Loading...
HomeMy WebLinkAboutSTRUCTURAL INSPECTION - 20-00273 - Madison High School Field HouseProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: MHS Field House 20027 Madison School District Ultimate Steel Erection 12/21/2020 Cloudy 10:00 AM 38 2:00 PM I arrived on site and began my observations of the structural steel and bolting. My previous observations in October had noted that the contractor still had some work to do. Today I observed that the contractor had tightened the bolts to the snug tight position with a full 1/3 turn of the nut after. I observed that the faying surfaces were in contact with each other. I observed that the bolts and nuts were in place and in general conformance with the project documents. No deficiencies were observed at this time. Digitally signed by Jacob P Christensen Date: 2020.12.22 09:17:43 -07'00'8129697 ● J. Christensen Page 2 of 2 Description: Description: Description: Description: Additional Comments: