Loading...
HomeMy WebLinkAboutSTRUCTURAL REPORT - 20-00936 - Cell tower - Antenna Addition Replacement520 South Main Street . Suite 2531 . Akron, Ohio 44311 . 330-572-2100 . Fax 330-572-2101 . www.GPDGroup.com GPD Group, Professional Corporation Phoenix Tower International Chad Burton 999 Yamato Road, Suite 100 520 South Main Street, Suite 2531 Boca Raton, FL 33431 Akron, OH 44311 (818) 486-8248 (614) 859-1623 cburton@gpdgroup.com GPD# 2019791.ID1000.03 October 7, 2020 COMPREHENSIVE STRUCTURAL ANALYSIS REPORT SITE DESIGNATION: PTI Site #: US-ID-1000 PTI Site Name: Rexburg T-Mobile Site #: SL01403D T-Mobile Site Name: Rexburg City ANALYSIS CRITERIA: Codes: TIA-222-H & 2018 IBC 105 mph (3-second gust) w/ 0" ice SITE DATA: 12 North Main Street, Rexburg, ID 83440, Madison County Latitude 43° 49' 37.39" N, Longitude 111° 46' 58.74" W 80' Nello Corporation Monopole Dear Kyle Hargrave, GPD is pleased to submit this Comprehensive Structural Analysis Report to determine the structural integrity of the aforementioned tower. The purpose of the analysis is to determine the suitability of the tower with the existing and proposed loading configuration detailed in the analysis report. Analysis Results Tower Stress Level with Proposed Equipment: 28.6% Pass Foundation Ratio with Proposed Equipment: 14.6% Pass We at GPD appreciate the opportunity of providing our continuing professional services to you and Phoenix Tower International. If you have any questions or need further assistance on this or any other projects, please do not hesitate to call. Respectfully submitted, Christopher J. Scheks, P.E. Idaho #: 16108 10/7/2020 80' Nello Corporation Monopole - Structural Evaluation Site #: US-ID-1000 10/7/2020 Page 2 of 4 SUMMARY & RESULTS The purpose of this analysis was to verify whether the existing structure is capable of carrying the proposed loading configuration as specified by T-Mobile and commissioned by Phoenix Tower International. This analysis has been performed in accordance with the 2018 International Building Code based upon a 3-second gust wind speed of 105 mph. Applicable Standard references and design criteria are listed in Appendices A & B. The proposed feedlines shall be installed as shown in Appendices A & B for the analysis results to be valid. TOWER SUMMARY AND RESULTS Member Capacity Results Monopole 27.6% Pass Anchor Rods 28.6% Pass Base Plate 21.3% Pass Foundation 14.6% Pass Note: Capacity ratings per TIA-222-H Section 15.5 RECOMMENDATIONS The tower and its foundation have sufficient capacity to carry the proposed loading configuration. No modifications are required at this time. ANALYSIS METHOD tnxTower (Version 8.0.7.5), a commercially available software program, was used to create a three-dimensional model of the tower and calculate primary member stresses for various load cases. Selected output from the analysis is included the report appendices. The following table details the information provided to complete this structural analysis. This analysis is based solely on this information. DOCUMENTS PROVIDED Document Remarks Source Collocation Application PTI T-Mobile Collocation Application, dated 09/24/2020 PTI Tower Design Nello Drawing #: 133760, dated 9/27/2010 PTI Foundation Design Nello Drawing #: 133761, dated 9/28/2010 PTI Geotechnical Report Terracon Project #: 62084032, dated 11/25/2008 PTI Previous Tower Analysis GPD #: 2018791.ID1000.02, dated 8/15/2018 PTI 80' Nello Corporation Monopole - Structural Evaluation Site #: US-ID-1000 10/7/2020 Page 3 of 4 ASSUMPTIONS This structural analysis is based on the theoretical capacity of the members and is not a condition assessment of the tower. This analysis is from information supplied, and therefore, its results are based on and are as accurate as that supplied data. GPD has made no independent determination, nor is it required to, of its accuracy. The following assumptions were made for this structural analysis. 1. The tower member sizes and shapes are considered accurate as supplied. The material grade is as per data supplied and/or as assumed and as stated in the materials section. 2. The appurtenance configuration is as supplied, determined from available photos, and/or as modeled in the analysis. It is assumed to be complete and accurate. All antennas, mounts, coax and waveguides are assumed to be properly installed and supported as per manufacturer requirements. 3. All mounts, if applicable, are considered adequate to support the loading. No actual analysis of the mount(s) is performed. This analysis is limited to analyzing the tower only. 4. The soil parameters are as per data supplied or as assumed and stated in the calculations. 5. Foundations are properly designed and constructed to resist the original design loads indicated in the documents provided. 6. The tower and structures have been properly maintained in accordance with TIA Standards and/or with manufacturer’s specifications. 7. All welds and connections are assumed to develop at least the member capacity unless determined otherwise and explicitly stated in this report. 8. All prior structural modifications, if applicable, are assumed to be as per data supplied/available and to have been properly installed. 9. Loading interpreted from photos is accurate to ±5’ AGL, antenna size accurate to ±3.3 sf, and coax equal to the number of existing antennas without reserve. 10. All existing and proposed loading has been taken from the available site photos as well as documents supplied to GPD at the time of generating this report. All such documents are listed in the Documents Provided Table and are assumed to be accurate. GPD is not responsible for loading scenarios outside those conveyed in the supplied documentation. If any of these assumptions are not valid or have been made in error, this analysis may be affected, and GPD should be allowed to review any new information to determine its effect on the structural integrity of the tower. 80' Nello Corporation Monopole - Structural Evaluation Site #: US-ID-1000 10/7/2020 Page 4 of 4 DISCLAIMER OF WARRANTIES GPD has not performed a site visit to the tower to verify the member sizes or antenna/coax loading. If the existing conditions are not as represented on the tower elevation contained in this report, we should be contacted immediately to evaluate the significance of the discrepancy. This is not a condition assessment of the tower or foundation. This report does not replace a full tower inspection. The tower and foundations are assumed to have been properly fabricated, erected, maintained, in good condition, twist free, and plumb. The engineering services rendered by GPD in connection with this Comprehensive Structural Analysis are limited to a computer analysis of the tower structure and theoretical capacity of its main structural members. No allowance was made for any damaged, bent, missing, loose, or rusted members (above and below ground). No allowance was made for loose bolts or cracked welds. This analysis is limited to the designated maximum wind and seismic conditions per the governing tower standards and code. Wind forces resulting in tower vibrations near the structure’s resonant frequencies were not considered in this analysis and are outside the scope of this analysis. Lateral loading from any dynamic response was not evaluated under a time- domain based fatigue analysis. GPD does not analyze the fabrication of the structure (including welding). It is not possible to have all the very detailed information needed to perform a thorough analysis of every structural sub-component and connection of an existing tower. GPD provides a limited scope of service in that we cannot verify the adequacy of every weld, plate connection detail, etc. The purpose of this report is to assess the capability of adding appurtenances usually accompanied by transmission lines to the structure. It is the owner’s responsibility to determine the amount of ice accumulation in excess of the code specified amount, if any, that should be considered in the structural analysis. The attached sketches are a schematic representation of the analyzed tower. If any material is fabricated from these sketches, the contractor shall be responsible for field verifying the existing conditions, proper fit, and clearance in the field. Any mentions of structural modifications are reasonable estimates and should not be used as a precise construction document. Precise modification drawings are obtainable from GPD, but are beyond the scope of this report. Miscellaneous items such as antenna mounts, etc., have not been designed or detailed as a part of our work. We recommend that material of adequate size and strength be purchased from a reputable tower manufacturer. Towers are designed to carry gravity, wind, and ice loads. All members, legs, diagonals, struts, and redundant members provide structural stability to the tower with little redundancy. Absence or removal of a member can trigger catastrophic failure unless a substitute is provided before any removal. Legs carry axial loads and derive their strength from shorter unbraced lengths by the presence of redundant members and their connection to the diagonals with bolts or welds. If the bolts or welds are removed without providing any substitute to the frame, the leg is subjected to a higher unbraced length that immediately reduces its load carrying capacity. If a diagonal is also removed in addition to the connection, the unbraced length of the leg is greatly increased, jeopardizing its load carrying capacity. Failure of one leg can result in a tower collapse because there is no redundancy. Redundant members and diagonals are critical to the stability of the tower. GPD makes no warranties, expressed and/or implied, in connection with this report and disclaims any liability arising from material, fabrication, and erection of this tower. GPD will not be responsible whatsoever for, or on account of, consequential or incidental damages sustained by any person, firm, or organization as a result of any data or conclusions contained in this report. The maximum liability of GPD pursuant to this report will be limited to the total fee received for preparation of this report. 80' Nello Corporation Monopole - Structural Evaluation Site #: US-ID-1000 10/7/2020 APPENDIX A Tower Analysis Summary Form To w e r A n a l y s i s S u m m a r y F o r m Ge n e r a l I n f o Sit e N a m e Sit e N u m b e r Da t e o f A n a l y s i s Co m p a n y P e r f o r m i n g A n a l y s i s To w e r I n f o D e s c r i p t i o n D a t e De s i g n P a r a m e t e r s An a l y s i s R e s u l t s ( % M a x i m u m U s a g e ) To w e r T y p e ( G , S S T , M P ) Ex i s t i n g / R e s e r v e d + F u t u r e + P r o p o s e d C o n d i t i o n To w e r H e i g h t ( t o p o f s t e e l A G L ) To w e r ( % ) To w e r M a n u f a c t u r e r Lo c a t i o n o f T o w e r ( C o u n t y , S t a t e ) To w e r B a s e ( % ) To w e r M o d e l No m i n a l W i n d S p e e d ( m p h ) Fo u n d a t i o n ( % ) To w e r D e s i g n 9/2 7 / 2 0 1 0 Ic e T h i c k n e s s ( i n ) Fo u n d a t i o n D e s i g n 9/2 8 / 2 0 1 0 Ris k C a t e g o r y ( I , I I , I I I ) Ge o t e c h R e p o r t 11 / 2 5 / 2 0 0 8 E x p o s u r e C a t e g o r y ( B , C , D ) Pr e v i o u s S t r u c t u r a l A n a l y s i s 8 / 1 5 / 2 0 1 8 T o p o g r a p h i c C a t e g o r y ( 1 t o 5 ) T- M o b i l e F u t u r e L o a d i n g I n f o r m a t i o n To w e r M a p p i n g Ex i s t i n g Area (i n 2 ) Mo d i f i c a t i o n D r a w i n g s Fin a l A r e a (in 2 ) Fu t u r e A r e a (in 2 ) Po l e 65 Ba s e P l a t e 50 A nc h o r R o d s 75 Ex i s t i n g / R e s e r v e d L o a d i n g An t e n n a Mo u n t T r a n s m i s s i o n L i n e An t e n n a O w n e r Mo u n t H e i g h t (ft ) An t e n n a C L (f t ) Qu a n t i t y T y p e M a n u f a c t u r e r M o d e l A z i m u t h Q u a n t i t y M a n u f a c t u r e r T y p e Q u a ntity M o d e l S i z e Attachment Int./Ext. Un k n o w n 8 0 8 7 2 O m n i T e l e w a v e A N T 7 7 0 F 6 1 U n k n o w n 6 ' M P 4 U n k n o w n 7 / 8 " I n t e r n al T-M o b i l e 8 0 8 0 3 P a n e l E r i c s s o n A I R 2 1 K R C 1 1 8 0 2 3 - 1 _ B 2 A _ B 4 P 3 0 / 1 7 0 / 2 7 0 3 Un k n o w n 6 ' T - A r m s 1 2 U n k n o w n 7 / 8 " I n t e r n a l T-M o b i l e 8 0 8 0 3 P a n e l E r i c s s o n A I R 3 2 K R D 9 0 1 0 4 4 - 1 _ B 4 A _ B 2 P 3 0 / 1 7 0 / 2 7 0 o n t h e s a m e m o u n t s 3 H y b r i d 1 - 3 / 8 " I n t e r n a l T-M o b i l e 8 0 8 0 3 P a n e l R F S A P X V A A R R 2 4 _ 4 3 - U - N A 2 0 3 0 / 1 7 0 / 2 7 0 o n t h e s a m e m o u n t s 1 H y b r i d 1 - 5 / 8 " I n t e r n a l T-M o b i l e 8 0 8 0 3 R R U E r i c s s o n R R U S 3 2 B 2 on t h e s a m e m o u n t s T-M o b i l e 8 0 8 0 3 R R U C o m m s c o p e R a d i o 4 4 4 9 B 7 1 B 1 2 o n t h e s a m e m o u n t s T-M o b i l e 8 0 8 0 3 R R U C o m m s c o p e R a d i o 4 4 1 5 B 6 6 A on t h e s a m e m o u n t s T-M o b i l e 8 0 8 0 3 T M A A l c a t e l L u c e n t T M A T 1 9 2 1 B 7 8 - 2 1 A o n t h e s a m e m o u n t s T-M o b i l e 4 5 4 5 1 D i s h A n d r e w 4 ' M W D i s h w / R a d o m e A s s u m e d 1 U n k n o w n D i s h Mo u n t 1 U n k n o w n 1 / 2 " I n t e r n a l No t e : ( 3 ) 6 ' T - A r m m o u n t s , ( 3 ) E r i c s s o n A I R 2 1 p a n e l s , ( 3 ) E r i c s s on R R U S 3 2 B 2 R R U s , & ( 3 ) T M A s a t 8 0 ' s h a l l b e r e m o v e d p r i o r t o th e i n s t a l l a t i o n o f t h e p r o p o s e d l o a d i n g a n d h a v e n o t b e e n c o n sid e r e d f o r t h i s a n a l y s i s . Pr o p o s e d L o a d i n g An t e n n a Mo u n t T r a n s m i s s i o n L i n e An t e n n a O w n e r Mo u n t H e i g h t (ft ) An t e n n a C L (f t ) Qu a n t i t y T y p e M a n u f a c t u r e r M o d e l A z i m u t h Q u a n t i t y M a n u f a c t u r e r T y p e Q u a ntity M o d e l S i z e Attachment Int./Ext. T-M o b i l e 7 8 . 5 8 0 3 P a n e l E r i c s s o n A I R 6 4 4 9 B 4 1 3 0 / 1 7 0 / 2 7 0 3 T a l l e y M P M - E N G- 0 7 - R 0 1 H y b r i d 1 - 3 / 8 " I n t e r n a l T-M o b i l e 7 8 . 5 8 0 3 P a n e l R F S A P X 1 7 D W V - 1 7 D W V - S - E - A 2 0 3 0 / 1 7 0 / 2 7 0 o n t h e s am e m o u n t s T-M o b i l e 7 8 . 5 8 0 3 R R U E r i c s s o n R a d i o 4 4 2 4 B 2 5 on t h e s a m e m o u n t s No t e : T h e p r o p o s e d e q u i p m e n t s h a l l b e i n s t a l l e d i n a d d i t i o n t o th e r e m a i n i n g e x i s t i n g / r e s e r v e d l o a d i n g a t t h e s a m e e l e v a t i o n . Re s e r v e d L o a d i n g An t e n n a Mo u n t T r a n s m i s s i o n L i n e An t e n n a O w n e r Mo u n t H e i g h t (ft ) An t e n n a C L (f t ) Qu a n t i t y Az i m u t h Q u a n t i t y M a n u f a c t u r e r T y p e Q u a n t i t y M o d e l S i z e Attachment Int./Ext. T-M o b i l e 8 0 8 0 1 in 2 R e m a i n i n g R e s e r v e d L o a d i n g on t h e e x i s t i n g m o u n t s No t e : T - M o b i l e ' s f i n a l l o a d i n g c o n f i g u r a t i o n u s e s 2 1 , 9 1 3 in 2 o f t h e i r M L A r e s e r v e d l o a d i n g . No87 Pr o p o s e d A r e a ( i n 2 )5,304 21,913 87 Re x b u r g C i t y US - I D - 1 0 0 0 Re x b u r g MP 80 ' Ne l l o C o r p o r a t i o n NT P 4 1 " x 8 0 ' Ne l l o D r a w i n g # : 1 3 3 7 6 0 Ty p e n/ a GP D Th e i n f o r m a t i o n c o n t a i n e d i n t h i s s u m m a r y r e p o r t i s n o t t o b e u se d i n d e p e n d e n t l y f r o m t h e P E st a m p e d t o w e r a n a l y sis . De s i g n C o d e U s e d TIA - 2 2 2 - H & 2 0 1 8 I B C Ma d i s o n , I D 27.6% 10 5 ( 3 - s e c o n d g u s t ) 0 Yes14.6% Fo u n d a t i o n A d e q u a t e ? 28.6% No t e : N o m i n a l e q u i p m e n t d i m e n s i o n s ( H e i g h t x W i d t h ) h a v e b e e n utilized for the purposes of these calculations. 1 Ne l l o D r a w i n g # : 1 3 3 7 6 1 Te r r a c o n P r o j e c t # : 6 2 0 8 4 0 3 2 GP D # : 2 0 1 8 7 9 1 . I D 1 0 0 0 . 0 2 II C n/ a If y e s , b y h o w m u c h ? ( i n 2 )n/a16,609 22,000 To t a l W i n d A r e a ( i n 2 ) Do e s T - M o b i l e ' s L o a d i n g Exceed 22,000 in 2 ? 80' Nello Corporation Monopole - Structural Evaluation Site #: US-ID-1000 10/7/2020 APPENDIX B Tower Analysis Output File GPD 520 South Main Street Suite 2531 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Job: US-ID-1000 Rexburg Project: 2019791.ID1000.03 Client: Phoenix Tower International Drawn by: EBoaz App'd: Code: TIA-222-H Date: 10/07/20 Scale: NTS Path: T:\PTI\US-ID-1000 (SL01403D)\03 2019791 ID1000 03 PTI TMO SA MA MMap\SA\tnx\US-ID-1000.eri Dwg No. E-1 80.0 ft 27.0 ft 0.0 ft REACTIONS - 105 mph WIND TORQUE 1 kip-ft 8 K SHEAR 474 kip-ft MOMENT 14 K AXIAL SEISMIC 3 K SHEAR 196 kip-ft MOMENT 15 K AXIAL ARE FACTORED ALL REACTIONS S e c t i o n 1 2 L e n g t h ( f t ) 53 . 0 0 31 . 7 5 N u m b e r o f S i d e s 18 18 T h i c k n e s s ( i n ) 0.1 8 7 5 0.2 5 0 0 S o c k e t L e n g t h ( f t ) 4.7 5 T o p D i a ( i n ) 25 . 9 5 0 0 35 . 2 1 7 4 B o t D i a ( i n ) 36 . 5 4 1 7 41 . 3 7 5 0 G r a d e A5 7 2 - 6 5 W e i g h t ( K ) 3. 3 3.3 6. 6 6' Lightning Rod 80 ANT770F6 80 2.375" x 6' mount pipe 80 ANT770F6 80 2.375" x 6' mount pipe 80 12' T-Arm - Round (GPD) 80 12' T-Arm - Round (GPD) 80 12' T-Arm - Round (GPD) 80 Appurtenances @ 80' 80 AIR32 KRD901044-1_B4A_B2P w/ Mount Pipe 78.5 AIR32 KRD901044-1_B4A_B2P w/ Mount Pipe 78.5 AIR32 KRD901044-1_B4A_B2P w/ Mount Pipe 78.5 APXVAARR24_43-U-NA20 w/ Mount Pipe 78.5 APXVAARR24_43-U-NA20 w/ Mount Pipe 78.5 APXVAARR24_43-U-NA20 w/ Mount Pipe 78.5 APX17DWV-17DWV-S-E-A20 w/ Mount Pipe 78.5 APX17DWV-17DWV-S-E-A20 w/ Mount Pipe 78.5 APX17DWV-17DWV-S-E-A20 w/ Mount Pipe 78.5 AIR6449 B41 w/ Mount Pipe 78.5 AIR6449 B41 w/ Mount Pipe 78.5 AIR6449 B41 w/ Mount Pipe 78.5 Radio 4449 B71+B12 78.5 Radio 4449 B71+B12 78.5 Radio 4449 B71+B12 78.5 Radio 4415 B66A 78.5 Radio 4415 B66A 78.5 Radio 4415 B66A 78.5 RADIO 4424 B25 78.5 RADIO 4424 B25 78.5 RADIO 4424 B25 78.5 TMO Reserved 78.5 TMO Reserved 78.5 TMO Reserved 78.5 Appurtenances @ 78.5' 78.5 12' T-Arm - Round (GPD) 77 12' T-Arm - Round (GPD) 77 12' T-Arm - Round (GPD) 77 Appurtenances @ 77' 77 Feedlines from 27' - 80' 53.5 Tower Section from 27' - 80' 53.5 Appurtenances @ 45' 45 4' MW 45 Dish Mount 45 Feedlines from 0' - 27' 13.5 Tower Section from 0' - 27' 13.5DESIGNED APPURTENANCE LOADING TYPE TYPEELEVATION ELEVATION 6' Lightning Rod 80 ANT770F6 80 2.375" x 6' mount pipe 80 ANT770F6 80 2.375" x 6' mount pipe 80 12' T-Arm - Round (GPD) 80 12' T-Arm - Round (GPD) 80 12' T-Arm - Round (GPD) 80 Appurtenances @ 80' 80 AIR32 KRD901044-1_B4A_B2P w/ Mount Pipe 78.5 AIR32 KRD901044-1_B4A_B2P w/ Mount Pipe 78.5 AIR32 KRD901044-1_B4A_B2P w/ Mount Pipe 78.5 APXVAARR24_43-U-NA20 w/ Mount Pipe 78.5 APXVAARR24_43-U-NA20 w/ Mount Pipe 78.5 APXVAARR24_43-U-NA20 w/ Mount Pipe 78.5 APX17DWV-17DWV-S-E-A20 w/ Mount Pipe 78.5 APX17DWV-17DWV-S-E-A20 w/ Mount Pipe 78.5 APX17DWV-17DWV-S-E-A20 w/ Mount Pipe 78.5 AIR6449 B41 w/ Mount Pipe 78.5 AIR6449 B41 w/ Mount Pipe 78.5 AIR6449 B41 w/ Mount Pipe 78.5 Radio 4449 B71+B12 78.5 Radio 4449 B71+B12 78.5 Radio 4449 B71+B12 78.5 Radio 4415 B66A 78.5 Radio 4415 B66A 78.5 Radio 4415 B66A 78.5 RADIO 4424 B25 78.5 RADIO 4424 B25 78.5 RADIO 4424 B25 78.5 TMO Reserved 78.5 TMO Reserved 78.5 TMO Reserved 78.5 Appurtenances @ 78.5' 78.5 12' T-Arm - Round (GPD) 77 12' T-Arm - Round (GPD) 77 12' T-Arm - Round (GPD) 77 Appurtenances @ 77' 77 Feedlines from 27' - 80' 53.5 Tower Section from 27' - 80' 53.5 Appurtenances @ 45' 45 4' MW 45 Dish Mount 45 Feedlines from 0' - 27' 13.5 Tower Section from 0' - 27' 13.5 MATERIAL STRENGTH GRADE GRADEFy FyFu Fu A572-65 65 ksi 80 ksi TOWER DESIGN NOTES 1. Tower is located in Madison County, Idaho. 2. Tower designed for Exposure C to the TIA-222-H Standard. 3. Tower designed for a 105 mph basic wind in accordance with the TIA-222-H Standard. 4. Deflections are based upon a 60 mph wind. 5. Tower Risk Category II. 6. Topographic Category 1 with Crest Height of 0.00 ft 7. TOWER RATING: 27.6% GPD 520 South Main Street Suite 2531 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Job: US-ID-1000 Rexburg Project: 2019791.ID1000.03 Client: Phoenix Tower International Drawn by: EBoaz App'd: Code: TIA-222-H Date: 10/07/20 Scale: NTS Path: T:\PTI\US-ID-1000 (SL01403D)\03 2019791 ID1000 03 PTI TMO SA MA MMap\SA\tnx\US-ID-1000.eri Dwg No. E-7 Feed Line Distribution Chart 0' - 80' Round Flat App In Face App Out Face Truss Leg Face A 27.00 0.00 80.00 El e v a t i o n ( f t ) Face B 8.008.00 3.003.003.003.003.00 45.00 Cli m b i n g P e g s Sa f e t y L i n e ( 3 / 8 " ) Face C 27.00 0.00 80.00 8.008.00 3.003.003.003.003.00 45.00 (4 ) L D F 5 - 5 0 A ( 7 / 8 F O A M ) (1 2 ) L D F 5 - 5 0 A ( 7 / 8 F O A M ) (4 ) 1 - 3 / 8 " H y b r i d C a b l e 1-5 / 8 " H y b r i d C a b l e LD F 4 - 5 0 A ( 1 / 2 F O A M ) GPD 520 South Main Street Suite 2531 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Job: US-ID-1000 Rexburg Project: 2019791.ID1000.03 Client: Phoenix Tower International Drawn by: EBoaz App'd: Code: TIA-222-H Date: 10/07/20 Scale: NTS Path: T:\PTI\US-ID-1000 (SL01403D)\03 2019791 ID1000 03 PTI TMO SA MA MMap\SA\tnx\US-ID-1000.eri Dwg No. E-7 Feed Line Plan Round Flat App In Face App Out Face (4) LDF5-50A (7/8 FOAM) (12) LDF5-50A (7/8 FOAM) (3) 1-3/8" Hybrid Cable (4) 1-3/8" Hybrid Cable 1-5/8" Hybrid CableLDF4-50A (1/2 FOAM) ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 1 of 8 GPD 520 South Main Street Suite 2531 Project 2019791.ID1000.03 Date 17:12:53 10/07/20 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by EBoaz Tower Input Data The tower is a monopole. This tower is designed using the TIA-222-H standard. The following design criteria apply: Tower is located in Madison County, Idaho. Tower base elevation above sea level: 4869.00 ft. Basic wind speed of 105 mph. Risk Category II. Exposure Category C. Simplified Topographic Factor Procedure for wind speed-up calculations is used. Topographic Category: 1. Crest Height: 0.00 ft. Deflections calculated using a wind speed of 60 mph. A non-linear (P-delta) analysis was used. Pressures are calculated at each section. Stress ratio used in pole design is 1.05. Local bending stresses due to climbing loads, feed line supports, and appurtenance mounts are not considered. Options Consider Moments - Legs Distribute Leg Loads As Uniform Use ASCE 10 X-Brace Ly Rules Consider Moments - Horizontals Assume Legs Pinned Calculate Redundant Bracing Forces Consider Moments - Diagonals √ Assume Rigid Index Plate Ignore Redundant Members in FEA Use Moment Magnification √ Use Clear Spans For Wind Area SR Leg Bolts Resist Compression Use Code Stress Ratios √ Use Clear Spans For KL/r All Leg Panels Have Same Allowable √ Use Code Safety Factors - Guys Retension Guys To Initial Tension Offset Girt At Foundation Escalate Ice √ Bypass Mast Stability Checks √ Consider Feed Line Torque Always Use Max Kz √ Use Azimuth Dish Coefficients Include Angle Block Shear Check Use Special Wind Profile √ Project Wind Area of Appurt. Use TIA-222-H Bracing Resist. Exemption Include Bolts In Member Capacity Autocalc Torque Arm Areas Use TIA-222-H Tension Splice Exemption Leg Bolts Are At Top Of Section Add IBC .6D+W Combination Poles Secondary Horizontal Braces Leg √ Sort Capacity Reports By Component √ Include Shear-Torsion Interaction Use Diamond Inner Bracing (4 Sided) Triangulate Diamond Inner Bracing Always Use Sub-Critical Flow SR Members Have Cut Ends Treat Feed Line Bundles As Cylinder Use Top Mounted Sockets SR Members Are Concentric Ignore KL/ry For 60 Deg. Angle Legs √ Pole Without Linear Attachments Pole With Shroud Or No Appurtenances Outside and Inside Corner Radii Are Known Tapered Pole Section Geometry Section Elevation ft Section Length ft Splice Length ft Number of Sides Top Diameter in Bottom Diameter in Wall Thickness in Bend Radius in Pole Grade L1 80.00-27.00 53.00 4.75 18 25.9500 36.5417 0.1875 0.7500 A572-65 (65 ksi) L2 27.00-0.00 31.75 18 35.2174 41.3750 0.2500 1.0000 A572-65 (65 ksi) ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 2 of 8 GPD 520 South Main Street Suite 2531 Project 2019791.ID1000.03 Date 17:12:53 10/07/20 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by EBoaz Tapered Pole Properties Section Tip Dia. in Area in2 I in4 r in C in I/C in3 J in4 It/Q in2 w in w/t L1 26.3214 15.3319 1285.6112 9.1457 13.1826 97.5233 2572.9141 7.6674 4.2372 22.598 37.0765 21.6353 3612.5130 12.9057 18.5632 194.6063 7229.7795 10.8197 6.1013 32.54 L2 36.6576 27.7467 4286.2357 12.4134 17.8905 239.5822 8578.1113 13.8760 5.7583 23.033 41.9747 32.6327 6972.7182 14.5994 21.0185 331.7420 13954.6113 16.3194 6.8420 27.368 Tower Elevation ft Gusset Area (per face) ft2 Gusset Thickness in Gusset Grade Adjust. Factor Af Adjust. Factor Ar Weight Mult. Double Angle Stitch Bolt Spacing Diagonals in Double Angle Stitch Bolt Spacing Horizontals in Double Angle Stitch Bolt Spacing Redundants in L1 80.00-27.00 1 1 1 L2 27.00-0.00 1 1 1 Feed Line/Linear Appurtenances - Entered As Round Or Flat Description Sector Exclude From Torque Calculation Component Type Placement ft Total Number Number Per Row Start/End Position Width or Diameter in Perimeter in Weight plf Climbing Pegs B No Surface Ar (CaAa) 80.00 - 8.00 1 1 0.000 0.000 0.1500 0.31 Feed Line/Linear Appurtenances - Entered As Area Description Face or Leg Allow Shield Exclude From Torque Calculation Component Type Placement ft Total Number CAAA ft2/ft Weight plf Safety Line (3/8'') B No No CaAa (Out Of Face) 80.00 - 8.00 1 No Ice 0.04 0.22 LDF5-50A (7/8 FOAM) C No No Inside Pole 80.00 - 3.00 4 No Ice 0.00 0.33 LDF5-50A (7/8 FOAM) C No No Inside Pole 80.00 - 3.00 12 No Ice 0.00 0.33 1-3/8'' Hybrid Cable C No No Inside Pole 80.00 - 3.00 4 No Ice 0.00 0.82 1-5/8'' Hybrid Cable C No No Inside Pole 80.00 - 3.00 1 No Ice 0.00 0.80 LDF4-50A (1/2 FOAM) C No No Inside Pole 45.00 - 3.00 1 No Ice 0.00 0.15 Feed Line/Linear Appurtenances Section Areas Tower Section Tower Elevation ft Face AR ft2 AF ft2 CAAA In Face ft2 CAAA Out Face ft2 Weight K L1 80.00-27.00 A B C 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.795 0.000 0.000 1.988 0.000 0.00 0.03 0.50 L2 27.00-0.00 A B C 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.285 0.000 0.000 0.713 0.000 0.00 0.01 0.23 ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 3 of 8 GPD 520 South Main Street Suite 2531 Project 2019791.ID1000.03 Date 17:12:53 10/07/20 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by EBoaz Feed Line Center of Pressure Section Elevation ft CPX in CPZ in CPX Ice in CPZ Ice in L1 80.00-27.00 0.4143 0.1021 0.2404 0.0592 L2 27.00-0.00 0.2895 0.0714 0.1671 0.0412 Note: For pole sections, center of pressure calculations do not consider feed line shielding. Shielding Factor Ka Tower Section Feed Line Record No. Description Feed Line Segment Elev. Ka No Ice Ka Ice L1 1 Climbing Pegs 27.00 - 80.00 1.0000 1.0000 L2 1 Climbing Pegs 8.00 - 27.00 1.0000 1.0000 User Defined Loads - Seismic Description Elevation ft Offset From Centroid ft Azimuth Angle ° Ev K Ehx K Ehz K Eh K Appurtenances @ 80' 80.00 0.00 0.0000 0.08 0.00 0.00 0.47 Appurtenances @ 78.5' 78.50 0.00 0.0000 0.16 0.00 0.00 0.89 Appurtenances @ 77' 77.00 0.00 0.0000 0.07 0.00 0.00 0.41 Appurtenances @ 45' 45.00 0.00 0.0000 0.01 0.00 0.00 0.02 Feedlines from 27' - 80' 53.50 0.00 0.0000 0.04 0.00 0.00 0.13 Feedlines from 0' - 27' 13.50 0.00 0.0000 0.02 0.00 0.00 0.01 Tower Section from 27' - 80' 53.50 0.00 0.0000 0.25 0.00 0.00 0.83 Tower Section from 0' - 27' 13.50 0.00 0.0000 0.24 0.00 0.00 0.12 Discrete Tower Loads Description Face or Leg Offset Type Offsets: Horz Lateral Vert ft ft ft Azimuth Adjustment ° Placement ft CAAA Front ft2 CAAA Side ft2 Weight K 6' Lightning Rod C From Leg 0.00 0.00 3.00 0.0000 80.00 No Ice 0.45 0.45 0.01 ANT770F6 A From Leg 0.50 0.0000 80.00 No Ice 1.21 1.21 0.02 ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 4 of 8 GPD 520 South Main Street Suite 2531 Project 2019791.ID1000.03 Date 17:12:53 10/07/20 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by EBoaz Description Face or Leg Offset Type Offsets: Horz Lateral Vert ft ft ft Azimuth Adjustment ° Placement ft CAAA Front ft2 CAAA Side ft2 Weight K 0.00 7.00 2.375'' x 6' mount pipe A From Leg 0.25 0.00 0.50 0.0000 80.00 No Ice 1.43 1.43 0.02 ANT770F6 C From Leg 0.50 0.00 7.00 0.0000 80.00 No Ice 1.21 1.21 0.02 2.375'' x 6' mount pipe C From Leg 0.25 0.00 0.50 0.0000 80.00 No Ice 1.43 1.43 0.02 12' T-Arm - Round (GPD) A From Leg 1.50 0.00 0.00 0.0000 80.00 No Ice 4.70 2.33 0.33 12' T-Arm - Round (GPD) B From Leg 1.50 0.00 0.00 0.0000 80.00 No Ice 4.70 2.33 0.33 12' T-Arm - Round (GPD) C From Leg 1.50 0.00 0.00 0.0000 80.00 No Ice 4.70 2.33 0.33 12' T-Arm - Round (GPD) A From Leg 1.50 0.00 0.00 0.0000 77.00 No Ice 4.70 2.33 0.33 12' T-Arm - Round (GPD) B From Leg 1.50 0.00 0.00 0.0000 77.00 No Ice 4.70 2.33 0.33 12' T-Arm - Round (GPD) C From Leg 1.50 0.00 0.00 0.0000 77.00 No Ice 4.70 2.33 0.33 AIR32 KRD901044-1_B4A_B2P w/ Mount Pipe A From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 6.63 6.31 0.14 AIR32 KRD901044-1_B4A_B2P w/ Mount Pipe B From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 6.63 6.31 0.14 AIR32 KRD901044-1_B4A_B2P w/ Mount Pipe C From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 6.63 6.31 0.14 APXVAARR24_43-U-NA20 w/ Mount Pipe A From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 20.24 10.79 0.16 APXVAARR24_43-U-NA20 w/ Mount Pipe B From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 20.24 10.79 0.16 APXVAARR24_43-U-NA20 w/ Mount Pipe C From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 20.24 10.79 0.16 APX17DWV-17DWV-S-E-A20 w/ Mount Pipe A From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 9.22 4.69 0.08 APX17DWV-17DWV-S-E-A20 w/ Mount Pipe B From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 9.22 4.69 0.08 APX17DWV-17DWV-S-E-A20 w/ Mount Pipe C From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 9.22 4.69 0.08 AIR6449 B41 w/ Mount Pipe A From Centroid-Leg 3.00 0.0000 78.50 No Ice 6.45 3.92 0.13 ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 5 of 8 GPD 520 South Main Street Suite 2531 Project 2019791.ID1000.03 Date 17:12:53 10/07/20 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by EBoaz Description Face or Leg Offset Type Offsets: Horz Lateral Vert ft ft ft Azimuth Adjustment ° Placement ft CAAA Front ft2 CAAA Side ft2 Weight K 0.00 1.50 AIR6449 B41 w/ Mount Pipe B From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 6.45 3.92 0.13 AIR6449 B41 w/ Mount Pipe C From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 6.45 3.92 0.13 Radio 4449 B71+B12 A From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 1.65 1.16 0.07 Radio 4449 B71+B12 B From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 1.65 1.16 0.07 Radio 4449 B71+B12 C From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 1.65 1.16 0.07 Radio 4415 B66A A From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 1.64 0.68 0.04 Radio 4415 B66A B From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 1.64 0.68 0.04 Radio 4415 B66A C From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 1.64 0.68 0.04 RADIO 4424 B25 A From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 1.86 1.32 0.09 RADIO 4424 B25 B From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 1.86 1.32 0.09 RADIO 4424 B25 C From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 1.86 1.32 0.09 TMO Reserved A From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 0.40 1.45 0.00 TMO Reserved B From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 0.40 1.45 0.00 TMO Reserved C From Centroid-Leg 3.00 0.00 1.50 0.0000 78.50 No Ice 0.40 1.45 0.00 Dish Mount C From Face 0.50 0.00 0.00 0.0000 45.00 No Ice 2.92 0.01 0.05 ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 6 of 8 GPD 520 South Main Street Suite 2531 Project 2019791.ID1000.03 Date 17:12:53 10/07/20 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by EBoaz Dishes Description Face or Leg Dish Type Offset Type Offsets: Horz Lateral Vert ft Azimuth Adjustment ° 3 dB Beam Width ° Elevation ft Outside Diameter ft Aperture Area ft2 Weight K 4' MW C Paraboloid w/Radome From Face 1.00 0.00 0.00 0.0000 45.00 4.00 No Ice 12.57 0.05 Load Combinations Comb. No. Description 1 Dead Only 2 1.2 Dead+1.0 Wind 0 deg - No Ice 3 0.9 Dead+1.0 Wind 0 deg - No Ice 4 1.2 Dead+1.0 Wind 30 deg - No Ice 5 0.9 Dead+1.0 Wind 30 deg - No Ice 6 1.2 Dead+1.0 Wind 60 deg - No Ice 7 0.9 Dead+1.0 Wind 60 deg - No Ice 8 1.2 Dead+1.0 Wind 90 deg - No Ice 9 0.9 Dead+1.0 Wind 90 deg - No Ice 10 1.2 Dead+1.0 Wind 120 deg - No Ice 11 0.9 Dead+1.0 Wind 120 deg - No Ice 12 1.2 Dead+1.0 Wind 150 deg - No Ice 13 0.9 Dead+1.0 Wind 150 deg - No Ice 14 1.2 Dead+1.0 Wind 180 deg - No Ice 15 0.9 Dead+1.0 Wind 180 deg - No Ice 16 1.2 Dead+1.0 Wind 210 deg - No Ice 17 0.9 Dead+1.0 Wind 210 deg - No Ice 18 1.2 Dead+1.0 Wind 240 deg - No Ice 19 0.9 Dead+1.0 Wind 240 deg - No Ice 20 1.2 Dead+1.0 Wind 270 deg - No Ice 21 0.9 Dead+1.0 Wind 270 deg - No Ice 22 1.2 Dead+1.0 Wind 300 deg - No Ice 23 0.9 Dead+1.0 Wind 300 deg - No Ice 24 1.2 Dead+1.0 Wind 330 deg - No Ice 25 0.9 Dead+1.0 Wind 330 deg - No Ice 26 Dead+Wind 0 deg - Service 27 Dead+Wind 30 deg - Service 28 Dead+Wind 60 deg - Service 29 Dead+Wind 90 deg - Service 30 Dead+Wind 120 deg - Service 31 Dead+Wind 150 deg - Service 32 Dead+Wind 180 deg - Service 33 Dead+Wind 210 deg - Service 34 Dead+Wind 240 deg - Service 35 Dead+Wind 270 deg - Service 36 Dead+Wind 300 deg - Service 37 Dead+Wind 330 deg - Service 38 1.2 Dead+1.0 Ev+1.0 Eh 0 deg 39 0.9 Dead-1.0 Ev+1.0 Eh 0 deg 40 1.2 Dead+1.0 Ev+1.0 Eh 30 deg 41 0.9 Dead-1.0 Ev+1.0 Eh 30 deg 42 1.2 Dead+1.0 Ev+1.0 Eh 60 deg 43 0.9 Dead-1.0 Ev+1.0 Eh 60 deg 44 1.2 Dead+1.0 Ev+1.0 Eh 90 deg 45 0.9 Dead-1.0 Ev+1.0 Eh 90 deg ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 7 of 8 GPD 520 South Main Street Suite 2531 Project 2019791.ID1000.03 Date 17:12:53 10/07/20 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by EBoaz Comb. No. Description 46 1.2 Dead+1.0 Ev+1.0 Eh 120 deg 47 0.9 Dead-1.0 Ev+1.0 Eh 120 deg 48 1.2 Dead+1.0 Ev+1.0 Eh 150 deg 49 0.9 Dead-1.0 Ev+1.0 Eh 150 deg 50 1.2 Dead+1.0 Ev+1.0 Eh 180 deg 51 0.9 Dead-1.0 Ev+1.0 Eh 180 deg 52 1.2 Dead+1.0 Ev+1.0 Eh 210 deg 53 0.9 Dead-1.0 Ev+1.0 Eh 210 deg 54 1.2 Dead+1.0 Ev+1.0 Eh 240 deg 55 0.9 Dead-1.0 Ev+1.0 Eh 240 deg 56 1.2 Dead+1.0 Ev+1.0 Eh 270 deg 57 0.9 Dead-1.0 Ev+1.0 Eh 270 deg 58 1.2 Dead+1.0 Ev+1.0 Eh 300 deg 59 0.9 Dead-1.0 Ev+1.0 Eh 300 deg 60 1.2 Dead+1.0 Ev+1.0 Eh 330 deg 61 0.9 Dead-1.0 Ev+1.0 Eh 330 deg Maximum Tower Deflections - Service Wind Section No. Elevation ft Horz. Deflection in Gov. Load Comb. Tilt ° Twist ° L1 80 - 27 3.321 26 0.3401 0.0006 L2 31.75 - 0 0.568 26 0.1576 0.0003 Critical Deflections and Radius of Curvature - Service Wind Elevation ft Appurtenance Gov. Load Comb. Deflection in Tilt ° Twist ° Radius of Curvature ft 80.00 6' Lightning Rod 26 3.321 0.3401 0.0006 78789 78.50 AIR32 KRD901044-1_B4A_B2P w/ Mount Pipe 26 3.218 0.3350 0.0005 78789 77.00 12' T-Arm - Round (GPD) 26 3.114 0.3299 0.0005 78789 53.50 Feedlines from 27' - 80' 26 1.590 0.2465 0.0004 14866 45.00 4' MW 26 1.128 0.2137 0.0004 11255 13.50 Feedlines from 0' - 27' 26 0.156 0.0696 0.0001 19201 Maximum Tower Deflections - Design Wind Section No. Elevation ft Horz. Deflection in Gov. Load Comb. Tilt ° Twist ° L1 80 - 27 11.415 2 1.1690 0.0019 L2 31.75 - 0 1.952 2 0.5418 0.0010 ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 8 of 8 GPD 520 South Main Street Suite 2531 Project 2019791.ID1000.03 Date 17:12:53 10/07/20 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by EBoaz Critical Deflections and Radius of Curvature - Design Wind Elevation ft Appurtenance Gov. Load Comb. Deflection in Tilt ° Twist ° Radius of Curvature ft 80.00 6' Lightning Rod 2 11.415 1.1690 0.0019 22948 78.50 AIR32 KRD901044-1_B4A_B2P w/ Mount Pipe 2 11.060 1.1514 0.0019 22948 77.00 12' T-Arm - Round (GPD) 2 10.705 1.1337 0.0019 22948 53.50 Feedlines from 27' - 80' 2 5.466 0.8473 0.0015 4329 45.00 4' MW 2 3.877 0.7344 0.0013 3277 13.50 Feedlines from 0' - 27' 2 0.535 0.2393 0.0005 5590 Section Capacity Table Section No. Elevation ft Component Type Size Critical Element P K øPallow K % Capacity Pass Fail L1 80 - 27 Pole TP36.5417x25.95x0.1875 1 -9.29 1257.23 27.6 Pass L2 27 - 0 Pole TP41.375x35.2174x0.25 2 -14.03 2004.46 27.4 Pass Summary ELC: Reserved Pole (L1) 27.6 Pass Rating = 27.6 Pass 80' Nello Corporation Monopole - Structural Evaluation Site #: US-ID-1000 10/7/2020 APPENDIX C Additional Calculations Anchor Rod and Base Plate Stresses, TIA-222-H-1 Overturning Moment = 474.00 k*ft Axial Force = 14.00 k 100% Shear Force = 8.00 k Yes Number of Rods = 6 Location = External Rod Yield Strength, Fy =75 ksi Plate Strength, Fy =50 ksi Rod Ultimate Strength, Fu =100 ksi φ =0.9 Rod Circle = 48.5 in Outside Diameter = 54.5 in Rod Diameter = 2.25 in Plate Thickness = 2.25 in Rod Projection, lar =0.75 in wcalc = 25.31 in Is grout present? No wmax = 22.50 in Max Tension on Rod, Put =75.77 k w = 22.50 in Max Compression on Rod, Puc =80.43 k Z = 28.48 in3 Shear on Rod, Vu =1.33 k Mu =286.55 k-in Moment on Rod, Mu =0.00 k-in φMn =1281.45 k-in Tension Interaction = 9.2% OK BP Capacity = 21.3% OK Compression Interaction = 28.6% OK Configuration = None Pole Diameter = 41.375 in Thickness = 1 in Number of Sides = 18 Width = 5 in Thickness = 0.25 in Notch = 0.5 in Pole Yield Strength = 65 ksi Height = 18 in Stiffener Strength (Fy) =36 ksi Clear Spacing b/w Stiffeners= 3 in Weld Info. Known? = No Vertical Weld Size = 0.3125 in Horiz. Weld Type = Both Groove Angle = 45 deg Groove Size = 0.375 in Fillet Size = 0.25 in Weld Strength = 70 ksi Stiffener Vertical Force = #VALUE!kips Vert. Weld Capacity =Not Verified Horiz. Weld Capacity =Not Verified Stiffener Capacity = #VALUE! Controlling Capacity = #VALUE! ###### GPD Round Base Plate Stress (Rev H) - V1.1 Stiffeners US-ID-1000 Rexburg 2019791.ID1000.03 Anchor Rods Base Plate Pole Apply TIA-222-H Section 15.5? Maximum Capacity T IA - 2 2 2 R e v i s o n : Ch e c k P i e r C a p a c i t y o n l y a t l o c a t i o n o f M a x M o m e n t ? N o To w e r T y pe : So i l   L a t e r a l   C h e c k Co m p r e s s i o n U p l i f t Co m p . U p l i f t 8. 0 5 - 47 4 1 3 . 1 1 - 14 5 3 4 . 4 7 - 8 9. 7 % - So i l   V e r t i c a l   C h e c k Co m p r e s s i o n U p l i f t Go to Soil Calculations 40 2 . 9 1 - 4 k s i 37 8 . 0 7 - 60 k s i 10 5 . 6 3 - 60 k s i 78 0 . 9 8 - 11 9 . 6 3 - 14 . 6 % - 24 f t Re i n f o r c e d   C o n c r e t e   F l e x u r e Co m p r e s s i o n U p l i f t 0. 5 f t 8. 0 1 - 53 4 . 4 7 - 53 9 5 . 0 4 - 6f t 9. 4 % - 27 41 Re i n f o r c e d   C o n c r e t e   S h e a r Co m p r e s s i o n U p l i f t 90 .0 0 - 3i n 8.0 0 - 4 43 7 . 3 0 - 8. 9 4 i n 1. 7 % - in *R a t i n g p e r T I A - 2 2 2 - H S e c t i o n 1 5 . 5 15 # o f L a y er s 4 12 1 FA L S E 1 0 5 5 1 1 0 1 5 0 0 0 0 . 0 0 0 0 . 0 0 0 0 . 0 0 0 . 0 0 FA L S E 2 5 7 2 1 1 5 1 5 0 3 1 0 . 0 0 0 0 . 0 0 0 0 . 7 5 0 . 5 3 FA L S E 3 7 1 5 8 1 1 5 1 5 0 3 5 0 . 0 0 0 0 . 0 0 0 1 . 3 5 0 . 9 8 FA L S E 4 1 5 2 4 9 6 3 8 7 . 6 3 5 0 . 0 0 0 0 . 0 0 0 1 . 8 0 1 . 3 5 1 5 9. 4 % St r u c t u r a l   F o u n d a t i o n   R a t i n g * To t a l   C a p a c i t y   ( k i p s ) Tie Y i e l d S t r e n g th , F y t: Ti e S p a c i n g Cr i t i c a l   D e p t h   ( f t   f r o m   T O C ) Cr i t i c a l   D e p t h   ( f t   f r o m   T O C ) 14 . 6 % So i l   I n t e r a c t i o n   R a t i n g * De p t h Ex t . A b o v e G r a d e Cr i t i c a l   M o m e n t   ( k i p ‐ f t ) Cr i t i c a l   M o m e n t   C a p a c i t y Ra t i n g * N/A Cohesionless Cohesionless Ul t i m a t e   S k i n   Fr i c t i o n   U p l i f t   Ov e r r i d e   ( k s f ) Sh e a r D e s i g n O p t i o n s Ch e c k S h e a r a l o n g Depth of Pier:N/A Cr i t i c a l   S h e a r   C a p a c i t y Ra t i n g * Cohesionless Cohesionless A na l y s i s R e s u l t s Dr i l l e d P i e r F o u n d a t i o n Si t e # : Si t e N a m e : GP D J o b Nu m b e r : Mo n o p o l e Ap p l i e d L o a d s Ma t e r i a l P r o p e r t i e s Pi e r D e s i g n D a t a H US - I D - 1 0 0 0 Re x b u r g 20 1 9 7 9 1 . I D 1 0 0 0 . 0 3 Mo m e n t (ki p - f t ) A xi a l F o r c e (ki p s ) Sh e a r F o r c e (ki p s ) Co n c r e t e S t r e n g th , f'c : D v= 0 (f t   f r o m   T O C ) So i l   S a f e t y   F a c t o r Ma x   M o m e n t   ( k i p ‐ f t ) Ra t i n g * Sk i n   F r i c t i o n   ( k i p s ) We i g h t   o f   C o n c r e t e   ( k i p s ) Ra t i n g * Ca l c u l a t e d   Ul t i m a t e   S k i n   Fr i c t i o n   U p l i f t       (k s f ) Ca l c u l a t e d   Ul t i m a t e   S k i n   Fr i c t i o n   C o m p     (k s f ) La y e r To p                 (f t ) Bo t t o m           (f t ) Th i c k n e s s       (f t ) Ul t i m a t e   S k i n   Fr i c t i o n   C o m p   Ov e r r i d e               (k s f ) Gr o u n d w a t e r D e p t h So i l P r o f i l e Soil TypeSPT Blow CountUlt. Net Bearing Capacity (ksf) γ so i l   (p c f ) γ co n c r e t e (p c f ) Co h e s i o n         (k s f ) An g l e   o f   Fr i c t i o n   (d e g r e e s ) Fr o m 0 . 5 ' a b o v e g r a d e t o 2 4 ' b e l o w g r a d e Re b a r S i z e Cl e a r C o v e r t o T i e s Ti e S i z e Re b a r Q u a n t i t y Re b a r C a g e D i a m e t e r Re b a r S t r e n g th , F y : En d   B e a r i n g   ( k i p s ) Ax i a l   ( k i p s ) Pi e r S e c t i o n 1 Check Limitation Ap p l y T I A - 2 2 2 - H S e c t i o n 1 5 . 5 : Pie r D i a m e t e r Re b a r Q u a n t i t y Re b a r S i z e Cr i t i c a l   S h e a r   ( k i p ) Re b a r & P i e r O p t i o n s Em b e d d e d P o l e I n p u t s Be l l e d P i e r I n p u t s Ve r s i o n 4 . 1 . 1 Analysis Method:Equivalent Lateral Force Procedure (Section 2.7.7.1, TIA-222-H) GPD Job Number 2019791.ID1000.03 Site Name Rexburg Site Number ID1000 City Rexburg State ID1000 County Madison Tower Type Monopole Base OD 41.375 in Top OD 25.95 in Base Thickness 0.25 in Top Thickness 0.1875 in # of Sides 18 Base Elevation 0 ft Structure Height (ft)80 TL 6 sec (Figures B-19 to B-21, TIA-222-H) Ss 0.369 (ASCE Hazard Tool) S1 0.221 (ASCE Hazard Tool) Site Classification D (Table 2-10, TIA-222-H) Risk Category II (Table 2-1, TIA-222-H) Importance Factor (I)1 (Table 2-3, TIA-222-H) Fa 1.505 (Table 2-11, TIA-222-H, interpolation allowed) Fv 2.158 (Table 2-12, TIA-222-H, interpolation allowed) SDS 0.370 (2.7.5, TIA-222-H) SD1 0.318 (2.7.5, TIA-222-H) Wt 11.660 Kips Wu 4.200 Kips WL 7.460 Kips g 386.4 in/s2 Iavg 4127.76 in4 E 29000 ksi Redundancy Factor (ρ)1.0 (2.7.7, TIA-222-H) f1 0.816 Hz (2.7.7.1.3, TIA-222-H) R 1.5 (2.7.7.1, TIA-222-H) Sam 0.260 (2.7.7.2.1, TIA-222-H) Earthquake LRFD Load Factor 1 (2.3.2, TIA-222-H) Discrete Appurtenances wz (kips)z (ft)Cvx Fsz Eh (k)Ev (k) Appurtenances @ 80'1.080 80 0.162 0.4651 0.465 0.080 Appurtenances @ 78.5'2.130 78.5 0.311 0.8939 0.894 0.158 Appurtenances @ 77'0.990 77 0.141 0.4047 0.405 0.073 Appurtenances @ 45'0.100 45 0.007 0.0197 0.020 0.007 Linear Appurtenances Feedlines from 27' - 80'0.530 53.5 0.046 0.1319 0.132 0.039 Feedlines from 0' - 27'0.240 13.5 0.003 0.0092 0.009 0.018 Structure Components Tower Section from 27' - 80'3.330 53.5 0.288 0.8289 0.829 0.247 Tower Section from 0' - 27'3.260 13.5 0.043 0.1243 0.124 0.241 Totals 11.660 2.88 0.863 2.88 kips Wind Base Shear (kip) 8.0 Seismic Base Shear (kip) 2.9 Seismic Calculations (TIA-222-H-1) Wind and Seismic Base Shear Comparison Base Shear per the Equivalent Lateral Force Procedure, Vs Anchor Rod and Base Plate Stresses, TIA-222-H-1 Overturning Moment = 196.00 k*ft Axial Force = 15.00 k 100% Shear Force = 3.00 k Yes Number of Rods = 6 Rod Yield Strength, Fy =75 ksi Rod Ultimate Strength, Fu =100 ksi Rod Circle =48.5 in Rod Diameter =2.25 in Rod Projection, lar =0.75 in Is grout present? No Max Tension on Rod, Put =29.80 k Max Compression on Rod, Puc =34.80 k Shear on Rod, Vu =0.50 k Moment on Rod, Mu =0.00 k-in Tension Interaction = 1.4% OK Compression Interaction = 12.3% OK Configuration =None Thickness =1 in Width =5 in Notch =0.5 in Height =18 in Stiffener Strength (Fy) =36 ksi Clear Spacing b/w Stiffeners= 3 in Weld Info. Known? = No Vertical Weld Size = 0.3125 in Horiz. Weld Type = Both Groove Angle = 45 deg Groove Size = 0.375 in Fillet Size = 0.25 in Weld Strength = 70 ksi Stiffener Vertical Force = #VALUE!kips Vert. Weld Capacity =Not Verified Horiz. Weld Capacity =Not Verified Stiffener Capacity = #VALUE! Controlling Capacity = #VALUE! ###### GPD Round Base Plate Stress (Rev H) - V1.1 Stiffeners US-ID-1000 Rexburg 2019791.ID1000.03 (seismic) Anchor Rods Apply TIA-222-H Section 15.5? Maximum Capacity Note: A 1.5 overstrength factor has been applied to the above reactions per TIA-222-H Section 2.7.9