HomeMy WebLinkAboutSTRUCTURAL CALCULATIONS - 21-00076 - Winder Station - New Commercial - Bldg AFROST Structural Engineering
1020 Lincoln Road Phone: 208.227.8404
Idaho Falls, ID 83401 Fax: 208.227.8405
www.frost-structural.com
Project: Tom Luthy Metal Buildings - 60' x 200'
Client: Titan Steel
Project No.: IF20-467
Date:
Engineer :
SEAL:
FSE
January 14, 2021
January 14, 2021
STRUCTURAL CALCULATIONS
DBP
1 of 24
<*>
<*><*>
<*>
6 0 '-0 "
200'-0"
1
2
6"24'-6"25'-0"25'-0"25'-0"25'-0"25'-0"25'-0"24'-6"6"
3
4
A B
L
B
C
D B L
1
BL
2 3 4 5 6 7 8 9
BL
REACTION KEY PLAN
1-D
P= 4.57
U= 1.62
H= 1.13
D-3
P= 2.30
U= 1.52
H= 1.19
D-4
P= 2.30
U= 1.52
H= 1.19
D-7
P= 2.30
U= 1.52
H= 1.19
D-8
P= 2.30
U= 1.52
H= 1.19
1-C
P= 13.29
U= 6.10
H= 2.48
1-B
P= 10.43
U= 5.06
H= 1.91
1-A
P= 2.21
U= 0.69
H= 0.97
9-D
P= 5.18
U= 1.65
H= 1.13
9-C
P= 13.42
U= 6.07
H= 2.47
9-B
P= 10.46
U= 5.09
H= 1.91
9-A
P= 2.24
U= 0.68
H= 0.96
2-D
P= 30.02
U= 8.31
H= 17.38
2-A
P= 29.42
U= 9.27
H= 17.38
3-D
P= 30.40
U= 7.90
H= 17.57
3-A
P= 29.70
U= 9.71
H= 17.57
4-D
P= 30.40
U= 7.90
H= 17.57
4-A
P= 29.70
U= 9.70
H= 17.57
5-D
P= 30.30
U= 7.94
H= 17.55
5-A
P= 29.71
U= 8.87
H= 17.55
6-D
P= 30.30
U= 7.94
H= 17.55
6-A
P= 29.71
U= 8.87
H= 17.55
7-D
P= 30.40
U= 7.90
H= 17.57
7-A
P= 29.70
U= 9.71
H= 17.57
8-D
P= 30.10
U= 8.27
H= 17.40
8-A
P= 29.41
U= 10.07
H= 17.40
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
BU
I
L
D
I
N
G
M
A
R
K
:
To
m
L
u
t
h
y
6
0
x
2
0
0
EN
G
I
N
E
E
R
I
N
G
P
R
O
P
E
R
T
I
E
S
:
Al
l
o
w
a
b
l
e
B
e
a
r
i
n
g
P
r
e
s
s
u
r
e
=
Fr
o
s
t
D
e
p
t
h
o
r
d
e
p
t
h
o
f
F
o
o
t
i
n
g
=
So
i
l
W
e
i
g
h
t
=
Co
n
t
i
n
u
o
u
s
F
o
o
t
i
n
g
W
i
d
t
h
=
Pa
s
s
i
v
e
s
o
i
l
P
r
e
s
s
u
r
e
=
Co
n
t
i
n
u
o
u
s
F
o
o
t
i
n
g
T
h
i
c
k
n
e
s
s
=
Fr
i
c
t
i
o
n
C
o
e
f
f
i
c
i
e
n
t
=
Fo
o
t
i
n
g
S
t
e
m
W
i
d
t
h
=
Co
n
t
r
i
b
u
t
i
n
g
S
l
a
b
/
F
o
o
t
i
n
g
L
e
n
g
t
h
=
Sl
a
b
T
h
i
c
k
n
e
s
s
=
Fy
=
S
l
a
b
R
e
i
n
f
o
r
c
e
m
e
n
t
A
r
e
a
p
e
r
F
o
o
t
=
FO
O
T
I
N
G
D
E
S
I
G
N
:
Gr
i
d
l
i
n
e
s
/
N
a
m
e
Ve
r
t
i
c
a
l
Fo
r
c
e
(
k
i
p
s
)
Up
l
i
f
t
F
o
r
c
e
(k
i
p
s
)
Ho
r
i
z
o
n
t
a
l
Fo
r
c
e
-
O
u
t
(k
i
p
s
)
Co
l
u
m
n
Lo
c
a
t
i
o
n
Fo
o
t
i
n
g
Th
i
c
k
n
e
s
s
(i
n
)
Fo
o
t
i
n
g
Wi
d
t
h
(
f
t
)
Co
l
u
m
n
De
a
d
L
o
a
d
(k
i
p
s
)
Be
a
r
i
n
g
Pr
o
v
i
d
e
d
(k
i
p
s
)
Re
s
i
s
t
i
n
g
Up
l
i
f
t
(
k
i
p
s
)
Re
s
i
s
t
i
n
g
Ho
r
i
z
o
n
t
a
l
Fo
r
c
e
(
k
i
p
s
)
B
e
a
r
i
n
g
U
p
l
i
f
t
H
o
r
i
z
o
n
t
a
l
Ha
i
r
p
i
n
to
b
e
Us
e
d
?
Ha
i
r
p
i
n
Ba
r
S
i
z
e
Ha
i
r
p
i
n
An
g
l
e
(T
y
p
i
c
a
l
l
y
0
o
r
6
0
)
Ha
i
r
p
i
n
Re
q
u
i
r
e
d
Ba
r
A
e
a
(
1
le
g
)
Re
q
u
i
r
e
d
Ha
i
r
p
i
n
L
e
g
Le
n
g
t
h
(
f
t
)
Sl
a
b
A
r
e
a
Re
q
u
i
r
e
d
f
o
r
Ha
i
r
p
i
n
-
N
o
Re
b
a
r
i
n
S
l
a
b
H
a
i
r
p
i
n
1-
A
2.
2
0
.
7
1
.
0
E
x
t
e
r
i
o
r
C
o
r
n
e
r
10
3
0.
2
2
13
.
5
6
.
6
2
.
8
ok
o
k
o
k
0.
0
2
G
r
a
d
e
B
e
a
m
0
.
0
0
1-
B
10
.
4
5
.
1
1
.
9
E
x
t
e
r
i
o
r
W
a
l
l
12
4
1.
0
4
24
.
0
1
0
.
4
3
.
6
ok
o
k
o
k
0.
0
4
G
r
a
d
e
B
e
a
m
0
.
0
0
1-
C
13
.
3
6
.
1
2
.
5
E
x
t
e
r
i
o
r
W
a
l
l
12
4
.
5
1.
3
3
30
.
4
1
2
.
0
4
.
1
ok
o
k
o
k
0.
0
5
G
r
a
d
e
B
e
a
m
0
.
0
0
1-
D
4.
6
1
.
6
1
.
1
E
x
t
e
r
i
o
r
C
o
r
n
e
r
10
3
0.
4
6
13
.
5
6
.
6
2
.
6
ok
o
k
o
k
0.
0
2
G
r
a
d
e
B
e
a
m
0
.
0
0
2-
A
29
.
4
9
.
3
1
7
.
4
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
2.
9
4
45
.
4
1
5
.
9
5
.
1
ok
o
k
-
Ye
s
6
0.
3
6
G
r
a
d
e
B
e
a
m
1
3
3
9
.
3
1
ok
2-
D
30
.
0
8
.
3
1
7
.
4
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
3.
0
0
45
.
4
1
5
.
9
5
.
4
ok
o
k
-
Ye
s
6
0.
3
6
G
r
a
d
e
B
e
a
m
1
3
2
2
.
9
9
ok
3-
A
29
.
7
9
.
7
1
7
.
6
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
2.
9
7
45
.
4
1
5
.
9
5
.
0
ok
o
k
-
Ye
s
6
0.
3
7
G
r
a
d
e
B
e
a
m
1
3
6
4
.
1
4
ok
3-
D
32
.
7
7
.
9
1
7
.
6
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
3.
2
7
45
.
4
1
5
.
9
5
.
6
ok
o
k
-
Ye
s
6
0.
3
7
G
r
a
d
e
B
e
a
m
1
3
3
0
.
3
8
ok
4-
A
29
.
7
9
.
7
1
7
.
6
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
2.
9
7
45
.
4
1
5
.
9
5
.
0
ok
o
k
-
Ye
s
6
0.
3
7
G
r
a
d
e
B
e
a
m
1
3
6
3
.
9
8
ok
4-
D
32
.
7
7
.
9
1
7
.
6
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
3.
2
7
45
.
4
1
5
.
9
5
.
6
ok
o
k
-
Ye
s
6
0.
3
7
G
r
a
d
e
B
e
a
m
1
3
3
0
.
3
8
ok
5-
A
29
.
7
8
.
9
1
7
.
6
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
2.
9
7
45
.
4
1
5
.
9
5
.
3
ok
o
k
-
Ye
s
6
0.
3
7
G
r
a
d
e
B
e
a
m
1
3
4
8
.
7
6
ok
5-
D
30
.
3
7
.
9
1
7
.
6
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
3.
0
3
45
.
4
1
5
.
9
5
.
5
ok
o
k
-
Ye
s
6
0.
3
7
G
r
a
d
e
B
e
a
m
1
3
3
2
.
9
4
ok
6-
A
29
.
7
8
.
9
1
7
.
6
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
2.
9
7
45
.
4
1
5
.
9
5
.
3
ok
o
k
-
Ye
s
6
0.
3
7
G
r
a
d
e
B
e
a
m
1
3
4
8
.
7
6
ok
6-
D
30
.
3
7
.
9
1
7
.
6
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
3.
0
3
45
.
4
1
5
.
9
5
.
5
ok
o
k
-
Ye
s
6
0.
3
7
G
r
a
d
e
B
e
a
m
1
3
3
2
.
9
4
ok
7-
A
29
.
7
9
.
7
1
7
.
6
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
2.
9
7
45
.
4
1
5
.
9
5
.
0
ok
o
k
-
Ye
s
6
0.
3
7
G
r
a
d
e
B
e
a
m
1
3
6
4
.
1
4
ok
7-
D
32
.
7
7
.
9
1
7
.
6
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
3.
2
7
45
.
4
1
5
.
9
5
.
6
ok
o
k
-
Ye
s
6
0.
3
7
G
r
a
d
e
B
e
a
m
1
3
3
0
.
3
8
ok
8-
A
29
.
4
1
0
.
1
1
7
.
4
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
2.
9
4
45
.
4
1
5
.
9
4
.
9
ok
o
k
-
Ye
s
6
0.
3
6
G
r
a
d
e
B
e
a
m
1
3
5
4
.
0
4
ok
8-
D
32
.
4
8
.
3
1
7
.
4
E
x
t
e
r
i
o
r
W
a
l
l
12
5
.
5
3.
2
4
45
.
4
1
5
.
9
5
.
5
ok
o
k
-
Ye
s
6
0.
3
6
G
r
a
d
e
B
e
a
m
1
3
2
0
.
4
6
ok
9-
A
2.
2
0
.
7
1
.
0
E
x
t
e
r
i
o
r
C
o
r
n
e
r
10
3
0.
2
2
13
.
5
6
.
6
2
.
8
ok
o
k
o
k
0.
0
2
G
r
a
d
e
B
e
a
m
0
.
0
0
9-
B
10
.
5
5
.
1
1
.
9
E
x
t
e
r
i
o
r
W
a
l
l
12
4
1.
0
5
24
.
0
1
0
.
4
3
.
6
ok
o
k
o
k
0.
0
4
G
r
a
d
e
B
e
a
m
0
.
0
0
9-
C
13
.
4
6
.
1
2
.
5
E
x
t
e
r
i
o
r
W
a
l
l
12
4
.
5
1.
3
4
30
.
4
1
2
.
0
4
.
1
ok
o
k
o
k
0.
0
5
G
r
a
d
e
B
e
a
m
0
.
0
0
9-
D
5.
2
1
.
7
1
.
1
E
x
t
e
r
i
o
r
C
o
r
n
e
r
10
3
0.
5
2
13
.
5
6
.
6
2
.
7
ok
o
k
o
k
0.
0
2
G
r
a
d
e
B
e
a
m
0
.
0
0
5'
'
ME
T
A
L
B
U
I
L
D
I
N
G
F
O
U
N
D
A
T
I
O
N
D
E
S
I
G
N
36
'
'
15
0
0
p
s
f
8'
'
2.
5
'
60
k
s
i
0.
0
0
0
i
n
^
2
/
f
t
0.
2
5
16
'
'
10
'
'
11
0
p
c
f
20
0
p
s
f
/
f
t
2
o
f
2
4
F
R
O
S
T
S
t
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
P
r
o
j
e
c
t
N
a
m
e
:
P
r
o
j
e
c
t
N
o
.
:
E
n
g
.
:
D
a
t
e
:
S
h
e
e
t
:
D
B
P
F
S
E
0
1
/
1
4
/
2
1
I
F
2
0
-
4
6
7
T
o
m
L
u
t
h
y
M
e
t
a
l
B
u
i
l
d
i
n
g
s
-
6
0
'
x
2
0
0
'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =0.22 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =1.99 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 3.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%574 >14 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:86 >3 OK
q min (psf) =246 q max (psf) =246 OK
qu-max (psf) =383 qu at edge of base (psf) =383
qu-min (psf) =383 qu at edge of base (psf) =383
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 1.00 Bar size =#4 p =0.0001 Fy (psi) = 60000
Mu (k-ft) = 0.19 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0
d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.01 Spacing (in) = 570 Use p =0.0001 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK
Check Development Length
L' short (ft) = 1.00 Bar size =#4 p =0.0000 Fy (psi) = 60000
Mu (k-ft) = 0.10 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0
d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.00 Spacing (in) = 1141 Use p =0.0001 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK
1-A Use:
w/ 1 #4 Top and Bottom
3.0 feet long x 3.0 feet wide x 10'' thick Footing
Each Way
1-A
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
3 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =1.04 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =9.39 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 16.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =4 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =4 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%744 >65 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:123 >13 OK
q min (psf) =652 q max (psf) =652 OK
qu-max (psf) =1017 qu at edge of base (psf) =1017
qu-min (psf) =1017 qu at edge of base (psf) =1017
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 1.50 Bar size =#4 p =0.0003 Fy (psi) = 60000
Mu (k-ft) = 1.14 area of bar = 0.20 Min p =0.0004 Ld1 (in) =24.0
d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.03 Spacing (in) = 123 Use p =0.0004 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.8 OK
Check Development Length
L' short (ft) = 1.50 Bar size =#4 p =0.0001 Fy (psi) = 60000
Mu (k-ft) = 0.57 area of bar = 0.20 Min p =0.0002 Ld1 (in) =24.0
d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.01 Spacing (in) = 247 Use p =0.0002 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.3 OK
1-B Use:
w/ 1 #4 Top and Bottom
4.0 feet long x 4.0 feet wide x 12'' thick Footing
Each Way
1-B
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
4 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =1.33 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =11.96 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 20.7 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%744 >87 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:123 >18 OK
q min (psf) =656 q max (psf) =656 OK
qu-max (psf) =1024 qu at edge of base (psf) =1024
qu-min (psf) =1024 qu at edge of base (psf) =1024
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000
Mu (k-ft) = 1.57 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0
d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.04 Spacing (in) = 90 Use p =0.0005 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK
Check Development Length
L' short (ft) = 1.75 Bar size =#4 p =0.0002 Fy (psi) = 60000
Mu (k-ft) = 0.78 area of bar = 0.20 Min p =0.0003 Ld1 (in) =24.0
d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.02 Spacing (in) = 180 Use p =0.0003 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 38.3 OK
1-C Use:
w/ 2 #4 Top and Bottom
4.5 feet long x 4.5 feet wide x 12'' thick Footing
Each Way
1-C
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
5 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =0.46 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =4.11 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 7.1 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%574 >29 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:86 >5 OK
q min (psf) =508 q max (psf) =508 OK
qu-max (psf) =792 qu at edge of base (psf) =792
qu-min (psf) =792 qu at edge of base (psf) =792
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 1.00 Bar size =#4 p =0.0002 Fy (psi) = 60000
Mu (k-ft) = 0.40 area of bar = 0.20 Min p =0.0002 Ld1 (in) =24.0
d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.01 Spacing (in) = 275 Use p =0.0002 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK
Check Development Length
L' short (ft) = 1.00 Bar size =#4 p =0.0001 Fy (psi) = 60000
Mu (k-ft) = 0.20 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0
d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.01 Spacing (in) = 552 Use p =0.0001 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK
1-D Use:
w/ 1 #4 Top and Bottom
3.0 feet long x 3.0 feet wide x 10'' thick Footing
Each Way
1-D
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
6 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =2.94 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =26.48 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 45.9 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >193 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >41 OK
q min (psf) =973 q max (psf) =973 OK
qu-max (psf) =1517 qu at edge of base (psf) =1517
qu-min (psf) =1517 qu at edge of base (psf) =1517
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000
Mu (k-ft) = 3.84 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.10 Spacing (in) = 56 Use p =0.0013 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000
Mu (k-ft) = 1.92 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.05 Spacing (in) = 113 Use p =0.0007 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
2-A Use:
w/ 2 #5 Top and Bottom
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
2-A
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
7 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =3.00 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =27.02 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 46.8 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >197 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >42 OK
q min (psf) =992 q max (psf) =992 OK
qu-max (psf) =1548 qu at edge of base (psf) =1548
qu-min (psf) =1548 qu at edge of base (psf) =1548
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000
Mu (k-ft) = 3.92 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.10 Spacing (in) = 55 Use p =0.0013 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000
Mu (k-ft) = 1.96 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.05 Spacing (in) = 111 Use p =0.0007 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
2-D Use:
w/ 2 #5 Top and Bottom
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
2-D
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
8 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =2.97 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =26.73 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 46.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >195 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >42 OK
q min (psf) =982 q max (psf) =982 OK
qu-max (psf) =1532 qu at edge of base (psf) =1532
qu-min (psf) =1532 qu at edge of base (psf) =1532
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000
Mu (k-ft) = 3.88 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.10 Spacing (in) = 56 Use p =0.0013 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000
Mu (k-ft) = 1.94 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.05 Spacing (in) = 112 Use p =0.0007 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
3-A Use:
w/ 2 #5 Top and Bottom
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
3-A
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
9 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =3.27 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =29.43 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 51.0 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >214 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >46 OK
q min (psf) =1081 q max (psf) =1081 OK
qu-max (psf) =1686 qu at edge of base (psf) =1686
qu-min (psf) =1686 qu at edge of base (psf) =1686
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0011 Fy (psi) = 60000
Mu (k-ft) = 4.27 area of bar = 0.31 Min p =0.0014 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.11 Spacing (in) = 50 Use p =0.0014 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0006 Fy (psi) = 60000
Mu (k-ft) = 2.13 area of bar = 0.31 Min p =0.0008 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.06 Spacing (in) = 101 Use p =0.0008 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
3-D Use:
w/ 2 #5 Top and Bottom
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
3-D
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
10 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =2.97 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =26.73 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 46.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >195 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >42 OK
q min (psf) =982 q max (psf) =982 OK
qu-max (psf) =1532 qu at edge of base (psf) =1532
qu-min (psf) =1532 qu at edge of base (psf) =1532
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000
Mu (k-ft) = 3.88 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.10 Spacing (in) = 56 Use p =0.0013 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000
Mu (k-ft) = 1.94 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.05 Spacing (in) = 112 Use p =0.0007 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
4-A Use:
w/ 2 #5 Top and Bottom
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
4-A
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
11 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =3.27 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =29.43 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 51.0 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >214 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >46 OK
q min (psf) =1081 q max (psf) =1081 OK
qu-max (psf) =1686 qu at edge of base (psf) =1686
qu-min (psf) =1686 qu at edge of base (psf) =1686
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0011 Fy (psi) = 60000
Mu (k-ft) = 4.27 area of bar = 0.31 Min p =0.0014 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.11 Spacing (in) = 50 Use p =0.0014 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0006 Fy (psi) = 60000
Mu (k-ft) = 2.13 area of bar = 0.31 Min p =0.0008 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.06 Spacing (in) = 101 Use p =0.0008 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
4-D Use:
w/ 2 #5 Top and Bottom
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
4-D
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
12 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =2.97 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =26.74 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 46.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >195 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >42 OK
q min (psf) =982 q max (psf) =982 OK
qu-max (psf) =1532 qu at edge of base (psf) =1532
qu-min (psf) =1532 qu at edge of base (psf) =1532
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000
Mu (k-ft) = 3.88 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.10 Spacing (in) = 55 Use p =0.0013 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000
Mu (k-ft) = 1.94 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.05 Spacing (in) = 112 Use p =0.0007 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
5-A Use:
w/ 2 #5 Top and Bottom
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
5-A
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
13 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =3.03 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =27.27 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 47.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >199 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >43 OK
q min (psf) =1002 q max (psf) =1002 OK
qu-max (psf) =1563 qu at edge of base (psf) =1563
qu-min (psf) =1563 qu at edge of base (psf) =1563
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000
Mu (k-ft) = 3.96 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.10 Spacing (in) = 54 Use p =0.0013 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000
Mu (k-ft) = 1.98 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.05 Spacing (in) = 110 Use p =0.0007 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
5-D Use:
w/ 2 #5 Top and Bottom
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
5-D
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
14 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =2.97 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =26.74 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 46.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >195 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >42 OK
q min (psf) =982 q max (psf) =982 OK
qu-max (psf) =1532 qu at edge of base (psf) =1532
qu-min (psf) =1532 qu at edge of base (psf) =1532
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000
Mu (k-ft) = 3.88 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.10 Spacing (in) = 55 Use p =0.0013 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000
Mu (k-ft) = 1.94 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.05 Spacing (in) = 112 Use p =0.0007 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
6-A Use:
w/ 2 #5 Top and Bottom
6-A
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
15 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =3.03 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =27.27 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 47.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >199 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >43 OK
q min (psf) =1002 q max (psf) =1002 OK
qu-max (psf) =1563 qu at edge of base (psf) =1563
qu-min (psf) =1563 qu at edge of base (psf) =1563
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000
Mu (k-ft) = 3.96 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.10 Spacing (in) = 54 Use p =0.0013 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000
Mu (k-ft) = 1.98 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.05 Spacing (in) = 110 Use p =0.0007 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
6-D Use:
w/ 2 #5 Top and Bottom
6-D
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
16 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =2.97 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =26.73 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 46.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >195 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >42 OK
q min (psf) =982 q max (psf) =982 OK
qu-max (psf) =1532 qu at edge of base (psf) =1532
qu-min (psf) =1532 qu at edge of base (psf) =1532
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000
Mu (k-ft) = 3.88 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.10 Spacing (in) = 56 Use p =0.0013 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000
Mu (k-ft) = 1.94 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.05 Spacing (in) = 112 Use p =0.0007 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
7-A Use:
w/ 2 #5 Top and Bottom
7-A
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
17 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =3.27 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =29.43 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 51.0 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >214 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >46 OK
q min (psf) =1081 q max (psf) =1081 OK
qu-max (psf) =1686 qu at edge of base (psf) =1686
qu-min (psf) =1686 qu at edge of base (psf) =1686
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0011 Fy (psi) = 60000
Mu (k-ft) = 4.27 area of bar = 0.31 Min p =0.0014 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.11 Spacing (in) = 50 Use p =0.0014 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0006 Fy (psi) = 60000
Mu (k-ft) = 2.13 area of bar = 0.31 Min p =0.0008 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.06 Spacing (in) = 101 Use p =0.0008 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
7-D Use:
w/ 2 #5 Top and Bottom
7-D
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
18 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =2.94 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =26.47 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 45.9 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >193 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >41 OK
q min (psf) =972 q max (psf) =972 OK
qu-max (psf) =1517 qu at edge of base (psf) =1517
qu-min (psf) =1517 qu at edge of base (psf) =1517
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0010 Fy (psi) = 60000
Mu (k-ft) = 3.84 area of bar = 0.31 Min p =0.0013 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.10 Spacing (in) = 56 Use p =0.0013 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0005 Fy (psi) = 60000
Mu (k-ft) = 1.92 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.05 Spacing (in) = 113 Use p =0.0007 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
8-A Use:
w/ 2 #5 Top and Bottom
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
8-A
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
19 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =3.24 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =29.16 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 50.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%738 >212 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:122 >46 OK
q min (psf) =1071 q max (psf) =1071 OK
qu-max (psf) =1671 qu at edge of base (psf) =1671
qu-min (psf) =1671 qu at edge of base (psf) =1671
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 2.25 Bar size =#5 p =0.0011 Fy (psi) = 60000
Mu (k-ft) = 4.23 area of bar = 0.31 Min p =0.0014 Ld1 (in) =30.0
d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.11 Spacing (in) = 51 Use p =0.0014 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK
Check Development Length
L' short (ft) = 2.25 Bar size =#5 p =0.0006 Fy (psi) = 60000
Mu (k-ft) = 2.11 area of bar = 0.31 Min p =0.0008 Ld1 (in) =30.0
d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15
As req(in^2/ft)= 0.05 Spacing (in) = 102 Use p =0.0008 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK
8-D Use:
w/ 2 #5 Top and Bottom
5.5 feet long x 5.5 feet wide x 12'' thick Footing
Each Way
8-D
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
20 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =0.22 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =2.02 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 3.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%574 >14 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:86 >3 OK
q min (psf) =249 q max (psf) =249 OK
qu-max (psf) =388 qu at edge of base (psf) =388
qu-min (psf) =388 qu at edge of base (psf) =388
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 1.00 Bar size =#4 p =0.0001 Fy (psi) = 60000
Mu (k-ft) = 0.19 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0
d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.01 Spacing (in) = 563 Use p =0.0001 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK
Check Development Length
L' short (ft) = 1.00 Bar size =#4 p =0.0000 Fy (psi) = 60000
Mu (k-ft) = 0.10 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0
d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.00 Spacing (in) = 1126 Use p =0.0001 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK
9-A Use:
w/ 1 #4 Top and Bottom
3.0 feet long x 3.0 feet wide x 10'' thick Footing
Each Way
9-A
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
21 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =1.05 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =9.41 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 16.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =4 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =4 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%744 >66 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:123 >13 OK
q min (psf) =654 q max (psf) =654 OK
qu-max (psf) =1020 qu at edge of base (psf) =1020
qu-min (psf) =1020 qu at edge of base (psf) =1020
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 1.50 Bar size =#4 p =0.0003 Fy (psi) = 60000
Mu (k-ft) = 1.15 area of bar = 0.20 Min p =0.0004 Ld1 (in) =24.0
d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.03 Spacing (in) = 123 Use p =0.0004 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.8 OK
Check Development Length
L' short (ft) = 1.50 Bar size =#4 p =0.0001 Fy (psi) = 60000
Mu (k-ft) = 0.57 area of bar = 0.20 Min p =0.0002 Ld1 (in) =24.0
d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.01 Spacing (in) = 247 Use p =0.0002 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.3 OK
9-B Use:
w/ 1 #4 Top and Bottom
4.0 feet long x 4.0 feet wide x 12'' thick Footing
Each Way
9-B
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
22 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =1.34 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =12.08 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 20.9 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =4.5 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =4.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%744 >88 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:123 >18 OK
q min (psf) =663 q max (psf) =663 OK
qu-max (psf) =1034 qu at edge of base (psf) =1034
qu-min (psf) =1034 qu at edge of base (psf) =1034
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 1.75 Bar size =#4 p =0.0004 Fy (psi) = 60000
Mu (k-ft) = 1.58 area of bar = 0.20 Min p =0.0005 Ld1 (in) =24.0
d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.04 Spacing (in) = 89 Use p =0.0005 Ld3 (in) =12
Total Bars = 2 Less than pmax, OK Available Ld (in) = 38.8 OK
Check Development Length
L' short (ft) = 1.75 Bar size =#4 p =0.0002 Fy (psi) = 60000
Mu (k-ft) = 0.79 area of bar = 0.20 Min p =0.0003 Ld1 (in) =24.0
d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.02 Spacing (in) = 179 Use p =0.0003 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 38.3 OK
9-C Use:
w/ 2 #4 Top and Bottom
4.5 feet long x 4.5 feet wide x 12'' thick Footing
Each Way
9-C
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
23 of 24
FROST Structural Engineering
Project Name:Project No. : Eng. : Date : Sheet :
DBP FSE01/14/21IF20-467Tom Luthy Metal Buildings - 60' x 200'
Concrete Pad Footing
Strength Design per ACI 318-11
Mark:
Material Data
P Self (k) = 0.00 M DL (k-ft) =0.00 Allowable q (psf) =1500
P DL (k) =0.52 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85
P LL (k) =4.66 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40
Pu (k) = 8.1 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60
e (ft) = 0.00
within middle 3rd
Footing Dimensions: Column/Pier Base: Shear Check:
Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170
Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85
Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in)
% in center band B=100%574 >33 OK
Punching Shear Resistance (k) > Applied Force (k)
Bearing Pressures:86 >6 OK
q min (psf) =576 q max (psf) =576 OK
qu-max (psf) =898 qu at edge of base (psf) =898
qu-min (psf) =898 qu at edge of base (psf) =898
Reinforcing:
Reinforcement Top and Bottom(Y/N) =Y
Base As(min) on calc'd As(4/3) (Y/N) =Y
Check Development Length
L' long (ft) = 1.00 Bar size =#4 p =0.0002 Fy (psi) = 60000
Mu (k-ft) = 0.45 area of bar = 0.20 Min p =0.0002 Ld1 (in) =24.0
d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.01 Spacing (in) = 243 Use p =0.0002 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK
Check Development Length
L' short (ft) = 1.00 Bar size =#4 p =0.0001 Fy (psi) = 60000
Mu (k-ft) = 0.22 area of bar = 0.20 Min p =0.0001 Ld1 (in) =24.0
d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12
As req(in^2/ft)= 0.01 Spacing (in) = 487 Use p =0.0001 Ld3 (in) =12
Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK
9-D Use:
w/ 1 #4 Top and Bottom
3.0 feet long x 3.0 feet wide x 10'' thick Footing
Each Way
9-D
Loads: (U = 1.2DL + 1.6LL)
Long Direction Check p
Short Direction Check p
24 of 24
FROST Structural Engineering