HomeMy WebLinkAboutSTRUCTURAL INSPECTION - 20-00273 - Madison High School Field HouseProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
MHS Field House
20027
Madison School District
Ultimate Steel Erection 12/21/2020
Cloudy
10:00 AM
38
2:00 PM
I arrived on site and began my observations of the structural steel and bolting. My previous observations in
October had noted that the contractor still had some work to do. Today I observed that the contractor had
tightened the bolts to the snug tight position with a full 1/3 turn of the nut after. I observed that the faying
surfaces were in contact with each other. I observed that the bolts and nuts were in place and in general
conformance with the project documents. No deficiencies were observed at this time.
Digitally signed by Jacob P Christensen
Date: 2020.12.22 09:17:43 -07'00'8129697
●
J. Christensen