HomeMy WebLinkAboutCOMCHECK - 08-00232 - Taylor Chevrolet - Car Wash Additionr(,
COMcheck Software Vers 0800232
Envelope COmpl Tavlor Chevrolet Car Wash Addition
2006 IECC
Report Date: 04/23/08
Data filename: C:\Program Files\Check\COMcheck\Taylor Chevrolet.cck
Section 1: Project Information
Project Type: Addition
Project Title : Taylor Chevrolet
Construction Site: Owner/Agent: Designer/Contractor:
819 South Yellowstone Hwy. David Taylor Tri -Steel Construction
Rexburg, ID 83440 Taylor Chevrolet 1305 S. 12th W.
819 South Yellowstone Hwy. Rexburg, ID 83440
Rexburg, ID 83440 208-356-6486
208-356-6600 tristeei@excite.com
david@taylorchev.com n�
r
Section 2: General Information��
Building Location (for weather data): Rexburg, Idaho 2da�
Climate Zone: 6b
Heating Degree Days (base 65 degrees F): 8693
Cooling Degree Days (base 50 degrees F): 1446 t ��a
Activity Tvne(s\ Floor Area J1
Workshop 2570
Section 3: Requirements Checklist
Envelope PASSES: Design 14% better than code.
Climate -Specific Requirements:
Component Name/Description Gross Area Cavity Cont. Proposed Budget
or Perimeter R -Value R -Value U -Factor U -Factor
Roof 1: Metal Building, Screw Down 2570 32.0 28.0 0.028 0.065
Exterior Wall 1: Metal Building Wall 3867 19.0 16.0 0.033 0.057
Door 1: Insulated Metal, Non -Swinging 144 --- — 0.125 0.500
Door 2: Insulated Metal, Non -Swinging 144 --- — 0.125 0.500
Door 3: Insulated Metal, Non -Swinging 144 -- — 0.125 0.500
Door 4: Insulated Metal, Non -Swinging 144 -- -- 0.125 0.500
Door 5: Insulated Metal, Swinging 21 --- --- 0.500 0.700
Door 6: Insulated Metal, Swinging 21 --- -- 0.500 0.700
Floor 1: Slab -On -Grade: Unheated 2570 --- – --- ---
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements
Air Leakage, Component Certification, and Vapor Retarder Requirements:
F1 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance
with the manufacturer's installation instructions.
Q 2. Windows, doors, and skylights certified as meeting leakage requirements.
Ej 3. Component R -values & U -factors labeled as certified.
Fi 4. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that
achieves the rated R -value without compressing the insulation.
Project Title: Taylor Chevrolet Report date: 04/23/08
Data filename: C:\Program Files\Check\COMcheck\Taylor Chevrolet.cck Page 1 of 11