSfw Scale = 1:81.4 T2 T3 T4 T5 B1 W1 W2 W3 W4 W5 W6 W7 W6 W8 W9 W10HW1 HW2 T6 B1B2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 21 20 19 18 17 16 15 22 23 24 25 26 27 28 29 30 3x6 5x6 5x6 5x10 MT20HS 3x6 3x8 5x6 3x6 3x4 2x4 4x4 3x8 3x4 3x4 3x8 3x4 2x4 5x8 4x4 4x4 3x6 8-1-12 8-1-12 18-0-0 9-10-4 24-6-0 6-6-0 31-0-0 6-6-0 36-10-4 5-10-4 43-0-0 6-1-12 4-2-10 4-2-10 8-1-12 3-11-2 14-11-4 6-9-8 18-0-0 3-0-12 24-6-0 6-6-0 31-0-0 6-6-0 36-10-4 5-10-4 43-0-0 6-1-12 44-6-0 1-6-0 1- 0 - 6 8- 9 - 9 10 - 1 1 - 1 4 0- 1 1 - 6 8- 9 - 9 8.00 12 Plate Offsets (X,Y)-- [1:0-6-2,0-0-1], [5:0-1-12,0-2-0], [7:0-2-4,0-2-4], [9:0-6-12,0-2-0], [11:0-1-12,0-1-8], [19:0-3-6,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.56 0.48 0.72 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.18 -0.29 0.05 0.04 (loc) 19-21 19-21 13 18 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 MT20HS Weight: 265 lb FT = 0% GRIP 220/195 165/146 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Left 2x8 DF SS -t 2-8-1, Right 2x6 DF 1800F 1.6E -t 3-9-5 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-6-4 oc purlins, except 2-0-0 oc purlins (4-7-7 max.): 7-9. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 5-21, 7-19, 8-18, 8-16 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=64/0-4-0 (min. 0-1-8), 21=2624/0-3-8 (min. 0-3-0), 13=1834/0-3-8 (min. 0-1-15) Max Horz1=-184(LC 10) Max Uplift1=-255(LC 24), 21=-133(LC 12), 13=-140(LC 12) Max Grav1=324(LC 23), 21=2804(LC 17), 13=1867(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-273/524, 2-3=-178/536, 3-4=-4/584, 4-5=0/655, 5-22=-1283/162, 6-22=-1152/182, 6-7=-1526/244, 7-23=-1740/221, 8-23=-1743/221, 8-24=-1623/210, 24-25=-1623/210, 9-25=-1620/210, 9-26=-1932/212, 10-26=-1968/193, 10-11=-2028/189, 11-12=-2333/181, 12-13=-2457/159 BOT CHORD 1-21=-380/148, 21-27=-524/100, 20-27=-524/100, 19-20=-524/100, 19-28=0/1326, 28-29=0/1326, 18-29=0/1326, 17-18=-13/1746, 17-30=-13/1746, 16-30=-13/1746, 15-16=-67/1841, 13-15=-67/1841 WEBS 3-21=-337/71, 5-21=-2251/192, 5-19=-33/1659, 6-19=-138/1171, 7-19=-1724/220, 7-18=-54/762, 8-18=-507/96, 8-16=-265/44, 9-16=-9/597, 11-16=-351/90 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=43ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-0-0 to 4-1-4, Interior(1) 4-1-4 to 14-11-4, Exterior(2E) 14-11-4 to 18-0-0, Interior(1) 18-0-0 to 31-0-0, Exterior(2R) 31-0-0 to 35-3-10, Interior(1) 35-3-10 to 44-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=255, 21=133, 13=140. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss C4 Truss Type Roof Special Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:29 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-ysXzdzwabZHcQa6N0Djkt07BF5LOeMLWin9znszvSfu Scale = 1:86.3 T2 T3 T4 T5 B1 W1 W2 W3 W4 W5 W6 W7 W6 W8 W9 W10HW1 HW2 T6 B3B2 1 2 3 4 5 6 7 8 9 10 11 12 13 20 19 18 17 16 15 14 21 22 23 24 25 26 27 28 29 30 3x6 5x8 M18SHS 5x6 5x8 M18SHS 5x6 4x8 5x6 3x6 3x4 2x4 4x4 4x8 3x4 3x4 3x8 2x4 5x8 4x4 4x4 3x6 8-1-12 8-1-12 16-0-0 7-10-4 22-6-0 6-6-0 29-0-0 6-6-0 35-10-4 6-10-4 43-0-0 7-1-12 4-2-10 4-2-10 8-1-12 3-11-2 14-11-4 6-9-8 16-0-0 1-0-12 22-6-0 6-6-0 29-0-0 6-6-0 35-10-4 6-10-4 43-0-0 7-1-12 44-6-0 1-6-0 1- 0 - 6 10 - 1 - 9 10 - 1 1 - 1 4 0- 1 1 - 6 10 - 1 - 9 8.00 12 Plate Offsets (X,Y)-- [1:0-6-2,0-0-1], [5:0-1-12,0-2-0], [7:0-2-8,0-2-4], [9:0-5-4,0-2-4], [10:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.50 0.50 0.82 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.15 -0.22 0.05 0.04 (loc) 15-17 15-17 12 15 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 275 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Left 2x8 DF SS -t 2-8-1, Right 2x6 DF 1800F 1.6E -t 4-4-8 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-8-6 oc purlins, except 2-0-0 oc purlins (5-0-6 max.): 7-9. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 5-20, 7-18, 8-17, 8-15, 10-15 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=141/0-4-0 (min. 0-1-8), 20=2529/0-3-8 (min. 0-2-14), 12=1852/0-3-8 (min. 0-2-0) Max Horz1=-184(LC 10) Max Uplift1=-197(LC 24), 20=-123(LC 12), 12=-142(LC 12) Max Grav1=370(LC 23), 20=2713(LC 17), 12=1918(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-338/433, 2-3=-242/443, 3-4=-69/492, 4-5=0/538, 5-21=-1161/161, 6-21=-1024/181, 6-7=-1033/194, 7-22=-1501/222, 8-22=-1503/222, 8-23=-1538/220, 23-24=-1537/220, 9-24=-1535/221, 9-25=-1828/221, 10-25=-1947/193, 10-11=-2379/187, 11-12=-2497/166 BOT CHORD 1-20=-304/201, 20-26=-434/87, 19-26=-434/87, 18-19=-434/87, 18-27=0/1021, 27-28=0/1021, 17-28=0/1021, 17-29=0/1515, 16-29=0/1515, 15-16=0/1515, 14-15=-61/1890, 14-30=-60/1893, 12-30=-60/1893 WEBS 3-20=-338/68, 5-20=-2201/171, 5-18=-17/1574, 6-18=-99/914, 7-18=-1647/167, 7-17=-59/986, 8-17=-696/106, 9-15=-6/512, 10-15=-538/108, 10-14=0/275 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=43ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-0-0 to 4-1-4, Interior(1) 4-1-4 to 14-11-4, Exterior(2E) 14-11-4 to 16-0-0, Interior(1) 16-0-0 to 29-0-0, Exterior(2R) 29-0-0 to 33-3-10, Interior(1) 33-3-10 to 44-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=197, 20=123, 12=142. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss C5 Truss Type Hip Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:31 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-uFfj2fyr7AXKfuGm7elCzRCUwu?36Lfo95e3slzvSfs Scale = 1:86.4 T2 T3 T4 B1 W1 W2 W3 W4 W5 W4 W3 W6 W7HW1 HW2 T1 T5 B1B2 1 2 3 4 5 6 7 8 9 10 11 18 17 16 15 14 13 12 19 20 21 22 23 24 25 26 27 28 29 30 31 32 5x7 5x8 M18SHS 6x8 M18SHS 3x6 4x8 5x6 5x6 3x6 2x4 3x8 2x4 3x8 3x8 3x4 2x4 5x8 4x4 4x4 3x6 8-1-12 8-1-12 15-10-8 7-8-12 21-5-4 5-6-12 27-0-0 5-6-12 34-10-4 7-10-4 43-0-0 8-1-12 8-1-0 8-1-0 15-10-8 7-9-8 21-5-4 5-6-12 27-0-0 5-6-12 34-10-4 7-10-4 43-0-0 8-1-12 44-6-0 1-6-0 1- 0 - 6 11 - 5 - 9 11 - 7 - 6 0- 1 1 - 6 11 - 5 - 9 8.00 12 Plate Offsets (X,Y)-- [1:0-6-2,0-0-1], [3:0-3-8,0-3-4], [4:0-5-4,0-2-4], [6:0-5-5,Edge], [8:0-1-12,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.68 0.56 0.51 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.15 -0.23 0.08 0.03 (loc) 12-14 12-14 10 1-18 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 272 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W4: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Left 2x8 DF SS -t 4-11-13, Right 2x6 DF 1800F 1.6E -t 4-11-11 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-8-9 oc purlins, except 2-0-0 oc purlins (4-9-9 max.): 4-6. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: 6-0-0 oc bracing: 1-18. WEBS 1 Row at midpt 3-18, 5-16, 5-14, 8-14 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=655/0-4-0 (min. 0-1-8), 18=1891/0-3-8 (min. 0-2-4), 10=1976/0-3-8 (min. 0-2-2) Max Horz1=-194(LC 10) Max Uplift1=-129(LC 12), 10=-167(LC 12) Max Grav1=692(LC 23), 18=2139(LC 17), 10=2068(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-732/190, 2-19=-561/196, 3-19=-542/215, 3-20=-1535/213, 4-20=-1358/245, 4-21=-1145/244, 21-22=-1148/244, 5-22=-1149/244, 5-23=-1582/242, 23-24=-1581/242, 6-24=-1578/243, 6-25=-1877/242, 7-25=-1954/212, 7-8=-2022/210, 8-9=-2533/206, 9-26=-2635/183, 10-26=-2719/179 BOT CHORD 1-27=-97/466, 18-27=-97/466, 18-28=-93/482, 17-28=-93/482, 16-17=-93/482, 16-29=0/1542, 15-29=0/1542, 15-30=0/1542, 14-30=0/1542, 13-14=-64/2071, 13-31=-64/2071, 12-31=-64/2071, 12-32=-64/2071, 10-32=-64/2071 WEBS 3-18=-1774/106, 3-16=0/1114, 4-16=-22/342, 5-16=-921/24, 5-15=0/292, 5-14=-222/255, 6-14=-18/529, 8-14=-717/113, 8-12=0/390 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=43ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-0-0 to 4-3-10, Interior(1) 4-3-10 to 15-10-8, Exterior(2R) 15-10-8 to 21-11-8, Interior(1) 21-11-8 to 27-0-0, Exterior(2R) 27-0-0 to 33-1-0, Interior(1) 33-1-0 to 44-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=129, 10=167. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss C6 Truss Type Hip Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:32 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-MRD6G?zTuUfBH1ryhLGRVelfOIL?ri7yOlOdOBzvSfr Scale = 1:82.6 T1 T2 T3 B1 W3 W4 W5 W4 W6 W7 W8 W1 W2 HW2 T4 B3B2 1 2 3 4 5 6 7 8 9 15 14 13 12 11 10 16 17 1819 20 21 22 23 24 25 26 27 3x4 4x8 M18SHS 5x8 M18SHS 3x4 3x8 3x4 3x4 3x4 3x4 5x6 3x8 M18SHS 5x8 4x4 4x4 3x4 9-8-0 9-8-0 16-9-8 7-1-8 25-7-12 8-10-4 34-9-8 9-1-12 4-11-12 4-11-12 9-8-0 4-8-4 16-9-8 7-1-8 22-8-5 5-10-13 28-7-3 5-10-13 34-9-8 6-2-5 36-3-8 1-6-0 6- 6 - 0 12 - 9 - 9 12 - 1 1 - 6 0- 1 1 - 6 12 - 9 - 9 8.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-12], [3:0-4-0,0-1-9], [4:0-4-12,0-2-0], [6:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.63 0.57 0.88 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.29 -0.42 0.07 0.04 (loc) 14-15 14-15 8 10-12 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 234 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W4,W5,W1: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Right 2x6 DF 1800F 1.6E -t 3-9-13 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-2-6 oc purlins, except end verticals, and 2-0-0 oc purlins (5-10-15 max.): 3-4. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-14, 4-14, 5-12, 2-15 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 15=1764/0-5-8 (min. 0-2-0), 8=1906/0-3-8 (min. 0-2-1) Max Horz15=-280(LC 10) Max Uplift15=-102(LC 12), 8=-139(LC 12) Max Grav15=1874(LC 18), 8=1981(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1360/196, 3-17=-1085/191, 17-18=-1085/191, 18-19=-1085/191, 19-20=-1085/191, 4-20=-1085/191, 4-21=-1521/211, 5-21=-1721/186, 5-6=-2377/196, 6-7=-2493/167, 7-22=-2490/151, 8-22=-2624/139, 1-15=-276/96 BOT CHORD 15-23=0/934, 23-24=0/934, 14-24=0/934, 14-25=0/1378, 13-25=0/1378, 12-13=0/1378, 11-12=0/1710, 11-26=0/1710, 26-27=0/1710, 10-27=0/1710, 8-10=-47/1976 WEBS 2-14=-8/652, 3-14=-72/300, 4-14=-614/64, 4-12=-44/925, 5-12=-725/131, 5-10=-16/542, 6-10=-285/110, 2-15=-1688/132 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=35ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-1-12 to 3-7-8, Interior(1) 3-7-8 to 9-8-0, Exterior(2R) 9-8-0 to 14-7-1, Interior(1) 14-7-1 to 16-9-8, Exterior(2R) 16-9-8 to 21-8-9, Interior(1) 21-8-9 to 36-4-8 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 15=102, 8=139. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss C7 Truss Type PIGGYBACK BASE Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:34 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-IqLshh_jQ5vvWL_KpmJva3qvh61qJhjFr3tkS4zvSfp Scale = 1:70.7 T1 T2 T3 B1 W3 W4 W3 W4 W3 W5 W6 W1 W2 HW2 T4 B3B2 1 2 3 4 5 6 7 8 15 14 13 12 11 10 9 16 17 18 19 20 21 22 23 24 25 26 27 4x4 4x8 M18SHS 4x8 M18SHS 5x6 3x4 3x4 3x4 3x8 2x4 3x4 2x4 5x8 4x4 4x4 3x4 7-5-15 7-5-15 13-2-12 5-8-13 18-11-9 5-8-13 26-8-12 7-9-4 34-9-8 8-0-12 7-5-15 7-5-15 13-2-12 5-8-13 18-11-9 5-8-13 26-8-12 7-9-4 34-9-8 8-0-12 36-3-8 1-6-0 6- 6 - 0 11 - 6 - 0 0- 1 1 - 6 11 - 6 - 0 8.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-12], [2:0-5-12,0-2-0], [4:0-5-12,0-2-0], [5:0-3-0,0-3-4] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-SH 0.96 0.55 0.55 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.16 -0.25 0.06 0.03 (loc) 9-11 9-11 7 11 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 233 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W4,W1: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Right 2x6 DF 1800F 1.6E -t 4-11-2 BRACING- TOP CHORD Structural wood sheathing directly applied, except end verticals, and 2-0-0 oc purlins (5-6-4 max.): 2-4. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-14, 3-13, 4-13, 5-11, 1-15 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 15=1764/0-5-8 (min. 0-2-0), 7=1906/0-3-8 (min. 0-2-1) Max Horz15=-257(LC 10) Max Uplift15=-102(LC 12), 7=-139(LC 12) Max Grav15=1864(LC 19), 7=2011(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-16=-1357/136, 16-17=-1224/141, 2-17=-1219/159, 2-18=-1379/194, 18-19=-1379/194, 3-19=-1378/194, 3-20=-1378/194, 4-20=-1379/194, 4-21=-1763/193, 5-21=-1918/160, 5-6=-2413/160, 6-22=-2587/137, 7-22=-2635/129, 1-15=-1724/132 BOT CHORD 14-24=0/1091, 13-24=0/1091, 13-25=0/1495, 12-25=0/1495, 11-12=0/1495, 10-11=-29/2004, 10-26=-29/2004, 9-26=-29/2004, 9-27=-28/2008, 7-27=-28/2008 WEBS 2-14=-649/106, 2-13=-63/893, 3-13=-531/84, 4-11=-15/724, 5-11=-755/124, 5-9=0/391, 1-14=-59/1296 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=35ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-1-12 to 3-7-8, Interior(1) 3-7-8 to 7-5-15, Exterior(2R) 7-5-15 to 12-5-0, Interior(1) 12-5-0 to 18-11-9, Exterior(2R) 18-11-9 to 23-10-9, Interior(1) 23-10-9 to 36-4-8 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 15=102, 7=139. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss C8 Truss Type PIGGYBACK BASE Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:36 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-FDSc5M0zxjAdlf8jwBLNgUvFAviInaDXJNMqXyzvSfn Scale = 1:70.7 T1 T2 T3 B1 W3 W4 W3 W4 W3 W5 W6 W1 W2 HW2 T4 B3B2 1 2 3 4 5 6 7 8 15 14 13 12 11 10 9 16 17 18 19 20 21 22 23 24 25 26 27 4x4 4x8 M18SHS 4x8 M18SHS 5x6 3x4 3x4 3x4 3x8 2x4 3x4 2x4 5x8 4x4 4x4 3x4 7-5-15 7-5-15 13-2-12 5-8-13 18-11-9 5-8-13 26-8-12 7-9-4 34-9-8 8-0-12 7-5-15 7-5-15 13-2-12 5-8-13 18-11-9 5-8-13 26-8-12 7-9-4 34-9-8 8-0-12 36-3-8 1-6-0 6- 6 - 0 11 - 6 - 0 0- 1 1 - 6 11 - 6 - 0 8.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-12], [2:0-5-12,0-2-0], [4:0-5-12,0-2-0], [5:0-3-0,0-3-4] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-SH 0.96 0.55 0.55 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.16 -0.25 0.06 0.03 (loc) 9-11 9-11 7 11 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 233 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W4,W1: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Right 2x6 DF 1800F 1.6E -t 4-11-2 BRACING- TOP CHORD Structural wood sheathing directly applied, except end verticals, and 2-0-0 oc purlins (5-6-4 max.): 2-4. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-14, 3-13, 4-13, 5-11, 1-15 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 15=1764/0-5-8 (min. 0-2-0), 7=1906/0-3-8 (min. 0-2-1) Max Horz15=-257(LC 10) Max Uplift15=-102(LC 12), 7=-139(LC 12) Max Grav15=1864(LC 19), 7=2011(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-16=-1357/136, 16-17=-1224/141, 2-17=-1219/159, 2-18=-1379/194, 18-19=-1379/194, 3-19=-1378/194, 3-20=-1378/194, 4-20=-1379/194, 4-21=-1763/193, 5-21=-1918/160, 5-6=-2413/160, 6-22=-2587/137, 7-22=-2635/129, 1-15=-1724/132 BOT CHORD 14-24=0/1091, 13-24=0/1091, 13-25=0/1495, 12-25=0/1495, 11-12=0/1495, 10-11=-29/2004, 10-26=-29/2004, 9-26=-29/2004, 9-27=-28/2008, 7-27=-28/2008 WEBS 2-14=-649/106, 2-13=-63/893, 3-13=-531/84, 4-11=-15/724, 5-11=-755/124, 5-9=0/391, 1-14=-59/1296 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=35ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-1-12 to 3-7-8, Interior(1) 3-7-8 to 7-5-15, Exterior(2R) 7-5-15 to 12-5-0, Interior(1) 12-5-0 to 18-11-9, Exterior(2R) 18-11-9 to 23-10-9, Interior(1) 23-10-9 to 36-4-8 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 15=102, 7=139. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss C9 Truss Type Piggyback Base Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:38 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-BbaNW21ETKQK?yI62cNrlv?ewjRUFQfqmhrxcrzvSfl Scale = 1:75.2 T1 T2 T3 B1 W3 W4 W5 W6 W5 W7 W5 W6 W5 W8 W9 W10 W11 W1 W2 HW2 T4 B3B2 1 2 3 4 5 6 7 8 9 1011 21 20 19 18 17 16 15 14 13 12 22 23 24 25 26 27 28 29 30 31 32 4x8 4x4 5x6 3x8 M18SHS 4x6 3x4 7x8 3x4 3x8 2x4 3x8 2x4 7x8 3x4 3x4 2x4 4x4 4x8 3x4 3x4 4x6 3-10-12 3-10-12 7-5-15 3-7-4 11-3-4 3-9-4 15-2-4 3-11-0 18-11-9 3-9-4 24-1-11 5-2-2 29-3-14 5-2-2 34-9-8 5-5-10 3-10-12 3-10-12 7-5-15 3-7-4 11-3-4 3-9-4 15-2-4 3-11-0 18-11-9 3-9-4 24-1-11 5-2-2 29-3-14 5-2-2 34-9-8 5-5-10 36-3-8 1-6-0 6- 6 - 0 11 - 6 - 0 0- 1 1 - 6 11 - 6 - 0 8.00 12 Plate Offsets (X,Y)-- [1:0-1-12,0-1-12], [2:0-1-12,0-1-8], [3:0-5-12,0-2-0], [5:0-2-0,0-1-8], [7:0-1-12,0-1-8], [8:0-3-0,0-3-0], [15:0-4-0,0-4-12], [20:0-3-8,0-4-8], [21:0-4-4,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.82 0.38 0.81 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.13 -0.16 0.04 0.06 (loc) 13-15 13-15 10 15-17 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 631 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std SLIDER Right 2x4 DF Stud/Std -t 3-3-5 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-11-1 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-6. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing, Except: 10-0-0 oc bracing: 20-21. WEBS 1 Row at midpt 1-21 REACTIONS.(lb/size) 21=5229/0-5-8 (min. 0-2-13), 10=3123/0-3-8 (min. 0-1-11) Max Horz21=-256(LC 6) Max Uplift21=-1943(LC 8), 10=-1040(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-2440/1072, 2-3=-2471/1566, 3-4=-2243/1673, 4-22=-2242/1673, 5-22=-2242/1673, 5-6=-3074/1500, 6-7=-3805/1756, 7-8=-4211/1683, 8-9=-4295/1569, 9-10=-4435/1553, 1-21=-4617/1925 BOT CHORD 20-24=-762/1949, 19-24=-762/1949, 19-25=-1108/1991, 18-25=-1108/1991, 18-26=-1450/2673, 26-27=-1450/2673, 27-28=-1450/2673, 17-28=-1450/2673, 16-17=-1450/2673, 16-29=-1450/2673, 29-30=-1450/2673, 15-30=-1450/2673, 15-31=-1248/3447, 14-31=-1248/3447, 14-32=-1248/3447, 13-32=-1248/3447, 12-13=-1180/3445, 10-12=-1178/3443 WEBS 2-20=-734/1476, 2-19=-1480/449, 3-19=-31/383, 3-18=-1343/1024, 4-18=-359/65, 5-18=-1353/108, 5-17=-1443/0, 5-15=0/1895, 6-15=-886/1641, 7-15=-796/75, 7-13=0/535, 8-13=-501/228, 1-20=-1516/3673 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-7-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=35ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) All plates are MT20 plates unless otherwise indicated. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 21=1943 , 10=1040. 10) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. Continued on page 2 Job B0043-21 Truss C9 Truss Type Piggyback Base Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:39 2021 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-fo8lkO2sEeYBc6tIbJu4H7Xpg6nj_tv_?LaV8HzvSfk NOTES- 11) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 12) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1280 lb down and 93 lb up at 1-10-4, 1280 lb down and 93 lb up at 3-10-4 , 1280 lb down and 93 lb up at 5-10-4, 999 lb up at 7-10-4, 985 lb up at 9-10-4, 985 lb up at 11-10-4, 985 lb up at 13-10-4, 985 lb up at 15-10-4, and 1285 lb down and 95 lb up at 17-10-4, and 1285 lb down and 95 lb up at 19-10-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-3=-86, 3-6=-86, 6-11=-86, 10-21=-16 Concentrated Loads (lb) Vert: 16=345(B) 20=-1280(B) 19=348(B) 23=-1280(B) 24=-1280(B) 25=345(B) 26=345(B) 28=345(B) 30=-1285(B) 31=-1285(B) Job B0043-21 Truss CJ-01 Truss Type Diagonal Hip Girder Qty 3 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:40 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-7_i7xk3U?xg2EGSU91PJqK43rWAIjQe7E?K2gkzvSfj Scale = 1:37.0 W1 T1 W7 B1W2 W3 W4 W5 W6 1 2 3 4 5 9 8 7 6 10 11 12 13 14 15 2x4 3x4 2x4 3x4 3x6 3x4 3x4 3x4 3-9-15 3-9-15 7-4-5 3-6-7 11-2-4 3-9-15 -2-1-7 2-1-7 3-9-15 3-9-15 7-4-5 3-6-7 11-2-4 3-9-15 0- 1 1 - 6 6- 2 - 1 0 5.66 12 Plate Offsets (X,Y)-- [2:0-1-8,0-1-8], [6:0-1-12,0-1-8], [8:0-2-12,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.47 0.16 0.40 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.01 -0.02 0.01 0.01 (loc) 7-8 7-8 6 7-8 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 69 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 9=871/0-7-6 (min. 0-1-8), 6=774/Mechanical Max Horz9=171(LC 5) Max Uplift9=-137(LC 8), 6=-152(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-9=-833/151, 2-10=-805/92, 3-10=-708/102, 3-11=-615/130, 4-11=-482/102 BOT CHORD 8-14=-166/656, 7-14=-166/656, 7-15=-136/505, 6-15=-136/505 WEBS 2-8=-110/719, 4-7=0/324, 4-6=-727/152 NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 9=137, 6=152. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 45 lb down and 29 lb up at 2-9-8, 45 lb down and 29 lb up at 2-9-8, 71 lb down and 69 lb up at 5-7-7, 71 lb down and 69 lb up at 5-7-7, and 114 lb down and 104 lb up at 8-5-6, and 114 lb down and 104 lb up at 8-5-6 on top chord, and 4 lb down at 2-9-8, 4 lb down at 2-9-8, 19 lb down at 5-7-7, 19 lb down at 5-7-7, and 55 lb down at 8-5-6, and 55 lb down at 8-5-6 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-86, 2-5=-86, 6-9=-16 Concentrated Loads (lb) Vert: 11=-38(F=-19, B=-19) 12=-229(F=-114, B=-114) 14=-17(F=-9, B=-9) 15=-49(F=-25, B=-25) Job B0043-21 Truss CJ-02 Truss Type Diagonal Hip Girder Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:41 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-bAGV9446mFovsQ1hjkxYNYdDcwTJStqHSf3bCAzvSfi Scale = 1:37.0 W1 T1 W9 B1 B2 B3 W2 W3 W5 W4 W6 W7 W8 1 2 3 4 5 6 12 11 10 9 8 7 13 14 15 16 17 18 2x4 3x4 2x4 3x4 2x4 3x4 3x8 3x4 4x8 3x4 3x4 1-10-4 1-10-4 3-5-0 1-6-12 7-1-14 3-8-14 11-2-4 4-0-6 -2-1-7 2-1-7 1-10-4 1-10-4 3-5-0 1-6-12 7-1-14 3-8-14 11-2-4 4-0-6 0- 1 1 - 6 6- 2 - 1 0 5- 2 - 1 0 1- 0 - 0 5.66 12 Plate Offsets (X,Y)-- [2:0-1-0,0-1-8], [4:0-1-12,0-1-8], [7:0-1-12,0-1-8], [9:0-5-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.54 0.37 0.40 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.04 -0.06 0.03 0.02 (loc) 8-9 8-9 7 8-9 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 67 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except* B2: 2x4 DF Stud/Std WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 5-7-1 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: 6-0-0 oc bracing: 11-12. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 12=894/0-7-6 (min. 0-1-8), 7=798/Mechanical Max Horz12=160(LC 5) Max Uplift12=-137(LC 8), 7=-151(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-12=-860/147, 2-3=-623/58, 3-13=-1425/192, 4-13=-1396/191, 4-14=-881/144, 5-14=-749/138 BOT CHORD 9-17=-305/1364, 8-17=-304/1361, 8-18=-174/745, 7-18=-174/745 WEBS 2-11=-79/678, 3-11=-611/125, 9-11=-164/518, 3-9=-149/808, 4-8=-646/136, 5-8=-47/410, 5-7=-906/179 NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 12=137, 7=151. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 45 lb down and 29 lb up at 2-9-8, 45 lb down and 29 lb up at 2-9-8, 61 lb down and 44 lb up at 5-7-7, 61 lb down and 44 lb up at 5-7-7, and 89 lb down and 76 lb up at 8-5-6 , and 89 lb down and 76 lb up at 8-5-6 on top chord, and 4 lb down at 2-9-8, 4 lb down at 2-9-8, 47 lb down and 25 lb up at 5-7-7, 47 lb down and 25 lb up at 5-7-7, and 76 lb down and 27 lb up at 8-5-6, and 76 lb down and 27 lb up at 8-5-6 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Continued on page 2 Job B0043-21 Truss CJ-02 Truss Type Diagonal Hip Girder Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:41 2021 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-bAGV9446mFovsQ1hjkxYNYdDcwTJStqHSf3bCAzvSfi LOAD CASE(S) Standard Uniform Loads (plf) Vert: 1-2=-86, 2-6=-86, 10-12=-16, 7-9=-16 Concentrated Loads (lb) Vert: 14=-7(F=-4, B=-4) 15=-127(F=-63, B=-63) 17=-95(F=-47, B=-47) 18=-151(F=-76, B=-76) Job B0043-21 Truss D1G Truss Type Hip Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:45 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-UxV0_R7dqUILK1KSya?UXOnrtXhkOZysNH1pLxzvSfe Scale = 1:70.2 T1 T2 T1 B1 B3 B4 B5 B6 W1 W2 W3 W4 W5 W6 W5 W8 W7 W9 W10 W9 W11 W12 W13 W14 W16 W17HW1 HW2 T3 B2 W15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 29 28 27 26 25 24 23 22 21 20 19 18 17 30 31 32 33 34 35 36 37 38 39 40 41 5x6 3x6 6x8 4x8 4x8 3x8 M18SHS 4x6 4x6 3x8 M18SHS 5x6 3x4 2x4 6x8 4x8 2x4 3x8 4x8 10x10 2x4 4x8 6x8 4x4 3x4 4x4 5x6 9x10 M18SHS 5x10 MT20HS 4-1-12 4-1-12 8-0-0 3-10-4 12-5-0 4-5-0 16-10-0 4-5-0 21-3-0 4-5-0 24-7-8 3-4-8 28-0-0 3-4-8 30-9-4 2-9-4 33-6-8 2-9-4 34-7-8 1-1-0 36-0-0 1-4-8 -1-6-0 1-6-0 4-1-12 4-1-12 8-0-0 3-10-4 12-5-0 4-5-0 16-10-0 4-5-0 21-3-0 4-5-0 24-7-8 3-4-8 28-0-0 3-4-8 30-9-4 2-9-4 33-6-8 2-9-4 34-7-8 1-1-0 36-0-0 1-4-8 37-6-0 1-6-0 0- 1 1 - 6 6- 1 - 9 6- 3 - 6 0- 1 1 - 6 1- 0 - 0 6- 1 - 9 8.00 12 Plate Offsets (X,Y)-- [2:0-5-10,0-0-12], [4:0-1-12,0-1-8], [5:0-3-0,0-2-0], [7:0-1-12,0-1-8], [11:0-5-4,Edge], [12:0-1-12,0-1-8], [14:0-3-4,0-1-8], [15:Edge,0-7-7], [18:0-4-0,0-0-12], [19:0-7-4,0-6-0], [23:0-6-8,0-7-0], [24:0-4-0,0-0-4], [25:0-3-8,0-2-0], [27:0-3-8,0-3-12] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.77 0.91 0.90 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.35 -0.50 0.26 0.15 (loc) 22-23 22-23 15 23 l/defl >999 >866 n/a >999 L/d 360 240 n/a 240 PLATES MT20 MT20HS M18SHS Weight: 521 lb FT = 0% GRIP 220/195 165/146 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E *Except* B3,B5: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W8,W15: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Left 2x6 DF 1800F 1.6E -t 2-5-12, Right 2x6 DF 1800F 1.6E -t 1-6-10 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-2-6 oc purlins, except 2-0-0 oc purlins (4-2-15 max.): 5-11. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 2=4756/0-5-8 (min. 0-2-9), 15=4752/0-5-8 (min. 0-2-9) Max Horz2=104(LC 26) Max Uplift2=-659(LC 8), 15=-660(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-6724/911, 3-4=-6629/924, 4-5=-6983/1026, 5-30=-7568/1113, 6-30=-7572/1113, 6-7=-7569/1112, 7-8=-10161/1449, 8-31=-8777/1268, 9-31=-8777/1268, 9-10=-8777/1268, 10-32=-8781/1268, 11-32=-8779/1269, 11-12=-8384/1213, 12-13=-9068/1253, 13-14=-13133/1719, 14-15=-5901/784 BOT CHORD 2-29=-665/5262, 28-29=-665/5262, 27-28=-665/5262, 27-33=-735/5825, 33-34=-735/5825, 26-34=-735/5825, 26-35=-1068/8336, 35-36=-1068/8336, 25-36=-1068/8336, 25-37=-132/1026, 37-38=-132/1026, 24-38=-132/1026, 23-24=-55/476, 8-23=-197/1638, 23-39=-1311/10230, 39-40=-1307/10203, 22-40=-1303/10173, 22-41=-877/6944, 21-41=-877/6944, 20-21=-956/7545, 19-20=-1375/10870, 18-19=-112/899, 13-19=-385/3334, 17-18=-180/1407, 15-17=-472/3835 WEBS 4-29=-503/107, 4-27=-176/963, 5-27=-190/1097, 5-26=-381/2975, 6-26=-443/68, 7-26=-1329/169, 7-25=-1340/181, 23-25=-976/7624, 7-23=-339/2656, 8-22=-2432/312, 10-22=-429/66, 11-22=-424/3265, 11-21=-281/1761, 12-21=-836/108, 12-20=-70/809, 13-20=-3541/444, 17-19=-492/4092, 14-17=-4279/542, 14-19=-926/7270 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc, 2x4 - 1 row at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=36ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) All plates are MT20 plates unless otherwise indicated. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. Continued on page 2 Job B0043-21 Truss D1G Truss Type Hip Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:45 2021 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-UxV0_R7dqUILK1KSya?UXOnrtXhkOZysNH1pLxzvSfe NOTES- 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 2=659, 15=660. 10) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 11) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 12) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1122 lb down and 246 lb up at 8-0-0, 371 lb down and 71 lb up at 10-0-12 , 371 lb down and 71 lb up at 12-0-12, 371 lb down and 71 lb up at 14-0-12, 371 lb down and 71 lb up at 16-0-12, 371 lb down and 71 lb up at 17-11-4, 371 lb down and 71 lb up at 19-11-4, 360 lb down and 72 lb up at 21-11-4, 360 lb down and 72 lb up at 23-11-4, and 360 lb down and 72 lb up at 25-11-4, and 1135 lb down and 246 lb up at 27-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-5=-86, 5-11=-86, 11-16=-86, 2-24=-16, 19-23=-16, 15-18=-16 Concentrated Loads (lb) Vert: 27=-1122(B) 21=-1135(B) 33=-371(B) 34=-371(B) 35=-371(B) 36=-371(B) 37=-371(B) 38=-371(B) 39=-360(B) 40=-360(B) 41=-360(B) Job B0043-21 Truss D2 Truss Type Hip Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:46 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-y83OCn8FbnQCyBveWHWj3bK1bx4l70K0cxnMuNzvSfd Scale = 1:66.1 T1 T2 T1 B1 B3 B4 B5 B6 W1 W2 W3 W4 W6 W5 W7 W8 W9 W11 W10 W12 HW1 HW2B21 2 3 4 5 6 7 8 9 10 11 12 21 20 19 18 17 16 15 14 13 22 23 24 25 26 27 28 29 5x6 5x8 M18SHS 4x12 5x6 5x6 3x6 3x4 4x6 4x6 3x4 3x12 3x8 2x4 3x8 4x12 6x8 3x12 4x4 5x8 7x8 10-0-0 10-0-0 15-7-8 5-7-8 21-3-0 5-7-8 26-0-0 4-9-0 33-6-8 7-6-8 34-7-8 1-1-0 36-0-0 1-4-8 -1-6-0 1-6-0 5-1-12 5-1-12 10-0-0 4-10-4 15-7-8 5-7-8 21-3-0 5-7-8 26-0-0 4-9-0 33-6-8 7-6-8 34-7-8 1-1-0 36-0-0 1-4-8 37-6-0 1-6-0 0- 1 1 - 6 7- 5 - 9 7- 7 - 6 0- 1 1 - 6 1- 0 - 0 7- 5 - 9 8.00 12 Plate Offsets (X,Y)-- [2:0-7-2,Edge], [5:0-3-0,0-2-3], [8:0-4-12,0-2-0], [9:0-1-4,0-2-0], [10:0-1-4,0-3-4], [15:0-6-0,0-1-8], [17:0-6-0,0-4-4], [19:0-3-8,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.71 0.74 0.96 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.23 -0.36 0.23 0.07 (loc) 15-16 15-16 11 16-17 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 223 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except* B3: 2x4 DF Stud/Std WEBS 2x4 DF Stud/Std *Except* W10: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Left 2x8 DF SS -t 3-2-3, Right 2x8 DF SS -t 1-7-12 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-10-0 oc purlins, except 2-0-0 oc purlins (3-9-15 max.): 5-8. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-21, 7-16, 9-16 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=1972/0-5-8 (min. 0-2-2), 11=1972/0-5-8 (min. 0-2-2) Max Horz2=126(LC 11) Max Uplift2=-144(LC 12), 11=-144(LC 12) Max Grav2=1974(LC 17), 11=1972(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-22=-2618/159, 3-22=-2476/168, 3-4=-2476/181, 4-5=-2317/181, 5-23=-1889/179, 23-24=-1891/179, 24-25=-1893/179, 6-25=-1893/179, 6-7=-2663/211, 7-26=-2196/189, 26-27=-2193/190, 8-27=-2192/190, 8-28=-2634/179, 9-28=-2810/147, 9-10=-4025/160, 10-11=-2282/108 BOT CHORD 2-21=-62/2037, 20-21=-31/2340, 20-29=-31/2340, 19-29=-31/2340, 7-17=0/330, 16-17=-32/2695, 15-16=-164/3831, 9-15=0/553, 13-14=-46/327, 11-13=-16/1393 WEBS 5-21=-15/834, 6-21=-828/49, 6-19=-387/50, 17-19=-44/2210, 6-17=-6/610, 7-16=-957/48, 8-16=0/998, 9-16=-1683/153, 13-15=0/1682, 10-15=-116/2305, 10-13=-1375/0 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=36ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 2-0-4, Interior(1) 2-0-4 to 10-0-0, Exterior(2R) 10-0-0 to 15-1-2, Interior(1) 15-1-2 to 26-0-0, Exterior(2R) 26-0-0 to 31-1-2, Interior(1) 31-1-2 to 37-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 2=144, 11=144. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss E1 Truss Type Hip Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:48 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-uWB9dT9V7PgwBV31diZB90PNOlo1b0OJ3FGTyGzvSfb Scale = 1:78.1 T1 T2 T3 T4 B1W1 W2 W3 W4 W5 W6 W7 W8 W7 W6 W9 W10 HW2 T5 B3B212 3 4 5 6 7 8 9 10 11 12 13 21 20 19 18 17 16 15 14 22 23 24 25 26 27 28 29 30 5x6 5x6 5x10 MT20HS 3x6 3x6 4x6 4x8 2x4 4x12 3x4 3x8 2x4 3x8 3x8 3x4 2x4 5x8 5x6 5x6 4x6 6-0-0 6-0-0 6-2-12 0-2-12 11-3-10 5-0-14 20-0-0 8-8-6 26-0-0 6-0-0 32-0-0 6-0-0 37-10-4 5-10-4 44-0-0 6-1-12 -1-6-0 1-6-0 6-2-5 6-2-5 11-3-10 5-1-5 15-7-13 4-4-3 20-0-0 4-4-3 26-0-0 6-0-0 32-0-0 6-0-0 37-10-4 5-10-4 44-0-0 6-1-12 45-6-0 1-6-0 0- 3 - 1 4 3- 1 - 1 2 8- 9 - 9 8- 1 1 - 6 0- 1 1 - 6 8- 9 - 9 3.00 12 8.00 12 Plate Offsets (X,Y)-- [3:0-3-8,0-2-0], [6:0-3-0,0-2-3], [8:0-6-12,0-2-0], [10:0-1-12,0-1-8], [12:0-6-2,0-0-1], [20:0-5-8,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.69 0.62 0.54 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.30 -0.46 0.09 0.06 (loc) 18-20 18-20 12 18-20 l/defl >999 >980 n/a >999 L/d 360 240 n/a 240 PLATES MT20 MT20HS Weight: 248 lb FT = 0% GRIP 220/195 165/146 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W2: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Right 2x8 DF SS -t 3-9-5 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-10-9 oc purlins, except 2-0-0 oc purlins (4-7-12 max.): 6-8. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: 5-3-4 oc bracing: 2-21 5-2-10 oc bracing: 20-21. WEBS 1 Row at midpt 7-18, 7-15 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 21=2765/0-5-8 (min. 0-2-15), 12=1991/0-5-8 (min. 0-2-2) Max Horz21=146(LC 11) Max Uplift21=-298(LC 12), 12=-132(LC 12) Max Grav21=2765(LC 1), 12=2041(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-22=-607/1571, 3-22=-595/1644, 3-4=-2515/177, 4-23=-3036/274, 5-23=-2942/285, 5-6=-2381/357, 6-24=-1924/337, 24-25=-1926/337, 7-25=-1928/336, 7-8=-1863/340, 8-9=-2222/357, 9-10=-2317/333, 10-26=-2489/332, 11-26=-2611/330, 11-12=-2742/308 BOT CHORD 2-21=-1523/621, 20-21=-1523/640, 20-27=-151/2245, 19-27=-151/2245, 19-28=-151/2245, 18-28=-151/2245, 18-29=-108/2167, 17-29=-108/2167, 16-17=-108/2167, 16-30=-108/2167, 15-30=-108/2167, 14-15=-174/2062, 12-14=-174/2062 WEBS 3-21=-2618/474, 3-20=-626/3834, 4-20=-1327/188, 5-20=-4/494, 5-18=-424/126, 6-18=-83/898, 7-18=-530/86, 7-17=0/296, 7-15=-605/52, 8-15=-54/780, 10-15=-323/133 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=44ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-6-7 to 2-10-6, Interior(1) 2-10-6 to 20-0-0, Exterior(2R) 20-0-0 to 26-0-0, Interior(1) 26-0-0 to 32-0-0, Exterior(2R) 32-0-0 to 38-2-11, Interior(1) 38-2-11 to 45-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 21=298, 12=132. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss E2 Truss Type HIP Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:49 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-MjlXqpA7uiompfeDBQ4QhEyW7882KTmSIv?0UizvSfa Scale = 1:78.0 T1 T2 T3 T4 B1 W1 W2 W3 W4 W5 W6 W7 W8 W7 W9 W10 HW2 T5 B3B212 3 4 5 6 7 8 9 10 11 19 18 17 16 15 14 13 12 20 21 22 23 24 25 26 27 28 5x6 5x6 5x6 5x6 3x6 4x6 4x8 2x4 3x8 3x4 3x4 3x4 3x8 2x4 5x8 5x6 5x6 3x6 6-0-0 6-0-0 6-2-12 0-2-12 11-3-10 5-0-14 16-7-13 5-4-3 22-0-0 5-4-3 30-0-0 8-0-0 36-10-4 6-10-4 44-0-0 7-1-12 -1-6-0 1-6-0 6-2-5 6-2-5 11-3-10 5-1-5 16-7-13 5-4-3 22-0-0 5-4-3 30-0-0 8-0-0 36-10-4 6-10-4 44-0-0 7-1-12 45-6-0 1-6-0 0- 3 - 1 4 3- 1 - 1 2 10 - 1 - 9 10 - 3 - 6 0- 1 1 - 6 10 - 1 - 9 3.00 12 8.00 12 Plate Offsets (X,Y)-- [3:0-3-8,0-2-0], [5:0-1-12,0-1-8], [6:0-3-0,0-2-0], [7:0-3-4,0-2-4], [8:0-3-0,0-3-0], [10:0-6-2,0-0-1], [18:0-2-4,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-SH 0.82 0.57 0.53 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.27 -0.40 0.08 0.04 (loc) 13-15 13-15 10 16-18 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 244 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except* T3: 2x4 DF 2400F 2.0E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W2,W8: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Right 2x8 DF SS -t 4-4-8 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except 2-0-0 oc purlins (3-10-14 max.): 6-7. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: 5-3-3 oc bracing: 2-19 5-2-11 oc bracing: 18-19. WEBS 1 Row at midpt 5-15, 6-13, 8-13 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 19=2765/0-5-8 (min. 0-2-15), 10=1991/0-5-8 (min. 0-2-2) Max Horz19=168(LC 11) Max Uplift19=-298(LC 12), 10=-132(LC 12) Max Grav19=2765(LC 1), 10=2045(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-20=-608/1565, 3-20=-597/1637, 3-4=-2418/181, 4-21=-2604/314, 5-21=-2421/329, 5-6=-2185/366, 6-22=-1715/347, 22-23=-1715/347, 23-24=-1715/347, 7-24=-1715/347, 7-25=-2147/360, 8-25=-2168/328, 8-9=-2582/339, 9-26=-2579/317, 10-26=-2707/316 BOT CHORD 2-19=-1517/623, 18-19=-1517/640, 17-18=-118/2456, 16-17=-118/2456, 15-16=-143/2194, 15-27=-54/1802, 14-27=-54/1802, 13-14=-54/1802, 12-13=-169/2055, 12-28=-168/2058, 10-28=-168/2058 WEBS 3-19=-2605/481, 3-18=-634/3769, 4-18=-1102/256, 4-16=-297/18, 5-16=0/282, 5-15=-604/140, 6-15=-48/756, 6-13=-259/222, 7-13=-28/605, 8-13=-520/165, 8-12=0/252 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=44ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-6-7 to 2-10-6, Interior(1) 2-10-6 to 22-0-0, Exterior(2R) 22-0-0 to 28-2-11, Interior(1) 28-2-11 to 30-0-0, Exterior(2R) 30-0-0 to 36-2-11, Interior(1) 36-2-11 to 45-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 19=298, 10=132. 7) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss E3 Truss Type Hip Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:50 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-qvIv29Ble0wdRoDPl7bfERUjYYUD3wubXZla18zvSfZ Scale = 1:85.3 T1 T2 T3 T4 B1W1 W2 W3 W4 W5 W6 W7 W8 W7 W9 W10 HW2 T5 B2B212 3 4 5 6 7 8 9 10 11 12 20 19 18 17 16 15 14 13 21 22 23 24 25 26 27 5x6 5x6 5x8 M18SHS 3x6 3x6 3x6 4x8 2x4 3x8 3x4 3x4 3x4 3x8 3x4 2x4 5x8 5x6 5x6 3x6 6-0-0 6-0-0 6-2-12 0-2-12 11-3-10 5-0-14 17-7-13 6-4-3 24-0-0 6-4-3 28-0-0 4-0-0 35-10-4 7-10-4 44-0-0 8-1-12 -1-6-0 1-6-0 6-2-5 6-2-5 11-3-10 5-1-5 17-7-13 6-4-3 24-0-0 6-4-3 28-0-0 4-0-0 35-10-4 7-10-4 44-0-0 8-1-12 45-6-0 1-6-0 0- 3 - 1 4 3- 1 - 1 2 11 - 5 - 9 11 - 7 - 6 0- 1 1 - 6 11 - 5 - 9 3.00 12 8.00 12 Plate Offsets (X,Y)-- [3:0-3-8,0-2-0], [5:0-1-12,0-1-8], [6:0-3-0,0-2-0], [7:0-4-12,0-2-0], [9:0-1-12,0-1-8], [11:0-6-2,0-0-1], [19:0-2-0,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.65 0.57 0.54 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.19 -0.30 0.09 0.05 (loc) 16-17 13-15 11 17-19 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 255 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W2: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Right 2x8 DF SS -t 4-11-11 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-6-12 oc purlins, except 2-0-0 oc purlins (4-8-9 max.): 6-7. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: 5-2-13 oc bracing: 2-20 5-2-5 oc bracing: 19-20. WEBS 1 Row at midpt 5-16, 6-15, 9-15 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 20=2765/0-5-8 (min. 0-2-15), 11=1991/0-5-8 (min. 0-2-3) Max Horz20=191(LC 11) Max Uplift20=-298(LC 12), 11=-132(LC 12) Max Grav20=2765(LC 1), 11=2086(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-21=-613/1582, 3-21=-607/1653, 3-4=-2483/175, 4-5=-2611/316, 5-6=-2033/355, 6-7=-1601/346, 7-22=-1911/353, 8-22=-1991/322, 8-9=-2053/321, 9-10=-2592/330, 10-23=-2611/305, 11-23=-2748/304 BOT CHORD 2-20=-1533/628, 19-20=-1533/646, 18-19=-115/2543, 17-18=-115/2543, 17-24=-122/2197, 16-24=-122/2197, 16-25=-17/1660, 15-25=-17/1660, 14-15=-137/2102, 14-26=-137/2102, 13-26=-137/2102, 13-27=-137/2102, 11-27=-137/2102 WEBS 3-20=-2605/469, 3-19=-632/3825, 4-19=-1112/257, 4-17=-379/26, 5-17=0/413, 5-16=-798/158, 6-16=-80/774, 6-15=-287/336, 7-15=-58/623, 9-15=-721/182, 9-13=0/393 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=44ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-6-7 to 2-10-6, Interior(1) 2-10-6 to 24-0-0, Exterior(2E) 24-0-0 to 28-0-0, Exterior(2R) 28-0-0 to 34-2-11, Interior(1) 34-2-11 to 45-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 20=298, 11=132. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss E4 Truss Type Roof Special Qty 2 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:52 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-nIQfSqC0AdBLg6MosYd7Jsa2pM8LXqHu_sEh51zvSfX Scale = 1:90.0 T1 T3 T4 B1W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 HW2 T2 T5 B3B212 3 4 5 6 7 8 9 10 11 12 19 18 17 16 15 14 13 20 21 22 23 24 25 5x6 3x6 5x6 3x6 4x6 4x8 2x4 3x8 3x4 3x4 3x8 3x4 3x4 5x6 5x8 5x6 5x6 3x6 6-0-0 6-0-0 6-2-12 0-2-12 11-3-10 5-0-14 18-7-13 7-4-3 26-0-0 7-4-3 35-7-4 9-7-4 44-0-0 8-4-12 -1-6-0 1-6-0 6-2-5 6-2-5 11-3-10 5-1-5 18-7-13 7-4-3 26-0-0 7-4-3 31-10-13 5-10-13 37-9-11 5-10-13 44-0-0 6-2-5 45-6-0 1-6-0 0- 3 - 1 4 12 - 1 1 - 6 0- 1 1 - 6 3.00 12 8.00 12 Plate Offsets (X,Y)-- [3:0-3-8,0-2-0], [4:0-3-0,0-2-12], [6:0-1-12,0-1-8], [9:0-3-0,0-3-0], [11:0-6-2,0-0-1], [18:0-2-0,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.73 0.66 0.55 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.38 -0.56 0.08 0.06 (loc) 13-15 13-15 11 16-18 l/defl >999 >806 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 240 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W2,W7: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Right 2x8 DF SS -t 3-9-13 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-8-8 oc purlins. BOT CHORD Rigid ceiling directly applied or 5-2-0 oc bracing. WEBS 1 Row at midpt 6-15, 8-15 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 19=2765/0-5-8 (min. 0-2-15), 11=1991/0-5-8 (min. 0-2-2) Max Horz19=214(LC 11) Max Uplift19=-298(LC 12), 11=-132(LC 12) Max Grav19=2765(LC 1), 11=2045(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-20=-616/1595, 3-20=-610/1665, 3-4=-2494/139, 4-5=-2532/257, 5-6=-2281/276, 6-21=-1881/283, 7-21=-1737/313, 7-22=-1643/334, 8-22=-1845/309, 8-9=-2525/352, 9-10=-2616/305, 10-11=-2748/277 BOT CHORD 2-19=-1546/631, 18-19=-1546/641, 17-18=-72/2574, 16-17=-72/2574, 16-23=-67/2131, 15-23=-67/2131, 14-15=-49/1833, 14-24=-49/1833, 24-25=-49/1833, 13-25=-49/1833, 11-13=-132/2073 WEBS 3-19=-2609/457, 3-18=-625/3872, 4-18=-1110/261, 4-16=-475/25, 6-16=0/437, 6-15=-897/168, 7-15=-192/1465, 8-15=-728/194, 8-13=-54/567, 9-13=-290/142 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=44ft; eave=5ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-6-7 to 2-10-6, Interior(1) 2-10-6 to 26-0-0, Exterior(2R) 26-0-0 to 30-4-13, Interior(1) 30-4-13 to 45-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 19=298, 11=132. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss E5 Truss Type Common Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:53 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-FU_2gADexxJCIGx_QF8Ms46GOmUtGHp2DW_EdTzvSfW Scale = 1:76.6 T2 T3 B1 W3 W4 W5 W6 W7 W8W1 W2 HW2 T1 T4 B1 1 2 3 4 5 6 7 8 9 14 13 12 11 10 15 16 17 18 19 4x4 4x6 3x6 3x4 3x4 3x4 3x8 3x4 3x4 5x6 4x6 4x8 5x6 5x6 7-1-12 7-1-12 14-0-0 6-10-4 23-10-4 9-10-4 32-0-0 8-1-12 7-1-12 7-1-12 14-0-0 6-10-4 19-10-13 5-10-13 25-9-11 5-10-13 32-0-0 6-2-5 33-6-0 1-6-0 3- 7 - 6 12 - 1 1 - 6 0- 1 1 - 6 8.00 12 Plate Offsets (X,Y)-- [1:Edge,0-0-12], [2:0-2-0,Edge], [3:0-1-12,0-1-8], [6:0-3-0,0-3-0], [8:0-6-2,0-0-1] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.55 0.64 0.53 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.34 -0.51 0.05 0.03 (loc) 10-12 10-12 8 10-12 l/defl >999 >750 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 197 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W5,W1: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Right 2x8 DF SS -t 3-9-13 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-7-2 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-12, 5-12 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 14=1621/0-5-8 (min. 0-1-12), 8=1764/0-5-8 (min. 0-1-14) Max Horz14=-248(LC 10) Max Uplift14=-92(LC 12), 8=-133(LC 12) Max Grav14=1662(LC 17), 8=1801(LC 18) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1560/133, 2-3=-1410/150, 3-15=-1452/188, 4-15=-1314/203, 4-16=-1221/215, 5-16=-1423/190, 5-6=-2158/213, 6-7=-2235/164, 7-8=-2354/136, 1-14=-1555/133 BOT CHORD 13-14=-165/274, 13-17=0/1314, 12-17=0/1314, 11-12=0/1489, 11-18=0/1489, 18-19=0/1489, 10-19=0/1489, 8-10=-45/1766 WEBS 3-13=-415/84, 3-12=-317/101, 4-12=-113/1020, 5-12=-736/141, 5-10=-33/612, 6-10=-308/118, 1-13=-56/1230 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=32ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-1-12 to 3-4-2, Interior(1) 3-4-2 to 14-0-0, Exterior(2R) 14-0-0 to 17-2-6, Interior(1) 17-2-6 to 33-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14 except (jt=lb) 8=133. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss F1 Truss Type ROOF SPECIAL Qty 4 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:54 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-jgYQtWEGiFR3vQWA_zgbOHfLv9tT?e0BSAjnAwzvSfV Scale = 1:73.7 T2 T3 B1 B2 B3 W3 W4 W5 W6 W7 W8 W9 W1 W2 T1 T4 W11W10 1 2 3 4 5 6 7 8 14 13 12 11 10 9 15 16 3x6 4x4 5x6 3x4 5x7 3x4 3x4 3x8 3x6 5x6 4x6 5x6 5x7 7-11-0 7-11-0 14-0-0 6-1-0 19-8-12 5-8-12 25-8-10 5-11-14 32-0-0 6-3-6 7-11-0 7-11-0 14-0-0 6-1-0 19-8-12 5-8-12 25-8-10 5-11-14 32-0-0 6-3-6 33-6-0 1-6-0 3- 7 - 6 12 - 1 1 - 6 0- 1 1 - 6 3- 1 1 - 4 8.00 12 4.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-8], [3:0-1-12,0-1-8], [4:0-1-4,0-2-0], [5:0-2-4,0-1-8], [6:0-3-0,0-3-0], [7:0-3-0,0-1-12], [9:0-0-8,0-1-8], [11:0-2-8,0-2-12], [12:0-1-14,0-1-8], [13:0-2-0 ,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.95 0.49 0.85 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.25 -0.37 0.25 0.07 (loc) 10-11 10-11 9 10-11 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 191 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W1,W10: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BRACING- TOP CHORD Structural wood sheathing directly applied or 3-1-5 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-13, 3-12, 5-12 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 14=1613/0-5-8 (min. 0-1-12), 9=1770/0-5-8 (min. 0-1-12) Max Horz14=-255(LC 10) Max Uplift14=-91(LC 12), 9=-136(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1572/134, 2-3=-1384/152, 3-15=-1619/164, 4-15=-1459/190, 4-16=-1459/198, 5-16=-1594/174, 5-6=-3176/167, 6-7=-3557/181, 1-14=-1541/135, 7-9=-1830/173 BOT CHORD 13-14=-173/291, 12-13=0/1224, 11-12=0/2675, 10-11=-73/3005, 9-10=-30/416 WEBS 3-13=-727/63, 3-12=-129/256, 4-12=-108/1122, 5-12=-2030/93, 5-11=0/1926, 6-11=-383/114, 6-10=-254/63, 1-13=-46/1113, 7-10=-67/2489 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=32ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-1-12 to 3-4-2, Interior(1) 3-4-2 to 14-0-0, Exterior(2R) 14-0-0 to 17-2-6, Interior(1) 17-2-6 to 33-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Bearing at joint(s) 9 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14 except (jt=lb) 9=136. 7) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss F2 Truss Type Roof Special Qty 3 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:55 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-Bt6o5sFuTYZwXa5NXgBqxVCZUZBuk8EKgqTLiMzvSfU Scale = 1:74.3 T1 T2 B1 B3 W8 W9 W1 HW2 B2 W2 W3 W4 W5 W7 W6 T3 1 2 3 4 5 6 7 8 13 12 10 911 14 15 4x4 5x6 2x4 6x8 5x6 5x6 5x6 2x4 6x12 4x4 3x4 3x8 3x4 2-2-8 2-2-8 7-9-0 5-6-8 13-5-12 5-8-12 13-7-8 0-1-12 19-6-11 5-11-3 25-9-0 6-2-5 2-2-8 2-2-8 7-9-0 5-6-8 13-5-12 5-8-12 19-6-11 6-0-15 25-9-0 6-2-5 27-3-0 1-6-0 7- 9 - 6 12 - 1 1 - 6 0- 1 1 - 6 3- 1 1 - 4 8.00 12 4.00 12 Plate Offsets (X,Y)-- [1:0-1-8,0-2-0], [2:0-1-12,0-1-8], [3:0-1-4,0-2-0], [4:0-1-4,0-1-8], [5:0-3-0,0-3-0], [7:0-2-0,0-0-2], [10:0-2-8,0-2-8], [12:0-3-4,Edge], [13:0-2-0,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.76 0.54 0.66 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.19 -0.30 0.22 0.05 (loc) 9-10 9-10 7 9-10 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 179 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except* T3: 2x4 DF 2400F 2.0E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Right 2x8 DF SS -t 3-10-9 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-0-7 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-13, 2-12, 4-11 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 13=1296/Mechanical, 7=1450/0-5-8 (min. 0-1-8) Max Horz13=-291(LC 10) Max Uplift13=-77(LC 12), 7=-113(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-368/148, 2-14=-944/138, 3-14=-816/152, 3-15=-713/162, 4-15=-958/138, 4-5=-2203/116, 5-6=-2674/143, 6-7=-2843/114, 1-13=-1269/127 BOT CHORD 9-10=-38/2229, 7-9=-38/2212, 11-12=-94/418, 10-11=0/1867 WEBS 5-10=-373/139, 1-12=-128/1093, 2-12=-1110/136, 2-11=0/623, 3-11=-63/425, 4-10=0/1436, 4-11=-1668/74 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=26ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 7-9-0, Exterior(2R) 7-9-0 to 10-9-0, Interior(1) 10-9-0 to 27-4-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Bearing at joint(s) 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13 except (jt=lb) 7=113. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss F3 Truss Type Roof Special Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:56 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-f3gAICFWEshn9jgZ5Oi3Tikk5zYbTXbUvUCuEozvSfT Scale = 1:79.3 T1 T2 B1 B3 W8 W9 W1 HW2 B2 W2 W3 W4 W5 W7 W6 T3 1 2 3 4 5 6 7 8 13 12 10 911 14 15 4x4 5x6 3x6 6x8 5x6 5x6 5x6 2x4 5x8 M18SHS 3x4 3x4 3x8 3x4 1-11-12 1-11-12 2-2-8 0-2-12 7-9-0 5-6-8 13-5-12 5-8-12 13-7-8 0-1-12 19-6-11 5-11-3 25-9-0 6-2-5 2-2-8 2-2-8 7-9-0 5-6-8 13-5-12 5-8-12 19-6-11 6-0-15 25-9-0 6-2-5 27-3-0 1-6-0 7- 9 - 6 12 - 1 1 - 6 0- 1 1 - 6 3- 1 1 - 4 8.00 12 4.00 12 Plate Offsets (X,Y)-- [1:0-1-0,0-1-8], [2:0-1-12,0-1-8], [3:0-2-0,0-2-8], [4:0-1-12,0-1-8], [5:0-3-0,0-3-0], [7:0-2-0,0-0-2], [10:0-2-8,0-2-8], [12:0-3-8,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.71 0.45 0.91 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.15 -0.23 0.17 0.03 (loc) 9-10 9-10 7 9-10 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 179 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Right 2x8 DF SS -t 3-10-9 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-0-3 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 2-12, 3-11, 4-11 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 13=-984/Mechanical, 7=1249/0-5-8 (min. 0-1-8), 12=2481/0-5-8 (min. 0-2-10) Max Horz13=-291(LC 10) Max Uplift13=-984(LC 1), 7=-107(LC 12), 12=-67(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-39/369, 2-14=-537/121, 3-14=-407/135, 3-15=-319/145, 4-15=-549/121, 4-5=-1633/91, 5-6=-2143/121, 6-7=-2312/93, 1-13=0/954 BOT CHORD 9-10=-20/1790, 7-9=-20/1775, 11-12=-353/223, 10-11=0/1340 WEBS 5-10=-440/139, 1-12=-831/64, 2-12=-1492/135, 2-11=0/914, 4-10=0/1146, 4-11=-1421/63 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=26ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 7-9-0, Exterior(2R) 7-9-0 to 10-9-0, Interior(1) 10-9-0 to 27-4-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Bearing at joint(s) 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 12 except (jt=lb) 13=984, 7=107. 9) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss F4 Truss Type Roof Special Qty 4 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:57 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-7FEYWYG8?ApemtFlf5DI0wHwpNv4C_2d88ySnFzvSfS Scale = 1:79.3 T1 T2 B1 B3 W8 W9 W1 HW2 B2 W2 W3 W4 W5 W7 W6 T3 1 2 3 4 5 6 7 12 11 9 810 13 14 4x4 5x6 3x6 6x8 5x6 5x6 5x6 2x4 5x8 M18SHS 3x4 3x4 3x8 3x4 1-11-12 1-11-12 2-2-8 0-2-12 7-9-0 5-6-8 13-5-12 5-8-12 13-7-8 0-1-12 19-6-11 5-11-3 25-9-0 6-2-5 2-2-8 2-2-8 7-9-0 5-6-8 13-5-12 5-8-12 19-6-11 6-0-15 25-9-0 6-2-5 7- 9 - 6 12 - 1 1 - 6 0- 1 1 - 6 3- 1 1 - 4 8.00 12 4.00 12 Plate Offsets (X,Y)-- [1:0-1-0,0-1-8], [2:0-1-12,0-1-8], [3:0-2-0,0-2-8], [4:0-1-8,0-1-8], [5:0-3-0,0-3-0], [7:0-2-0,0-0-2], [9:0-2-8,0-2-8], [11:0-3-8,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.65 0.43 0.90 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.14 -0.23 0.17 0.03 (loc) 8-9 8-9 7 8-9 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 177 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Right 2x8 DF SS -t 3-10-9 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-3-3 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 2-11, 3-10, 4-10 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 12=-970/Mechanical, 7=1101/Mechanical, 11=2471/0-5-8 (min. 0-2-10) Max Horz12=-287(LC 10) Max Uplift12=-970(LC 1), 7=-62(LC 12), 11=-74(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-40/365, 2-13=-543/124, 3-13=-413/138, 3-14=-325/148, 4-14=-554/124, 4-5=-1651/106, 5-6=-2184/143, 6-7=-2350/122, 1-12=0/940 BOT CHORD 8-9=-53/1832, 7-8=-53/1819, 10-11=-349/217, 9-10=0/1354 WEBS 5-9=-466/142, 1-11=-820/68, 2-11=-1494/138, 2-10=0/917, 4-9=0/1166, 4-10=-1435/78 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=26ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 7-9-0, Exterior(2R) 7-9-0 to 10-9-0, Interior(1) 10-9-0 to 25-7-14 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 11 except (jt=lb) 12=970. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss F5 Truss Type Hip Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:10:58 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-bRnxjuHmmTxVO1qyDpkXZ7q3cnDVxWJnNoh?JhzvSfR Scale = 1:69.5 T1 T2 T3 B1 B3 W9 W10 W11 W1 HW2 B2 W3 W2 W4 W5 W6 W7 W8 T4 1 2 3 4 5 6 7 8 9 15 14 11 1013 12 16 17 18 19 4x6 4x4 3x4 2x4 6x8 5x6 5x6 3x4 5x6 3x4 2x4 6x12 3x4 4x4 3x4 3x8 2-2-8 2-2-8 6-7-8 4-5-0 8-10-8 2-3-0 13-5-12 4-7-4 19-11-3 6-5-7 25-9-0 5-9-13 2-2-8 2-2-8 6-7-8 4-5-0 8-10-8 2-3-0 13-5-12 4-7-4 14-4-13 0-11-1 19-11-3 5-6-5 25-9-0 5-9-13 7- 9 - 6 12 - 0 - 9 12 - 2 - 6 0- 1 1 - 6 3- 1 1 - 4 12 - 0 - 9 8.00 12 4.00 12 Plate Offsets (X,Y)-- [1:0-1-8,0-2-0], [2:0-1-12,0-1-8], [3:0-3-0,0-1-0], [4:0-2-0,0-1-12], [5:0-1-4,0-1-8], [7:0-1-12,0-1-8], [9:0-2-0,0-0-2], [11:0-2-8,0-2-8], [14:0-3-4,Edge], [15:0-2-0 ,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.77 0.55 0.64 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.20 -0.32 0.22 0.05 (loc) 10-11 10-11 9 10-11 l/defl >999 >970 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 198 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except* T4: 2x4 DF 2400F 2.0E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Right 2x8 DF SS -t 3-7-14 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-11-6 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-15, 2-14, 3-13, 5-12 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 15=1301/Mechanical, 9=1301/Mechanical Max Horz15=-274(LC 10) Max Uplift15=-79(LC 12), 9=-68(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-379/138, 2-16=-852/114, 16-17=-837/119, 3-17=-748/135, 3-4=-812/135, 4-18=-1098/142, 5-18=-1115/121, 5-6=-2136/89, 6-7=-2237/62, 7-19=-2710/134, 8-19=-2727/120, 8-9=-2882/113, 1-15=-1266/118 BOT CHORD 10-11=-51/2279, 9-10=-50/2259, 13-14=-90/395, 12-13=0/674, 11-12=0/1887 WEBS 5-11=0/1446, 7-11=-398/133, 2-14=-1099/107, 1-14=-93/1062, 2-13=0/676, 3-13=-616/23, 3-12=-18/780, 4-12=-53/330, 5-12=-1670/72 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=26ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 6-7-8, Exterior(2E) 6-7-8 to 8-10-8, Exterior(2R) 8-10-8 to 13-1-7, Interior(1) 13-1-7 to 25-7-14 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 15, 9. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss F6 Truss Type Hip Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:00 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-Yqvh8aI1I5BDeL_KKEm?eYvMvav_PQ24q6A6NZzvSfP Scale = 1:62.0 T1 T2 T3 B1 B3 W11 W1 HW2 B2 W2 W3 W4 W5 W6 W7 W9 W8 W10 T4 1 2 3 4 5 6 7 8 14 13 10 9 12 11 15 16 17 18 5x6 4x6 5x6 2x4 6x8 5x6 5x6 2x4 6x12 4x4 3x4 3x4 3x8 3x4 5x6 2-2-8 2-2-8 4-7-8 2-5-0 10-10-8 6-3-0 13-5-12 2-7-4 13-7-8 0-1-12 19-5-10 5-10-2 25-9-0 6-3-6 2-2-8 2-2-8 4-7-8 2-5-0 10-10-8 6-3-0 13-5-12 2-7-4 18-2-0 4-8-4 19-5-10 1-3-10 25-9-0 6-3-6 7- 9 - 6 10 - 8 - 9 10 - 1 0 - 6 0- 1 1 - 6 3- 1 1 - 4 10 - 8 - 9 8.00 12 4.00 12 Plate Offsets (X,Y)-- [1:0-1-4,0-2-0], [2:0-1-12,0-1-8], [3:0-3-0,0-2-0], [4:0-3-0,0-1-12], [5:0-1-4,0-1-8], [6:0-3-0,0-3-0], [8:0-2-0,0-0-2], [10:0-2-8,0-2-8], [13:0-3-4,Edge], [14:0-2-0 ,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.98 0.55 0.62 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.20 -0.32 0.22 0.05 (loc) 9-10 9-10 8 9-10 l/defl >999 >970 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 192 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Right 2x8 DF SS -t 3-11-3 BRACING- TOP CHORD Structural wood sheathing directly applied, except end verticals, and 2-0-0 oc purlins (5-7-3 max.): 3-4. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-14, 2-13, 3-12, 5-11 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 14=1301/Mechanical, 8=1301/Mechanical Max Horz14=-253(LC 10) Max Uplift14=-79(LC 12), 8=-68(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-399/158, 2-15=-619/128, 3-15=-516/138, 3-16=-1143/123, 16-17=-1143/123, 4-17=-1143/123, 4-5=-1434/133, 5-18=-2026/97, 6-18=-2202/78, 6-7=-2705/130, 7-8=-2873/110, 1-14=-1259/125 BOT CHORD 9-10=-42/2264, 8-9=-42/2249, 12-13=-91/366, 11-12=-13/596, 10-11=0/1849 WEBS 1-13=-101/990, 2-13=-1062/90, 2-12=-33/899, 3-12=-853/85, 3-11=-12/940, 4-11=-12/376, 5-10=0/1412, 5-11=-1517/58, 6-10=-396/129 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=26ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 4-7-8, Exterior(2R) 4-7-8 to 8-10-7, Interior(1) 8-10-7 to 10-10-8, Exterior(2R) 10-10-8 to 15-1-7, Interior(1) 15-1-7 to 25-7-14 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14, 8. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss G1G Truss Type Common Supported Gable Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:01 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-00T3LvJf3OJ4FVZXuxIEAmSj2_MJ8?XD3mwfw0zvSfO Scale = 1:27.9 W1 T1 T1 W1 B1 ST3 ST2 ST1 ST2 ST1 1 2 3 4 5 6 7 8 9 16 15 14 13 12 11 10 17 18 4x4 12-0-0 12-0-0 -1-6-0 1-6-0 6-0-0 6-0-0 12-0-0 6-0-0 13-6-0 1-6-0 0- 1 1 - 6 4- 1 1 - 6 0- 1 1 - 6 8.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.25 0.03 0.10 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.02 -0.03 0.00 (loc) 9 9 10 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 61 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 10-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 12-0-0. (lb) - Max Horz16=-97(LC 10) Max Uplift All uplift 100 lb or less at joint(s) 16, 10, 14, 15, 12, 11 Max Grav All reactions 250 lb or less at joint(s) 14, 15, 12, 11 except 16=271(LC 23), 10=271(LC 24), 13=268(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=2ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Corner(3E) -1-7-0 to 1-5-0, Exterior(2N) 1-5-0 to 6-0-0, Corner(3R) 6-0-0 to 9-0-0, Exterior(2N) 9-0-0 to 13-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 2-0-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 16, 10, 14, 15, 12, 11. 11) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss G2 Truss Type Common Qty 2 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:02 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-UD1RZFKHqiRwte7jSepTjz_twOgStSuMHQfCSSzvSfN Scale = 1:29.6 T1 T1 B1 W1 HW1 HW1 1 2 3 4 5 6 7 8 4x4 3x8 5x6 5x6 3x8 5x6 5x6 2x4 6-0-0 6-0-0 12-0-0 6-0-0 -1-6-0 1-6-0 6-0-0 6-0-0 12-0-0 6-0-0 13-6-0 1-6-0 0- 1 1 - 6 4- 1 1 - 6 0- 1 1 - 6 8.00 12 Plate Offsets (X,Y)-- [2:0-6-2,0-0-1], [4:0-2-0,0-2-4], [6:0-6-2,0-0-1] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.30 0.16 0.09 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.03 -0.04 0.01 -0.01 (loc) 6-8 6-8 6 2-8 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 68 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Left 2x8 DF SS -t 3-8-4, Right 2x8 DF SS -t 3-8-4 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=748/0-5-8 (min. 0-1-8), 6=748/0-5-8 (min. 0-1-8) Max Horz2=79(LC 11) Max Uplift2=-75(LC 12), 6=-75(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-706/89, 3-4=-520/106, 4-5=-520/106, 5-6=-706/89 BOT CHORD 2-8=0/433, 6-8=0/433 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 6-0-0, Exterior(2R) 6-0-0 to 9-0-0, Interior(1) 9-0-0 to 13-7-0 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 6. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss G3 Truss Type Common Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:03 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-yPbqmbLvb0ZnVoiv?MKiGBX2Moxico9WW4Pm_uzvSfM Scale = 1:29.2 T1 T1 B1 W2 W1 W2 W1 HW1 HW11 2 3 4 5 6 7 9 810 11 12 13 14 15 5x7 4x4 4x4 5x7 4x4 6x8 2x4 6x8 2x4 4-1-3 4-1-3 7-10-13 3-9-11 12-0-0 4-1-3 3-1-12 3-1-12 6-0-0 2-10-4 8-10-4 2-10-4 12-0-0 3-1-12 0- 1 1 - 6 4- 1 1 - 6 0- 1 1 - 6 8.00 12 Plate Offsets (X,Y)-- [4:0-2-0,0-1-12], [8:0-4-0,0-4-4], [9:0-4-0,0-4-4] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.26 0.48 0.54 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.04 -0.06 0.02 0.01 (loc) 8-9 8-9 7 8-9 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 145 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std SLIDER Left 2x6 DF 1800F 1.6E -t 1-10-11, Right 2x6 DF 1800F 1.6E -t 1-10-11 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 1=3898/0-5-8 (min. 0-2-1), 7=4238/0-5-8 (min. 0-2-4) Max Horz1=-71(LC 6) Max Uplift1=-246(LC 8), 7=-259(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-4283/271, 2-3=-4236/288, 3-4=-4118/310, 4-5=-4246/314, 5-6=-4360/292, 6-7=-4400/274 BOT CHORD 1-10=-189/3371, 10-11=-189/3371, 9-11=-189/3371, 9-12=-116/2608, 12-13=-116/2608, 8-13=-116/2608, 8-14=-192/3485, 14-15=-192/3485, 7-15=-192/3485 WEBS 4-8=-160/2428, 5-8=-139/283, 4-9=-152/2153, 3-9=-138/307 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-7-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=246, 7=259. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1085 lb down and 78 lb up at 1-0-12 , 1085 lb down and 78 lb up at 3-0-12, 1085 lb down and 78 lb up at 5-0-12, 1085 lb down and 78 lb up at 7-0-12, and 1285 lb down and 84 lb up at 9-0-12, and 1286 lb down and 84 lb up at 11-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard Continued on page 2 Job B0043-21 Truss G3 Truss Type Common Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:03 2021 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-yPbqmbLvb0ZnVoiv?MKiGBX2Moxico9WW4Pm_uzvSfM LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-4=-86, 4-7=-86, 1-7=-16 Concentrated Loads (lb) Vert: 10=-1085(F) 11=-1085(F) 12=-1085(F) 13=-1085(F) 14=-1285(F) 15=-1286(F) Job B0043-21 Truss J1 Truss Type Jack-Open Qty 8 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:04 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-Qb9C_xMXLJhe6yH5Z3rxoO4EuBO7LNmflk8JWLzvSfL Scale = 1:14.1 T1 B1 HW1 1 2 3 4 53x8 5x6 1-11-11 1-11-11 -1-6-0 1-6-0 1-11-11 1-11-11 0- 1 1 - 6 2- 3 - 2 1- 9 - 1 5 2- 3 - 2 8.00 12 Plate Offsets (X,Y)-- [2:0-2-8,0-0-1] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-P 0.15 0.02 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.00 -0.00 0.00 0.00 (loc) 2 2-5 4 2 l/defl >999 >999 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 13 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Left 2x8 DF SS -t 1-7-13 BRACING- TOP CHORD Structural wood sheathing directly applied or 1-11-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 4=30/Mechanical, 2=291/0-5-8 (min. 0-1-8), 5=16/Mechanical Max Horz2=58(LC 12) Max Uplift4=-20(LC 9), 2=-43(LC 12) Max Grav4=33(LC 17), 2=291(LC 1), 5=35(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 1-11-9 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 2. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss J2 Truss Type Jack-Open Qty 6 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:05 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-uoiaBHM96dpVk6sI7nMALccP3bj84q0p_Out3nzvSfK Scale = 1:20.6 T1 B1 HW1 1 2 3 6 7 4 53x8 5x6 3-11-11 3-11-11 -1-6-0 1-6-0 3-11-11 3-11-11 0- 1 1 - 6 3- 7 - 2 3- 1 - 1 5 3- 7 - 2 8.00 12 Plate Offsets (X,Y)-- [2:0-2-8,0-0-1] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-P 0.18 0.10 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.01 -0.02 0.01 0.00 (loc) 2-5 2-5 4 2 l/defl >999 >999 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 22 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Left 2x8 DF SS -t 2-6-11 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-11-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 4=141/Mechanical, 2=363/0-5-8 (min. 0-1-8), 5=31/Mechanical Max Horz2=88(LC 12) Max Uplift4=-49(LC 12), 2=-31(LC 12) Max Grav4=141(LC 1), 2=363(LC 1), 5=70(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 3-10-15 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 2. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss J3 Truss Type Jack-Open Qty 6 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:06 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-M_GyOdNotxxMMGRUhUtPtp9U5?14pHGyC2dQbDzvSfJ Scale = 1:26.9 T1 B1 HW1 1 2 3 6 4 53x8 5x6 5x6 5-11-11 5-11-11 -1-6-0 1-6-0 5-11-11 5-11-11 0- 1 1 - 6 4- 1 1 - 2 4- 5 - 1 5 4- 1 1 - 2 8.00 12 Plate Offsets (X,Y)-- [2:0-2-8,0-0-1] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-P 0.55 0.25 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.06 -0.12 0.03 0.00 (loc) 2-5 2-5 4 2 l/defl >999 >615 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 31 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Left 2x8 DF SS -t 3-9-2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-11-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 4=236/Mechanical, 2=456/0-5-8 (min. 0-1-8), 5=47/Mechanical Max Horz2=118(LC 12) Max Uplift4=-76(LC 12), 2=-24(LC 12) Max Grav4=236(LC 1), 2=456(LC 1), 5=106(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 5-10-15 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 2. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss J4 Truss Type Jack-Open Qty 2 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:06 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-M_GyOdNotxxMMGRUhUtPtp9aT?1IpHGyC2dQbDzvSfJ Scale = 1:20.6 T1 B1 B2 B3 HW1 1 2 3 4 8 7 9 5 6 3x8 5x6 2x4 2x4 2x4 2-5-8 2-5-8 3-11-11 1-6-3 -1-6-0 1-6-0 2-5-8 2-5-8 3-11-11 1-6-3 0- 1 1 - 6 3- 7 - 2 2- 7 - 2 3- 1 - 1 5 1- 0 - 0 8.00 12 Plate Offsets (X,Y)-- [2:0-2-8,0-0-1], [7:0-2-0,0-0-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.14 0.23 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.01 -0.01 0.01 0.01 (loc) 7 7 6 7 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 22 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except* B2: 2x4 DF Stud/Std SLIDER Left 2x8 DF SS -t 1-9-3 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-11-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 5=102/Mechanical, 2=363/0-5-8 (min. 0-1-8), 6=70/Mechanical Max Horz2=88(LC 12) Max Uplift5=-24(LC 12), 2=-31(LC 12), 6=-8(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 3-10-15 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 2, 6. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss J5 Truss Type Jack-Open Qty 2 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:07 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-qAqKczOQeE4DzQ0gECOeQ1ijcPHvYkW6RiNz7fzvSfI Scale = 1:28.1 T1 B1 B2 B3HW1 1 2 3 4 8 7 9 5 6 3x8 5x6 2x4 2x4 4x6 2-5-8 2-5-8 5-11-11 3-6-3 -1-6-0 1-6-0 2-5-8 2-5-8 5-11-11 3-6-3 0- 1 1 - 6 4- 1 1 - 2 0- 5 - 3 4- 5 - 1 5 3- 1 1 - 2 1- 0 - 0 8.00 12 Plate Offsets (X,Y)-- [2:0-2-8,0-0-1] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.31 0.59 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.08 -0.12 0.05 0.06 (loc) 6-7 6-7 6 6-7 l/defl >892 >589 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 28 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except* B2: 2x4 DF Stud/Std SLIDER Left 2x8 DF SS -t 1-9-3 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-11-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 5=185/Mechanical, 2=456/0-5-8 (min. 0-1-8), 6=98/Mechanical Max Horz2=118(LC 12) Max Uplift5=-47(LC 12), 2=-24(LC 12), 6=-4(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-346/0, 3-9=-252/0 NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 5-10-15 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 2, 6. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss K1 Truss Type Half Hip Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:09 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-nZy51fPgAsKxDjA3MdR6VSn4RC3C0ZCOv0s4CYzvSfG Scale = 1:38.3 T1 T2 W5 B1 W1 W2 W3 W4 W5 W4 HW1 1 2 3 4 5 6 7 11 10 9 8 12 13 4x4 2x4 4x4 3x6 3x4 3x4 2x4 3x8 2x4 3x8 4-1-12 4-1-12 8-0-0 3-10-4 11-1-0 3-1-0 14-5-8 3-4-8 -1-6-0 1-6-0 4-1-12 4-1-12 8-0-0 3-10-4 11-1-0 3-1-0 14-5-8 3-4-8 0- 1 1 - 6 6- 1 - 9 6- 3 - 6 6- 1 - 9 8.00 12 Plate Offsets (X,Y)-- [4:0-1-12,0-1-8], [5:0-2-0,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.22 0.16 0.37 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.02 -0.03 0.01 0.01 (loc) 10 9-10 8 10 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 215 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -t 2-5-12 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-7. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 8=2192/0-5-8 (min. 0-1-8), 2=1638/0-3-8 (min. 0-1-8) Max Horz2=164(LC 26) Max Uplift8=-363(LC 5), 2=-226(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-2068/263, 3-4=-1958/273, 4-5=-1877/316, 5-6=-1513/284 BOT CHORD 2-11=-286/1546, 10-11=-286/1546, 10-12=-208/1041, 9-12=-208/1041, 9-13=-208/1041, 8-13=-208/1041 WEBS 4-10=-255/167, 5-10=-116/703, 6-10=-171/958, 6-9=-113/710, 6-8=-2079/346 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 8=363, 2=226. 9) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1122 lb down and 246 lb up at 8-0-0, 371 lb down and 71 lb up at 8-11-4, and 371 lb down and 71 lb up at 10-11-4, and 371 lb down and 71 lb up at 12-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard Continued on page 2 Job B0043-21 Truss K1 Truss Type Half Hip Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:09 2021 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-nZy51fPgAsKxDjA3MdR6VSn4RC3C0ZCOv0s4CYzvSfG LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-5=-86, 5-7=-86, 2-8=-16 Concentrated Loads (lb) Vert: 10=-1122(F) 9=-371(F) 12=-371(F) 13=-371(F) Job B0043-21 Truss K2 Truss Type Half Hip Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:10 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-FlWTE_QIx9SoqtlFwKyL2fJ6TcLJl1rY7gbek_zvSfF Scale = 1:43.8 T1 T2 W4 B1 W1 W2 W3 HW1 1 2 3 4 5 6 8 7 9 10 1112 4x6 2x4 3x12 4x4 4x4 2x4 3x8 3x4 10-0-0 10-0-0 14-5-8 4-5-8 -1-6-0 1-6-0 5-1-12 5-1-12 10-0-0 4-10-4 14-5-8 4-5-8 0- 1 1 - 6 7- 5 - 9 7- 7 - 6 7- 5 - 9 8.00 12 Plate Offsets (X,Y)-- [2:0-7-2,Edge], [5:0-3-0,0-1-12], [6:0-1-12,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.78 0.42 0.28 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.14 -0.26 0.01 0.01 (loc) 2-8 2-8 7 2-8 l/defl >999 >671 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 89 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Left 2x6 DF 1800F 1.6E -t 3-2-3 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-6. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 7=722/0-5-8 (min. 0-1-8), 2=873/0-3-8 (min. 0-1-8) Max Horz2=201(LC 11) Max Uplift7=-92(LC 9), 2=-76(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-9=-855/81, 3-9=-799/86, 3-4=-646/102, 4-10=-523/78, 5-10=-410/98, 5-11=-345/108, 11-12=-346/108, 6-12=-349/108, 6-7=-703/134 BOT CHORD 2-8=-223/597 WEBS 4-8=-329/121, 6-8=-144/640 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 10-0-0, Exterior(2E) 10-0-0 to 14-3-12 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 2. 7) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss K3 Truss Type Half Hip Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:11 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-jy4rSKRwiTafS1JST1TaatsL70lPURmhMKLBGRzvSfE Scale = 1:51.6 T2 T3 W5 B1 W1 W2 W3 W4 HW1 T1 1 2 3 4 5 6 7 10 9 8 11 12 3x4 5x6 3x4 3x4 3x8 4x4 4x4 3x4 2x4 3x4 6-1-12 6-1-12 12-0-0 5-10-4 14-5-8 2-5-8 -1-6-0 1-6-0 6-1-12 6-1-12 12-0-0 5-10-4 14-5-8 2-5-8 0- 1 1 - 6 8- 9 - 9 8- 1 1 - 6 8- 9 - 9 8.00 12 Plate Offsets (X,Y)-- [2:0-5-14,0-0-4], [4:0-1-12,0-1-8], [6:0-3-0,0-2-0], [8:0-1-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.53 0.17 0.50 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.02 -0.04 0.01 0.01 (loc) 9-10 9-10 8 2-10 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 103 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Left 2x6 DF 1800F 1.6E -t 3-9-5 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 6-7. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 7-8, 6-8 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 8=722/0-5-8 (min. 0-1-8), 2=873/0-3-8 (min. 0-1-8) Max Horz2=238(LC 11) Max Uplift8=-90(LC 9), 2=-72(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-11=-900/54, 3-11=-785/65, 3-4=-613/82, 4-5=-375/90, 5-12=-304/91, 6-12=-253/113 BOT CHORD 2-10=-211/589, 9-10=-211/589 WEBS 4-9=-511/124, 6-9=-82/388, 6-8=-717/193 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 12-0-0, Exterior(2E) 12-0-0 to 14-3-12 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8, 2. 7) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss K4 Truss Type Half Hip Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:11 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-jy4rSKRwiTafS1JST1TaatsM20jmUUIhMKLBGRzvSfE Scale = 1:59.5 T1 W3 B1 W1 W2 HW1 1 2 3 4 5 7 6 8 9 10 4x8 M18SHS 3x6 3x8 4x4 4x4 3x4 2x4 7-1-12 7-1-12 14-5-8 7-3-12 -1-6-0 1-6-0 7-1-12 7-1-12 14-0-0 6-10-4 14-5-8 0-5-8 0- 1 1 - 6 10 - 3 - 6 10 - 1 - 9 8.00 12 Plate Offsets (X,Y)-- [2:0-5-14,0-0-4], [4:0-1-12,0-1-8], [5:0-2-11,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.47 0.28 0.27 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.05 -0.09 0.01 -0.04 (loc) 2-7 2-7 6 6-7 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 M18SHS Weight: 94 lb FT = 0% GRIP 220/195 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W3: 2x6 DF 1800F 1.6E SLIDER Left 2x6 DF 1800F 1.6E -t 4-4-8 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-6, 4-6 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 6=718/0-5-8 (min. 0-1-8), 2=869/0-3-8 (min. 0-1-8) Max Horz2=281(LC 9) Max Uplift6=-91(LC 9), 2=-67(LC 12) Max Grav6=796(LC 17), 2=869(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-8=-883/60, 3-8=-825/74, 3-4=-673/92, 4-9=-277/116, 5-6=-270/128 BOT CHORD 2-10=-190/635, 7-10=-190/635, 6-7=-190/635 WEBS 4-7=0/311, 4-6=-723/133 NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 14-2-12 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) All plates are MT20 plates unless otherwise indicated. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 2. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss LAY01 Truss Type Lay-In Gable Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:12 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-B8eDfgSYTniW4Bue1l_p74PeUQ74D?8rb_4kotzvSfD Scale = 1:27.2 T1 T1 B1 ST2 ST1 ST1 1 2 3 4 5 8 7 62x4 4x4 2x4 2x4 2x4 2x4 2x4 2x4 6-10-14 6-10-14 3-5-7 3-5-7 6-10-14 3-5-7 0- 0 - 4 4- 1 - 1 3 0- 0 - 4 14.42 12 LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-P 0.04 0.02 0.04 DEFL. Vert(LL) Vert(CT) Horz(CT) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 31 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 6-10-14. (lb) - Max Horz1=-74(LC 10) Max Uplift All uplift 100 lb or less at joint(s) 1, 5, 8, 6 Max Grav All reactions 250 lb or less at joint(s) 1, 5, 7, 8, 6 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5, 8, 6. 7) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss LAY02 Truss Type Lay-In Gable Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:13 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-fKBcs0TBE4qNhLTqbSV2gIxdxqTIyQq_peqILJzvSfC Scale = 1:45.3 T1 W1 B1 ST2 ST1 1 2 3 4 7 6 5 2x4 2x4 2x4 2x4 2x4 2x4 2x4 6-3-11 6-3-11 0- 0 - 4 7- 6 - 1 5 14.42 12 LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-P 0.83 0.02 0.08 DEFL. Vert(LL) Vert(CT) Horz(CT) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 40 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 6-3-11. (lb) - Max Horz1=192(LC 11) Max Uplift All uplift 100 lb or less at joint(s) 1, 5, 6, 7 Max Grav All reactions 250 lb or less at joint(s) 1, 5, 6, 7 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-379/381, 2-3=-261/267 NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Corner(3) 0-3-12 to 4-3-11, Exterior(2R) 4-3-11 to 6-1-15 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Gable requires continuous bottom chord bearing. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5, 6, 7. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss LAY03 Truss Type Lay-In Gable Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:14 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-7Wl_4MTp?OyDJV209A0HCVU_lDo5hsH72IZrtlzvSfB Scale = 1:99.1 T1 T2 B1 B2 ST3ST2ST1 ST4 ST5 ST6 ST7 ST8 ST9 1 2 3 4 5 6 7 8 9 10 11 21 20 19 18 17 16 15 14 13 12 3x4 4x4 3x4 5x6 3x4 0-2-4 0-2-4 7-1-9 6-11-5 19-9-13 12-8-3 6-4-2 6-4-2 19-9-13 13-5-11 0- 5 - 8 16 - 2 - 5 8- 6 - 1 4 0- 0 - 4 8- 6 - 1 4 14.42 12 14.42 12 Plate Offsets (X,Y)-- [9:0-3-0,0-3-0], [18:0-2-4,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.06 0.05 0.19 DEFL. Vert(LL) Vert(CT) Horz(CT) in n/a n/a 0.01 (loc) - - 11 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 172 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std *Except* ST3,ST4: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-19, 3-20, 5-17, 6-16, 7-15 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 19-7-8. (lb) - Max Horz1=248(LC 11) Max Uplift All uplift 100 lb or less at joint(s) 19, 20, 17, 16, 15, 14, 13, 12 except 18=-256(LC 12), 21=-103(LC 12), 11=-121(LC 11) Max Grav All reactions 250 lb or less at joint(s) 1, 18, 20, 17, 16, 15, 14, 13, 12, 11 except 19=257(LC 12), 21=254(LC 17) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 9-10=-263/229, 10-11=-331/290 BOT CHORD 1-21=-331/368, 20-21=-320/361, 19-20=-323/365, 18-19=-322/374 WEBS 4-19=-252/202 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-4-9 to 3-4-9, Interior(1) 3-4-9 to 6-4-2, Exterior(2R) 6-4-2 to 9-4-2, Interior(1) 9-4-2 to 19-6-1 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are 2x4 MT20 unless otherwise indicated. 4) Gable requires continuous bottom chord bearing. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 19, 20, 17, 16, 15, 14, 13, 12 except (jt=lb) 18=256, 21=103, 11=121. 8) Beveled plate or shim required to provide full bearing surface with truss chord at joint(s) 1, 19, 20, 21. 9) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss LAY04 Truss Type Lay-In Gable Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:16 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-4vtkV2V3X?CxYoCPGb3lHwZKS1Uv9mWQWb2yxezvSf9 Scale = 1:72.4 T1 T1 B1 ST5 ST4 ST3 ST2 ST1 ST4 ST3 ST2 ST1 B2 1 2 3 4 5 6 7 8 9 10 11 20 19 18 17 16 15 14 13 12 3x4 4x4 3x4 5x6 19-9-14 19-9-14 9-10-15 9-10-15 19-9-14 9-10-15 0- 0 - 4 11 - 1 0 - 1 5 0- 0 - 4 14.42 12 Plate Offsets (X,Y)-- [19:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.04 0.02 0.14 DEFL. Vert(LL) Vert(CT) Horz(CT) in n/a n/a 0.00 (loc) - - 11 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 141 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-16, 5-17, 7-15 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 19-9-14. (lb) - Max Horz1=226(LC 11) Max Uplift All uplift 100 lb or less at joint(s) 11, 17, 18, 19, 20, 15, 14, 13, 12 except 1=-128(LC 10) Max Grav All reactions 250 lb or less at joint(s) 1, 11, 16, 17, 18, 19, 20, 15, 14, 13, 12 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-3-12 to 3-3-12, Interior(1) 3-3-12 to 9-10-15, Exterior(2R) 9-10-15 to 12-10-15, Interior(1) 12-10-15 to 19-6-2 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are 2x4 MT20 unless otherwise indicated. 4) Gable requires continuous bottom chord bearing. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 17, 18, 19, 20, 15, 14, 13, 12 except (jt=lb) 1=128. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss M1 Truss Type Jack-Closed Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:17 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-Y5R6iOWhIJKoAynbqIa_q86T0RlLu8FakFoVU4zvSf8 Scale = 1:38.3 W1 T1 W5 B1W2 W3 W4 1 2 3 6 5 4 7 8 7x8 2x4 4x4 6x8 3x4 4-0-0 4-0-0 8-0-0 4-0-0 4-0-0 4-0-0 8-0-0 4-0-0 0- 1 1 - 6 6- 3 - 6 8.00 12 Plate Offsets (X,Y)-- [2:0-1-12,0-1-8], [4:0-1-12,0-2-0], [5:0-3-8,0-4-4], [6:Edge,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2018/TPI2014 CSI. TC BC WB Matrix-P 0.18 0.33 0.50 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.02 -0.03 0.00 0.01 (loc) 5-6 5-6 4 5-6 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 106 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 6=2020/0-3-8 (min. 0-1-8), 4=2041/Mechanical Max Horz6=157(LC 5) Max Uplift6=-116(LC 8), 4=-159(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-6=-1597/102, 1-2=-2171/135 BOT CHORD 5-8=-157/1762, 4-8=-157/1762 WEBS 1-5=-82/1786, 2-5=-116/2245, 2-4=-2292/190 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 6=116, 4=159. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1101 lb down and 78 lb up at 2-0-12 , and 1101 lb down and 78 lb up at 4-0-12, and 1073 lb down and 75 lb up at 6-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-3=-86, 4-6=-16 Continued on page 2 Job B0043-21 Truss M1 Truss Type Jack-Closed Girder Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:17 2021 Page 2 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-Y5R6iOWhIJKoAynbqIa_q86T0RlLu8FakFoVU4zvSf8 LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 5=-1101(B) 7=-1101(B) 8=-1073(B) Job B0043-21 Truss M2 Truss Type Jack-Closed Qty 14 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:18 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-0I?UwjWJ2dSfo6MoO05DMLfYJr3Ydg5jzvX30XzvSf7 Scale = 1:38.3 T1 W2 B1 W1 HW1 1 2 3 4 5 6 7 2x4 3x4 3x8 5x6 2x4 8-0-0 8-0-0 -1-6-0 1-6-0 4-0-0 4-0-0 8-0-0 4-0-0 0- 1 1 - 6 6- 3 - 6 8.00 12 Plate Offsets (X,Y)-- [2:0-6-2,0-0-1] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-P 0.53 0.46 0.14 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.20 -0.36 0.00 0.00 (loc) 2-6 2-6 6 2 l/defl >472 >262 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 48 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std SLIDER Left 2x8 DF SS -t 2-5-15 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 6=387/Mechanical, 2=550/0-5-8 (min. 0-1-8) Max Horz2=165(LC 9) Max Uplift6=-55(LC 9), 2=-57(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-7=-407/69, 3-7=-294/75 WEBS 4-6=-289/176 NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 7-10-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 2. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss M3 Truss Type JACK-CLOSED Qty 4 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:19 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-UUZt73XypwaWPGx_xjcSvZBlgET3M3qtCZHcYzzvSf6 Scale = 1:39.1 W1 T1 W7 B1 B2 B3 W2 W3 W5 W4 W6 1 2 3 4 5 10 9 8 7 6 11 2x4 3x4 2x4 3x6 2x4 3x4 3x8 3x4 4x8 1-4-8 1-4-8 2-5-8 1-1-0 8-0-0 5-6-8 -1-6-0 1-6-0 1-4-8 1-4-8 2-5-8 1-1-0 8-0-0 5-6-8 0- 1 1 - 6 6- 3 - 6 5- 3 - 6 1- 0 - 0 8.00 12 Plate Offsets (X,Y)-- [2:0-1-12,0-1-8], [3:0-1-12,0-1-8], [4:0-1-12,0-1-8], [7:0-5-4,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-P 0.37 0.25 0.43 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.05 -0.09 0.02 0.01 (loc) 6-7 6-7 6 7 l/defl >999 >980 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 49 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr *Except* B2: 2x4 DF Stud/Std WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 9-11-9 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 10=558/0-5-8 (min. 0-1-8), 6=376/Mechanical Max Horz10=161(LC 9) Max Uplift10=-59(LC 12), 6=-56(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-10=-548/131, 2-3=-291/39, 3-4=-656/162 BOT CHORD 9-10=-295/204, 6-7=-447/719 WEBS 7-9=-238/275, 3-7=-301/630, 4-6=-734/413 NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-4-8, Interior(1) 1-4-8 to 7-10-4 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 6. 6) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss M4 Truss Type Monopitch Qty 5 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:20 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-yg6FKPYaaEiN1QVAVQ7hSmkt?eog5YI0QD095PzvSf5 Scale = 1:58.3 T2 W3 B1 W1 W2 HW1 T1 1 2 3 4 5 7 68 5x6 3x4 4x4 3x8 4x4 4x4 2x4 7-2-12 7-2-12 14-5-8 7-2-12 -1-6-0 1-6-0 7-2-12 7-2-12 14-5-8 7-2-12 0- 1 1 - 6 10 - 7 - 0 8.00 12 Plate Offsets (X,Y)-- [2:0-5-14,0-0-4], [4:0-3-0,0-3-4], [5:0-0-13,0-1-8], [6:0-1-8,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.52 0.29 0.28 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.06 -0.09 0.01 -0.07 (loc) 2-7 2-7 6 6-7 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 87 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std *Except* W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr SLIDER Left 2x6 DF 1800F 1.6E -t 4-5-2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-6, 4-6 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 6=722/0-5-8 (min. 0-1-8), 2=873/0-3-8 (min. 0-1-8) Max Horz2=283(LC 11) Max Uplift6=-91(LC 9), 2=-67(LC 12) Max Grav6=801(LC 17), 2=873(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-892/82, 3-4=-655/100, 4-5=-266/144, 5-6=-254/118 BOT CHORD 2-8=-216/639, 7-8=-216/639, 6-7=-217/636 WEBS 4-7=0/323, 4-6=-748/170 NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-7-0 to 1-5-0, Interior(1) 1-5-0 to 14-3-12 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 8.0psf. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 2. 5) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss M5 Truss Type Monopitch Structural Gable Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:20 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-yg6FKPYaaEiN1QVAVQ7hSmkuSepb5aP0QD095PzvSf5 Scale = 1:20.4 T1 W3 B1 W1 W2 ST3 ST4 ST2 ST1 1 2 3 4 6 5 15 16 7 3x4 3x4 3x4 6-3-8 6-3-8 7-2-12 0-11-4 8-5-8 1-2-12 11-3-10 2-10-2 -1-6-0 1-6-0 7-2-12 7-2-12 11-3-10 4-0-14 0- 3 - 1 4 3- 1 - 1 2 3.00 12 Plate Offsets (X,Y)-- [2:0-3-4,Edge], [10:0-1-13,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.49 0.23 0.15 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.04 -0.07 -0.00 0.01 (loc) 2-7 2-7 6 2-7 l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 49 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr WEBS 2x4 DF Stud/Std OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=384/0-3-8 (min. 0-1-8), 6=702/2-5-8 (min. 0-1-8), 7=181/0-3-8 (min. 0-1-8) Max Horz2=82(LC 9) Max Uplift2=-72(LC 8), 6=-138(LC 9) Max Grav2=384(LC 1), 6=702(LC 1), 7=221(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 3-15=-241/321 WEBS 3-6=-740/296, 3-5=-162/262 NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-6-7 to 1-5-9, Interior(1) 1-5-9 to 11-1-14 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) All plates are 2x4 MT20 unless otherwise indicated. 4) Gable studs spaced at 2-0-0 oc. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2 except (jt=lb) 6=138. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job B0043-21 Truss M6 Truss Type Roof Special Girder Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:22 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-u3E?l5Zq6rz5GjfZdrA9XBpBeSJFZNFJuXVG9IzvSf3 Scale = 1:25.6 T1 T2 W7 B1 W1 W2 W3 W4 W5 W6 1 2 3 4 5 6 11 9 8 7 12 13 10 4x4 2x4 4x4 3x8 3x4 2x4 4x4 3x4 3x4 4-11-3 4-11-3 6-0-0 1-0-13 8-1-6 2-1-6 11-3-10 3-2-3 12-5-8 1-1-14 -1-6-0 1-6-0 4-11-3 4-11-3 8-1-6 3-2-3 11-3-10 3-2-3 12-5-8 1-1-14 0- 3 - 1 4 3- 1 - 1 2 3- 1 1 - 0 3.00 12 8.00 12 Plate Offsets (X,Y)-- [2:0-11-4,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.70 0.92 0.64 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in 0.10 0.13 -0.01 -0.03 (loc) 2-11 2-11 9 2-11 l/defl >696 >549 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 69 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x6 DF 1800F 1.6E WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 4-8-11 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 6-5-8 except (jt=length) 2=0-3-8, 10=0-3-8. (lb) - Max Horz2=100(LC 25) Max Uplift All uplift 100 lb or less at joint(s) 7, 8, 10 except 2=-570(LC 19), 9=-401(LC 19) Max Grav All reactions 250 lb or less at joint(s) 8 except 7=307(LC 19), 2=397(LC 30), 9=427(LC 1), 10=355(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-278/754, 3-4=-713/183 BOT CHORD 2-12=-701/227, 12-13=-701/227, 11-13=-701/227, 10-11=-701/227, 9-10=-701/227, 8-9=-169/657 WEBS 3-11=-1120/142, 3-9=-381/1448, 4-9=-374/241, 4-8=-649/159, 5-7=-310/45 NOTES- 1) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 8, 10 except (jt=lb) 2=570, 9=401. 5) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 6) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 144 lb down and 1465 lb up at 2-1-8 , and 271 lb down and 367 lb up at 4-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 7) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-5=-86, 5-6=-86, 2-7=-16 Concentrated Loads (lb) Vert: 12=378(F) 13=-271(F) Job B0043-21 Truss PB01 Truss Type Piggyback Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:23 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-NFoNzRaSt95yutElAZhO3PMUwsrgIz?S7BFqhkzvSf2 Scale = 1:19.0 T1 T2 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 3x4 3x4 2x4 2x4 2x4 2x4 11-5-9 11-5-9 4-2-1 4-2-1 7-3-9 3-1-8 11-5-9 4-2-1 0- 4 - 7 2- 7 - 1 4 0- 1 - 8 0- 4 - 7 0- 1 - 8 2- 7 - 1 4 8.00 12 Plate Offsets (X,Y)-- [3:0-2-0,0-2-3], [5:0-2-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.16 0.14 0.03 DEFL. Vert(LL) Vert(CT) Horz(CT) in 0.01 0.01 0.00 (loc) 7 7 6 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 34 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except 2-0-0 oc purlins (6-0-0 max.): 3-5. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=425/9-11-11 (min. 0-1-8), 6=425/9-11-11 (min. 0-1-8), 8=241/9-11-11 (min. 0-1-8) Max Horz2=-41(LC 10) Max Uplift2=-55(LC 12), 6=-55(LC 12) Max Grav2=425(LC 1), 6=425(LC 1), 8=249(LC 24) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-9=-479/118, 3-9=-353/126, 3-4=-327/134, 4-5=-327/134, 5-10=-353/129, 6-10=-479/121 BOT CHORD 2-8=-52/327, 6-8=-52/327 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-3-11 to 3-3-11, Interior(1) 3-3-11 to 4-2-1, Exterior(2E) 4-2-1 to 11-1-14 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) Gable requires continuous bottom chord bearing. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 6. 8) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job B0043-21 Truss PB02 Truss Type Piggyback Qty 1 Ply 1 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:23 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-NFoNzRaSt95yutElAZhO3PMSysrFIywS7BFqhkzvSf2 Scale: 1/2"=1' T1 T1 B1 ST1 1 2 3 45 6 7 8 5x6 3x4 3x4 2x4 11-5-9 11-5-9 5-8-13 5-8-13 11-5-9 5-8-13 0- 4 - 7 3- 8 - 6 0- 1 - 8 0- 4 - 7 0- 1 - 8 8.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.28 0.17 0.10 DEFL. Vert(LL) Vert(CT) Horz(CT) in 0.01 0.01 0.00 (loc) 5 5 4 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 36 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=284/9-11-11 (min. 0-1-8), 4=284/9-11-11 (min. 0-1-8), 6=523/9-11-11 (min. 0-1-8) Max Horz2=-56(LC 10) Max Uplift2=-34(LC 12), 4=-34(LC 12), 6=-11(LC 12) Max Grav2=285(LC 23), 4=285(LC 24), 6=523(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 3-6=-376/86 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-3-11 to 3-3-11, Interior(1) 3-3-11 to 5-8-13, Exterior(2R) 5-8-13 to 8-8-13, Interior(1) 8-8-13 to 11-1-14 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 4, 6. 7) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. LOAD CASE(S) Standard Job B0043-21 Truss PB03 Truss Type Piggyback Qty 1 Ply 2 Blackstone D2 B5 L2(RP1/14) Job Reference (optional) Run: 8.410 s Jul 8 2020 Print: 8.410 s Jul 8 2020 MiTek Industries, Inc. Thu Jan 14 10:11:24 2021 Page 1 Snake River Truss & Components, Idaho Falls, ID 83401 ID:1Bd6gvBIHQPAm3vvgGTRnTzvUXI-rSMmAnb4eTDpW1pxkGCdccvfvFCp1Q6cLr_NEAzvSf1 Scale: 1/2"=1' T1 T1 B1 ST1 1 2 3 45 6 7 8 4x4 2x4 2x4 2x4 11-5-9 11-5-9 5-8-13 5-8-13 11-5-9 5-8-13 0- 4 - 7 3- 8 - 6 0- 1 - 8 0- 4 - 7 0- 1 - 8 8.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 35.0 8.0 0.0 * 8.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2018/TPI2014 CSI. TC BC WB Matrix-R 0.14 0.09 0.04 DEFL. Vert(LL) Vert(CT) Horz(CT) in 0.00 0.01 0.00 (loc) 5 5 4 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 72 lb FT = 0% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 2=284/9-11-11 (min. 0-1-8), 4=284/9-11-11 (min. 0-1-8), 6=523/9-11-11 (min. 0-1-8) Max Horz2=-56(LC 10) Max Uplift2=-34(LC 12), 4=-34(LC 12), 6=-11(LC 12) Max Grav2=285(LC 23), 4=285(LC 24), 6=523(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 3-6=-376/86 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-16; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp B; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-3-11 to 3-3-11, Interior(1) 3-3-11 to 5-8-13, Exterior(2R) 5-8-13 to 8-8-13, Interior(1) 8-8-13 to 11-1-14 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 5) Gable requires continuous bottom chord bearing. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 4, 6. 9) This truss is designed in accordance with the 2018 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 10) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. LOAD CASE(S) Standard