Loading...
HomeMy WebLinkAboutCOMCHECK - 08-00232 - Taylor Chevrolet - Car Wash Additionr(, COMcheck Software Vers 0800232 Envelope COmpl Tavlor Chevrolet Car Wash Addition 2006 IECC Report Date: 04/23/08 Data filename: C:\Program Files\Check\COMcheck\Taylor Chevrolet.cck Section 1: Project Information Project Type: Addition Project Title : Taylor Chevrolet Construction Site: Owner/Agent: Designer/Contractor: 819 South Yellowstone Hwy. David Taylor Tri -Steel Construction Rexburg, ID 83440 Taylor Chevrolet 1305 S. 12th W. 819 South Yellowstone Hwy. Rexburg, ID 83440 Rexburg, ID 83440 208-356-6486 208-356-6600 tristeei@excite.com david@taylorchev.com n� r Section 2: General Information�� Building Location (for weather data): Rexburg, Idaho 2da� Climate Zone: 6b Heating Degree Days (base 65 degrees F): 8693 Cooling Degree Days (base 50 degrees F): 1446 t ��a Activity Tvne(s\ Floor Area J1 Workshop 2570 Section 3: Requirements Checklist Envelope PASSES: Design 14% better than code. Climate -Specific Requirements: Component Name/Description Gross Area Cavity Cont. Proposed Budget or Perimeter R -Value R -Value U -Factor U -Factor Roof 1: Metal Building, Screw Down 2570 32.0 28.0 0.028 0.065 Exterior Wall 1: Metal Building Wall 3867 19.0 16.0 0.033 0.057 Door 1: Insulated Metal, Non -Swinging 144 --- — 0.125 0.500 Door 2: Insulated Metal, Non -Swinging 144 --- — 0.125 0.500 Door 3: Insulated Metal, Non -Swinging 144 -- — 0.125 0.500 Door 4: Insulated Metal, Non -Swinging 144 -- -- 0.125 0.500 Door 5: Insulated Metal, Swinging 21 --- --- 0.500 0.700 Door 6: Insulated Metal, Swinging 21 --- -- 0.500 0.700 Floor 1: Slab -On -Grade: Unheated 2570 --- – --- --- (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements Air Leakage, Component Certification, and Vapor Retarder Requirements: F1 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance with the manufacturer's installation instructions. Q 2. Windows, doors, and skylights certified as meeting leakage requirements. Ej 3. Component R -values & U -factors labeled as certified. Fi 4. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R -value without compressing the insulation. Project Title: Taylor Chevrolet Report date: 04/23/08 Data filename: C:\Program Files\Check\COMcheck\Taylor Chevrolet.cck Page 1 of 11