Loading...
HomeMy WebLinkAboutSTRUCTURAL CALCULATIONS - 21-00075 - Winder Station - New Commercial - Bldg BFROST Structural Engineering 1020 Lincoln Road Phone: 208.227.8404 Idaho Falls, ID 83401 Fax: 208.227.8405 www.frost-structural.com Project: Tom Luthy Metal Buildings - 60' x 125' Client: Titan Steel Project No.: IF20-467 Date: Engineer : SEAL: FSE January 14, 2021 January 14, 2021 STRUCTURAL CALCULATIONS DBP 1 of 18 <*> <*> <*> 60 ' - 0 " 125'-0" 1 2 6"24'-6"25'-0"25'-0"25'-0"24'-6"6" 3 4 A BL B C D BL 1 BL 2 3 4 5 6 BL REACTION KEY PLAN 1-A P= 2.20 U= 0.69 H= 0.96 1-C P= 13.43 U= 6.07 H= 2.23 1-B P= 10.52 U= 5.10 H= 1.91 2-A P= 29.49 U= 11.31 H= 17.30 2-D P= 30.17 U= 8.23 H= 17.30 3-A P= 29.78 U= 10.93 H= 17.47 3-D P= 30.46 U= 7.86 H= 17.47 4-A P= 29.72 U= 8.85 H= 17.09 4-D P= 30.33 U= 7.92 H= 17.09 5-A P= 29.43 U= 9.25 H= 16.92 5-D P= 30.03 U= 8.29 H= 16.92 1-D P= 5.11 U= 1.65 H= 1.13 D-2 P= 4.83 U= 3.79 H= 2.71 D-3 P= 4.83 U= 3.79 H= 2.74 1-A P= 2.20 U= 0.69 H= 0.96 1-C P= 13.43 U= 6.07 H= 2.47 1-B P= 10.52 U= 5.10 H= 1.91 1-D P= 5.11 U= 1.65 H= 1.13 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' BU I L D I N G M A R K : To m L u t h y 6 0 x 1 2 5 EN G I N E E R I N G P R O P E R T I E S : Al l o w a b l e B e a r i n g P r e s s u r e = Fr o s t D e p t h o r d e p t h o f F o o t i n g = So i l W e i g h t = Co n t i n u o u s F o o t i n g W i d t h = Pa s s i v e s o i l P r e s s u r e = Co n t i n u o u s F o o t i n g T h i c k n e s s = Fr i c t i o n C o e f f i c i e n t = Fo o t i n g S t e m W i d t h = Co n t r i b u t i n g S l a b / F o o t i n g L e n g t h = Sl a b T h i c k n e s s = Fy = S l a b R e i n f o r c e m e n t A r e a p e r F o o t = FO O T I N G D E S I G N : Gr i d l i n e s / N a m e Ve r t i c a l Fo r c e ( k i p s ) Up l i f t F o r c e (k i p s ) Ho r i z o n t a l Fo r c e - O u t (k i p s ) Co l u m n Lo c a t i o n Fo o t i n g Th i c k n e s s (i n ) Fo o t i n g Wi d t h ( f t ) Co l u m n De a d L o a d (k i p s ) Be a r i n g Pr o v i d e d (k i p s ) Re s i s t i n g Up l i f t ( k i p s ) Re s i s t i n g Ho r i z o n t a l Fo r c e ( k i p s ) B e a r i n g U p l i f t H o r i z o n t a l Ha i r p i n to b e Us e d ? Ha i r p i n Ba r S i z e Ha i r p i n An g l e (T y p i c a l l y 0 o r 6 0 ) Ha i r p i n Re q u i r e d Ba r A e a ( 1 le g ) Re q u i r e d Ha i r p i n L e g Le n g t h ( f t ) Sl a b A r e a Re q u i r e d f o r Ha i r p i n - N o Re b a r i n S l a b H a i r p i n 1- A 2. 2 0 . 7 1 . 0 E x t e r i o r C o r n e r 10 3 0. 2 2 13 . 5 6 . 6 2 . 8 ok o k o k 0. 0 2 G r a d e B e a m 0 . 0 0 1- B 10 . 5 5 . 1 1 . 9 E x t e r i o r W a l l 12 4 1. 0 5 24 . 0 1 0 . 4 3 . 6 ok o k o k 0. 0 4 G r a d e B e a m 0 . 0 0 1- C 13 . 4 6 . 1 2 . 2 E x t e r i o r W a l l 12 4 . 5 1. 3 4 30 . 4 1 2 . 0 4 . 1 ok o k o k 0. 0 5 G r a d e B e a m 0 . 0 0 1- D 5. 1 1 . 7 1 . 1 E x t e r i o r C o r n e r 10 3 0. 5 1 13 . 5 6 . 6 2 . 6 ok o k o k 0. 0 2 G r a d e B e a m 0 . 0 0 2- A 29 . 5 1 1 . 3 1 7 . 3 E x t e r i o r W a l l 12 6 2. 9 5 54 . 0 1 8 . 1 5 . 4 ok o k - Ye s 6 0. 3 6 G r a d e B e a m 1 3 1 2 . 9 6 ok 2- D 35 . 0 8 . 2 1 7 . 3 E x t e r i o r W a l l 12 5 . 5 3. 5 0 45 . 4 1 5 . 9 5 . 5 ok o k - Ye s 6 0. 3 6 G r a d e B e a m 1 3 0 6 . 0 6 ok 3- A 29 . 8 1 0 . 9 1 7 . 5 E x t e r i o r W a l l 12 6 2. 9 8 54 . 0 1 8 . 1 5 . 5 ok o k - Ye s 6 0. 3 6 G r a d e B e a m 1 3 2 2 . 7 3 ok 3- D 35 . 3 7 . 9 1 7 . 5 E x t e r i o r W a l l 12 5 . 5 3. 5 3 45 . 4 1 5 . 9 5 . 6 ok o k - Ye s 6 0. 3 6 G r a d e B e a m 1 3 1 5 . 9 9 ok 4- A 29 . 7 8 . 9 1 7 . 1 E x t e r i o r W a l l 12 5 . 5 2. 9 7 45 . 4 1 5 . 9 5 . 3 ok o k - Ye s 6 0. 3 6 G r a d e B e a m 1 3 0 4 . 2 7 ok 4- D 30 . 3 7 . 9 1 7 . 1 E x t e r i o r W a l l 12 5 . 5 3. 0 3 45 . 4 1 5 . 9 5 . 5 ok o k - Ye s 6 0. 3 6 G r a d e B e a m 1 2 8 8 . 4 1 ok 5- A 29 . 4 9 . 3 1 6 . 9 E x t e r i o r W a l l 12 5 . 5 2. 9 4 45 . 4 1 5 . 9 5 . 1 ok o k - Ye s 6 0. 3 5 G r a d e B e a m 1 2 9 4 . 8 1 ok 5- D 30 . 0 8 . 3 1 6 . 9 E x t e r i o r C o r n e r 12 5 . 5 3. 0 0 45 . 4 1 4 . 2 5 . 0 ok o k - Ye s 6 0. 3 5 G r a d e B e a m 1 3 0 6 . 0 5 ok 6- A 2. 2 0 . 7 1 . 0 E x t e r i o r W a l l 10 3 0. 2 2 13 . 5 7 . 6 3 . 1 ok o k o k 0. 0 2 G r a d e B e a m 0 . 0 0 6- B 10 . 5 5 . 1 1 . 9 E x t e r i o r W a l l 12 4 1. 0 5 24 . 0 1 0 . 4 3 . 6 ok o k o k 0. 0 4 G r a d e B e a m 0 . 0 0 6- C 13 . 4 6 . 1 2 . 5 E x t e r i o r W a l l 12 4 . 5 1. 3 4 30 . 4 1 2 . 0 4 . 1 ok o k o k 0. 0 5 G r a d e B e a m 0 . 0 0 6- D 5. 1 1 . 7 1 . 1 E x t e r i o r C o r n e r 10 3 0. 5 1 13 . 5 6 . 6 2 . 6 ok o k o k 0. 0 2 G r a d e B e a m 0 . 0 0 5' ' ME T A L B U I L D I N G F O U N D A T I O N D E S I G N 36 ' ' 15 0 0 p s f 8' ' 2. 5 ' 60 k s i 0. 0 0 0 i n ^ 2 / f t 0. 2 5 16 ' ' 10 ' ' 11 0 p c f 20 0 p s f / f t 2 o f 1 8 F R O S T S t r u c t u r a l E n g i n e e r i n g P r o j e c t N a m e : P r o j e c t N o . : E n g . : D a t e : S h e e t : D B P F S E 0 1 / 1 4 / 2 1 I F 2 0 - 4 6 7 T o m L u t h y M e t a l B u i l d i n g s - 6 0 ' x 1 2 5 ' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.22 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =1.99 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 3.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >14 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >3 OK q min (psf) =246 q max (psf) =246 OK qu-max (psf) =383 qu at edge of base (psf) =383 qu-min (psf) =383 qu at edge of base (psf) =383 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0001 Fy (psi) = 60000 Mu (k-ft) = 0.19 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 570 Use p =0.0001 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.10 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 1141 Use p =0.0001 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 1-A Use: w/ 1 #4 Top and Bottom 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 1-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 3 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.05 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =9.47 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 16.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >66 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >13 OK q min (psf) =658 q max (psf) =658 OK qu-max (psf) =1026 qu at edge of base (psf) =1026 qu-min (psf) =1026 qu at edge of base (psf) =1026 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.50 Bar size =#4 p =0.0003 Fy (psi) = 60000 Mu (k-ft) = 1.15 area of bar = 0.20 Min p =0.0004 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.03 Spacing (in) = 122 Use p =0.0004 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.8 OK Check Development Length L' short (ft) = 1.50 Bar size =#4 p =0.0001 Fy (psi) = 60000 Mu (k-ft) = 0.58 area of bar = 0.20 Min p =0.0002 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 245 Use p =0.0002 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.3 OK 1-B Use: w/ 1 #4 Top and Bottom 4.0 feet long x 4.0 feet wide x 12'' thick Footing Each Way 1-B Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 4 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.34 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =12.09 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 21.0 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >88 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >18 OK q min (psf) =663 q max (psf) =663 OK qu-max (psf) =1035 qu at edge of base (psf) =1035 qu-min (psf) =1035 qu at edge of base (psf) =1035 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.58 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 89 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0002 Fy (psi) = 60000 Mu (k-ft) = 0.79 area of bar = 0.20 Min p =0.0003 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.02 Spacing (in) = 178 Use p =0.0003 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 38.3 OK 1-C Use: w/ 2 #4 Top and Bottom 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 1-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 5 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.51 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =4.60 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 8.0 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >32 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >6 OK q min (psf) =568 q max (psf) =568 OK qu-max (psf) =886 qu at edge of base (psf) =886 qu-min (psf) =886 qu at edge of base (psf) =886 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0002 Fy (psi) = 60000 Mu (k-ft) = 0.44 area of bar = 0.20 Min p =0.0002 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 246 Use p =0.0002 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0001 Fy (psi) = 60000 Mu (k-ft) = 0.22 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 493 Use p =0.0001 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 1-D Use: w/ 1 #4 Top and Bottom 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 1-D Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 6 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.95 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =26.54 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 46.0 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =6 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =6 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >189 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >42 OK q min (psf) =819 q max (psf) =819 OK qu-max (psf) =1278 qu at edge of base (psf) =1278 qu-min (psf) =1278 qu at edge of base (psf) =1278 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.50 Bar size =#5 p =0.0010 Fy (psi) = 60000 Mu (k-ft) = 3.99 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.10 Spacing (in) = 54 Use p =0.0013 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.7 OK Check Development Length L' short (ft) = 2.50 Bar size =#5 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 2.00 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.05 Spacing (in) = 108 Use p =0.0007 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.1 OK 2-A Use: w/ 2 #5 Top and Bottom 6.0 feet long x 6.0 feet wide x 12'' thick Footing Each Way 2-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 7 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =3.50 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =31.50 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 54.6 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >230 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >49 OK q min (psf) =1157 q max (psf) =1157 OK qu-max (psf) =1805 qu at edge of base (psf) =1805 qu-min (psf) =1805 qu at edge of base (psf) =1805 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.25 Bar size =#5 p =0.0011 Fy (psi) = 60000 Mu (k-ft) = 4.57 area of bar = 0.31 Min p =0.0015 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.12 Spacing (in) = 47 Use p =0.0015 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK Check Development Length L' short (ft) = 2.25 Bar size =#5 p =0.0006 Fy (psi) = 60000 Mu (k-ft) = 2.28 area of bar = 0.31 Min p =0.0008 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.06 Spacing (in) = 95 Use p =0.0008 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK 2-D Use: w/ 2 #5 Top and Bottom 5.5 feet long x 5.5 feet wide x 12'' thick Footing Each Way 2-D Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 8 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.98 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =26.80 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 46.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =6 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =6 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >191 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >43 OK q min (psf) =827 q max (psf) =827 OK qu-max (psf) =1290 qu at edge of base (psf) =1290 qu-min (psf) =1290 qu at edge of base (psf) =1290 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.50 Bar size =#5 p =0.0010 Fy (psi) = 60000 Mu (k-ft) = 4.03 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.10 Spacing (in) = 53 Use p =0.0013 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.7 OK Check Development Length L' short (ft) = 2.50 Bar size =#5 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 2.02 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.05 Spacing (in) = 107 Use p =0.0007 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.1 OK 3-A Use: w/ 2 #5 Top and Bottom 6.0 feet long x 6.0 feet wide x 12'' thick Footing Each Way 3-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 9 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =3.53 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =31.76 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 55.1 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >231 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >50 OK q min (psf) =1167 q max (psf) =1167 OK qu-max (psf) =1820 qu at edge of base (psf) =1820 qu-min (psf) =1820 qu at edge of base (psf) =1820 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.25 Bar size =#5 p =0.0011 Fy (psi) = 60000 Mu (k-ft) = 4.61 area of bar = 0.31 Min p =0.0015 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.12 Spacing (in) = 47 Use p =0.0015 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK Check Development Length L' short (ft) = 2.25 Bar size =#5 p =0.0006 Fy (psi) = 60000 Mu (k-ft) = 2.30 area of bar = 0.31 Min p =0.0008 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.06 Spacing (in) = 94 Use p =0.0008 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK 3-D Use: w/ 2 #5 Top and Bottom 5.5 feet long x 5.5 feet wide x 12'' thick Footing Each Way 3-D Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 10 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.97 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =26.75 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 46.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >195 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >42 OK q min (psf) =982 q max (psf) =982 OK qu-max (psf) =1533 qu at edge of base (psf) =1533 qu-min (psf) =1533 qu at edge of base (psf) =1533 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000 Mu (k-ft) = 3.88 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.10 Spacing (in) = 55 Use p =0.0013 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK Check Development Length L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 1.94 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.05 Spacing (in) = 112 Use p =0.0007 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK 4-A Use: w/ 2 #5 Top and Bottom 5.5 feet long x 5.5 feet wide x 12'' thick Footing Each Way 4-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 11 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =3.03 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =27.30 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 47.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >199 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >43 OK q min (psf) =1003 q max (psf) =1003 OK qu-max (psf) =1564 qu at edge of base (psf) =1564 qu-min (psf) =1564 qu at edge of base (psf) =1564 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000 Mu (k-ft) = 3.96 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.10 Spacing (in) = 54 Use p =0.0013 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK Check Development Length L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 1.98 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.05 Spacing (in) = 109 Use p =0.0007 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK 4-D Use: w/ 2 #5 Top and Bottom 5.5 feet long x 5.5 feet wide x 12'' thick Footing Each Way 4-D Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 12 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.94 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =26.49 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 45.9 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >193 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >41 OK q min (psf) =973 q max (psf) =973 OK qu-max (psf) =1518 qu at edge of base (psf) =1518 qu-min (psf) =1518 qu at edge of base (psf) =1518 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000 Mu (k-ft) = 3.84 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.10 Spacing (in) = 56 Use p =0.0013 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK Check Development Length L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 1.92 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.05 Spacing (in) = 113 Use p =0.0007 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK 5-A Use: w/ 2 #5 Top and Bottom 5.5 feet long x 5.5 feet wide x 12'' thick Footing Each Way 5-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 13 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =3.00 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =27.03 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 46.8 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >197 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >42 OK q min (psf) =993 q max (psf) =993 OK qu-max (psf) =1549 qu at edge of base (psf) =1549 qu-min (psf) =1549 qu at edge of base (psf) =1549 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000 Mu (k-ft) = 3.92 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.10 Spacing (in) = 55 Use p =0.0013 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK Check Development Length L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 1.96 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.05 Spacing (in) = 111 Use p =0.0007 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK 5-D Use: w/ 2 #5 Top and Bottom 5.5 feet long x 5.5 feet wide x 12'' thick Footing Each Way 5-D Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 14 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.22 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =1.98 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 3.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >14 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >3 OK q min (psf) =244 q max (psf) =244 OK qu-max (psf) =381 qu at edge of base (psf) =381 qu-min (psf) =381 qu at edge of base (psf) =381 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0001 Fy (psi) = 60000 Mu (k-ft) = 0.19 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 573 Use p =0.0001 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.10 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 1146 Use p =0.0001 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 6-A Use: w/ 1 #4 Top and Bottom 6-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 15 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.05 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =9.47 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 16.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >66 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >13 OK q min (psf) =658 q max (psf) =658 OK qu-max (psf) =1026 qu at edge of base (psf) =1026 qu-min (psf) =1026 qu at edge of base (psf) =1026 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.50 Bar size =#4 p =0.0003 Fy (psi) = 60000 Mu (k-ft) = 1.15 area of bar = 0.20 Min p =0.0004 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.03 Spacing (in) = 122 Use p =0.0004 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.8 OK Check Development Length L' short (ft) = 1.50 Bar size =#4 p =0.0001 Fy (psi) = 60000 Mu (k-ft) = 0.58 area of bar = 0.20 Min p =0.0002 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 245 Use p =0.0002 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.3 OK 6-B Use: w/ 1 #4 Top and Bottom 6-B Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 4.0 feet long x 4.0 feet wide x 12'' thick Footing Each Way 16 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.34 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =12.09 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 21.0 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >88 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >18 OK q min (psf) =663 q max (psf) =663 OK qu-max (psf) =1035 qu at edge of base (psf) =1035 qu-min (psf) =1035 qu at edge of base (psf) =1035 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.58 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 89 Use p =0.0005 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK Check Development Length L' short (ft) = 1.75 Bar size =#4 p =0.0002 Fy (psi) = 60000 Mu (k-ft) = 0.79 area of bar = 0.20 Min p =0.0003 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.02 Spacing (in) = 178 Use p =0.0003 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 38.3 OK 6-C Use: w/ 2 #4 Top and Bottom 6-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 4.5 feet long x 4.5 feet wide x 12'' thick Footing Each Way 17 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125' Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.51 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =4.60 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 8.0 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >32 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >6 OK q min (psf) =568 q max (psf) =568 OK qu-max (psf) =886 qu at edge of base (psf) =886 qu-min (psf) =886 qu at edge of base (psf) =886 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0002 Fy (psi) = 60000 Mu (k-ft) = 0.44 area of bar = 0.20 Min p =0.0002 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 246 Use p =0.0002 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0001 Fy (psi) = 60000 Mu (k-ft) = 0.22 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 493 Use p =0.0001 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 6-D Use: w/ 1 #4 Top and Bottom 6-D Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 18 of 18 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 125'