HomeMy WebLinkAboutLID 50 EstimateLOCAL IMPROVEMENT DISTRICT 50
Item #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
LOCAL IMPROVEMENT DISTRICT 50
Item #
32
33
34
35
36
37
38
39
40
41
Item #
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
Item #
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
99
Park St
No.
No.
502
534
546
550
558
566
576
586
596
610
620
630
640
162
670
511
521
529
543
553
561
571
581
589
597
605
625
635
645
655
665
7th North
No.
No.
297
315
339
367
679
420
386
12th West Development
No.
23
Misc. Parcels
No.
314
50
40
136
138
146
160
376
150
5
328
338
Dir
Dir
W
W
W
W
W
W
W
W
W
W
W
W
W
S
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Dir
Dir
E
E
E
E
E
E
E
Dir
Dir
E
E
E
E
E
E
W
N
S
E
E
Street
Street
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Aries St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Street
Street
7th North
7th North
7th North
7th North
7th North
7th North
Stonebridge St
7th North
7th North
7th North
Street
Sawtelle Ave
Street
4th South
Mill Race
Mill Race
1st North
1st North
1st North
1st North
1st North
4th South
2nd West
3rd East
Main St
Main St
Cypress Loop
Cypress Loop
L Name
Company/ L Name
City of Rexburg
Bert & Terrie Flamm
Ladean Hilton
Jorge & Maria Hernandez
Brent & Theresa Ashcraft
Sandra Angell
Brandon & Ashley Sharon
Steven Christensen
Justin & Michelle Alexander
Traci Ann Maurino
Gary & Chimene Benson
Rebecca & Timothy Ng
Hung Ng Ying
Wren Clair Harrop
Kaylene Ross
Kevin & Carrie Shiley
Corde & Danielle Miller
Dawson & Ashlyn Bingham
Tiffany & Jeffrey Gibbons
Brian & Megan Dold
Salem & Rebecca El-Kher
Benjamin S Ashley
Alex & Brianna Scott
Karen & Bryce Anderson
Melvin & Doris Cook Living Trust
Ryan & Lisa Snelgrove
Kenneth England
Benjamin & Rachel Luthi
Light Enterprises LLC
Delaine & Lori Rydalch
Joseph & Ashley Anderson
L Name
Company/Name
City of Rexburg
City of Rexburg
Dorion Development Inc
David & Susan Salvesen
Dianna Theis
Spencer & Tara Parker
Darren P Clark
Rexburg Pacific Associates
Rexburg Urban Renewal Agency
Grover Dean R Family Bypass Trust
Company/Name
Joshua R Fullmer
Matthew M Griffeth
Matthew M Griffeth
Matthew M Griffeth
12TH WEST DEVELOPMENT LLC
12TH WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
Company/Name
Wesley & Madison Monasmith
Timothy Martindale
David Jacob
Keith & Joann Lewis
Bodrero Revocable Living Trust
Bodrero Revocable Living Trust
Turquoise Springs LLC
Turquoise Springs LLC
Daniel & Amanda Smith
Jay & Sephlin Hepworth
Allen & Juanita Miller
Raymond & Shanna Hill Trustee
Raymond & Shanna Hill Trustee
Pinebrook HOA
Pinebrook HOA
City of Rexburg
Utility Address
Utility Address
Utility Address
Utility Address
Utility City State Zip
Utility City State Zip
Utility City State Zip
Utility City State Zip
Mail Address- No
Mail Address- No
561 E 1st North
546 Park St
550 Park St
558 Park St
566 Park St
576 Park St
586 Park St
596 Park St
610 Park St
620 Park St
630 Park St
640 Park St
162 Aries St
670 Park St
511 Park St
521 Park St
89 N 4142 E
543 Park St
553 Park St
561 Park St
3908 W 2000 N
581 Park St
755 Tiebreaker Dr
597 Park St
605 Park St
625 Park St
635 Park St
75 Crestview Dr
655 Park St
665 Park St
Mail Address- No
Mail Address- No
732 Centennial Loop
315 E 7th North
339 E 7th North
367 E 7th North
679 Stonebridge St
430 E State St, Ste 100
299 E 4th North
386 E 7th North
Mail Address- No
PO BOX 6
1680 UTE BLVD STE #C
1680 UTE BLVD STE #C
1680 UTE BLVD STE #C
PO BOX 217
PO BOX 217
PO BOX 217
PO BOX 217
PO BOX 217
PO BOX 217
PO BOX 217
PO BOX 217
PO BOX 217
PO BOX 217
PO BOX 217
PO BOX 217
PO BOX 217
PO BOX 217
Mail Address- No
314 E 4th South
50 Mill Race Rd
40 Mill Race Rd
4344 E 500 N
368 E 170 S
368 E 170 S
368 E 170 S
368 E 170 S
16 Veraz Rd
407 S 3rd East
5 S 3rd East
328 E Main St
328 E Main St
1103 Greenside Loop
1103 Greenside Loop
Mail-City-state-zip
Mail-City-state-zip
St. Anthony, ID 83445
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rigby, ID 83442
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Ammon, ID 83406
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Mail-City-state-zip
Mail-City-state-zip
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Eagle, ID 83616
Rexburg, ID 83440
Rexburg, ID 83440
Mail-City-state-zip
Rexburg, ID 83440
Park City, UT 84098
Park City, UT 84098
Park City, UT 84098
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Mail-City-state-zip
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rigby, ID 83442
Ivins, UT 84738
Ivins, UT 84738
Ivins, UT 84738
Ivins, UT 84738
Rancho Mission Viejo, CA 9294
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Rexburg, ID 83440
Phone #
Phone #
Phone #
Phone #
Notes
Notes
Notes
Notes
Parcel #
RPR0PVA0010030
RPR0PVA0010040
RPR0PVA0010050
RPR0PVA0010060
RPR0PVA0010070
RPR0PVA0010080
RPR0PVA0010090
RPR0PVA0010100
RPR0PVA0010110
RPR0PVA0010120
RPRPVM10010130
RPRPVM10010140
RPRPVM10010150
RPRPVM10010160
RPRPVM10010170
RPRXBCA0251860
RPRXBCA0251854
RPRXBCA0251855
RPR0PVA0020010
RPR0PVA0020020
RPR0PVA0020030
RPR0PVA0020040
RPR0PVA0020050
RPR0PVA0020060
RPR0PVA0020070
RPR0PVA0020080
RPRPVM10020090
RPRPVM10020100
RPRPVM10020110
RPRPVM10020120
RPRPVM10020130
Parcel #
RPRXBCA0176492
RPRXBCA0176541
RPRXBCA0176392
RPRXBCA0176410
RPR6N40E176501
RPRXBCA0176310
RPRSTNB1010010
RPR4GVR0000020
RPRXBCA0202420
RPR4GVR0000010
Parcel #
RPR04RW0010010
RPR04RW0010020
RPR04RW0010030
RPR04RW0010040
RPR04RW0020010
RPR04RW0020020
RPR04RW0020030
RPR04RW0020040
RPR04RW0020050
RPR04RW0030010
RPR04RW0030020
RPR04RW0030030
RPR04RW0030040
RPR04RW0040010
RPR04RW0040020
RPR04RW0040030
RPR04RW0040040
RPR04RW0050010
Parcel #
RPR000S0050021
RPRHDVY6030010
RPRXBCA0290632
RPRRXB10340150
RPRRXB10340130
RPRRXB10340100
RPRRXB10340062
RPRRXB10340041
RPR000K0013990
RPR0000024002D
RPR000R0020190
RPR000R0020160
RPR000R0020130
RPRPNBK2070060
RPRPNBK2070070
Street Frontage Width (FT)
220
69
65
65
72
67
67
71
81
71
75
74
83
87
75
135
86
74
77
66
67
70
69
70
72
75
83
85
80
83
90
Street Frontage Width (FT)
196
62
102
118
170
130
106
180
178
803
Parcel Street Frontage Width (FT)
70
82
184
100
60
78
90
58
107
188
344
Total Driveway Width (FT)
0
30
31
17
15
10
17
16
20
14
22
18
12
0
10
39
20
22
19
34
20
17
20
12
30
22
20
10
18
20
10
Total Driveway Width (FT)
20
0
27
46
44
20
0
30
38
0
Total Driveway Width (FT)
22
0
34
0
10
14
40
0
0
Driveway and/or Apron Estimate (SY)
0
16.6666666666667
17.2222222222222
9.44444444444444
8.33333333333333
5.55555555555556
9.44444444444444
8.88888888888889
11.1111111111111
7.77777777777778
12.2222222222222
10
6.66666666666667
0
5.55555555555556
21.6666666666667
11.1111111111111
12.2222222222222
10.5555555555556
18.8888888888889
11.1111111111111
9.44444444444444
11.1111111111111
6.66666666666667
16.6666666666667
12.2222222222222
11.1111111111111
5.55555555555556
10
11.1111111111111
5.55555555555556
313.888888888889
Driveway and/or Apron Estimate (SY)
61.3333333333333
58.6666666666667
26.6666666666667
50.6666666666667
197.333333333333
Driveway and/or Apron Estimate (SY)
Driveway and/or Apron Estimate (SY)
7.77777777777778
10.8888888888889
31.1111111111111
4.89
21.67
12.22
New Reinforced Sidewalk (SQ YD)
New Reinforced Sidewalk (SQ YD)
26.6666666666667
36
40
102.666666666667
Reinforced Sidewalk (SQ YD)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
80.5555555555556
80.5555555555556
New Sidewalk (SY)
97.7777777777778
34.4444444444444
41.6666666666667
65.5555555555556
94.4444444444444
72.2222222222222
58.8888888888889
83.3333333333333
98.8888888888889
446.111111111111
1093.33333333333
New Sidewalk (SQ YD)
New Sidewalk (SY)
26.6666666666667
2.77777777777778
83.3333333333333
52.7777777777778
36.67
37.22
40
104.444444444444
191.111111111111
Replace Reinforced Sidewalk (SQ YD)
0
Replace Reinforced Sidewalk (SQ YD)
0
Reinforced Sidewalk (SQ YD)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
0
33.3333333333333
27.7777777777778
25
11.1111111111111
37.2222222222222
31.6666666666667
39.4444444444444
42.7777777777778
16.6666666666667
41.6666666666667
41.1111111111111
36.6666666666667
42.7777777777778
35
72.2222222222222
47.7777777777778
35.5555555555556
42.7777777777778
34.4444444444444
37.2222222222222
36.1111111111111
35.5555555555556
26.6666666666667
34.4444444444444
41.6666666666667
35.2777777777778
30
25.5555555555556
11.1111111111111
12.7777777777778
1021.38888888889
Replace Sidewalk (SY)
0
Replace Sidewalk (SQ YD)
Replace Sidewalk (SY)
0
0
55.5555555555556
33.3333333333333
43.3333333333333
50
32.2222222222222
37
71.33
12.33
6.11
New Reinforced C&G (Ft)
0
New Reinforced C&G (Ft)
20
27
30
77
New C & G (Ft)
New Reinforced C&G (Ft)
New C&G (Ft)
New C&G (Ft)
176
62
75
118
170
130
106
150
178
803
1968
New C & G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace Reinforced C&G (FT)
0
Replace C & G (Ft)
Replace Reinforced C&G (FT)
0
0
Replace C&G (Ft)
Actual
Estimate
90
0
65
45
25
67
67
51
35
48
75
40
49
45
35
90
50
74
77
47
62
60
69
70
72
75
63
59
20
60
65
1750
Replace C&G (FT)
Actual
Estimate
0
Reinforced C & G (FT)
Replace C&G (FT)
Existing Sidewalk (Eligible)
Sidewalk (SQ Yd. $78.00)
Removal of Concrete/ Asphalt Sidewalk (SQY)
7
0
233.3333
194.4444
175
77.7778
260.5556
221.6667
276.1111
299.4444
116.6667
291.6667
287.7778
256.6667
299.4444
245
505.5556
334.4444
248.8889
299.4444
241.1111
260.5556
252.7778
248.8889
186.6667
241.1111
291.6667
246.9444
210
178.8889
77.7778
89.4444
7149.7222
Existing Sidewalk (Eligible)
Sidewalk (SQ Yd. $78.00)
Removal of Concrete/ Asphalt Sidewalk (SQY)
7
0
0
0
0
0
0
0
0
0
0
0
Existing Sidewalk (Eligible)
Removal of Concrete/ Asphalt Sidewalk (SQY)
0
Existing Sidewalk (Eligible)
Removal of Concrete/ Asphalt Sidewalk (SQY)
0
0
0
388.8889
233.3333
303.3333
350
225.5556
0
259
499.31
86.31
42.77
0
0
6 " Excavation, Backfill, and Compaction (SQY)
20
0
666.6667
555.5556
500
222.2222
744.4444
633.3333
788.8889
855.5556
333.3333
833.3333
822.2222
733.3333
855.5556
700
1444.4444
955.5556
711.1111
855.5556
688.8889
744.4444
722.2222
711.1111
533.3333
688.8889
833.3333
705.5556
600
511.1111
222.2222
255.5556
20427.7778
6 " Excavation, Backfill, and Compaction (SQY)
20
0
0
0
0
0
0
0
0
0
0
0
6 " Excavation, Backfill, and Compaction (SQY)
0
6 " Excavation, Backfill, and Compaction (SQY)
0
0
0
1111.1111
666.6667
866.6667
1000
644.4444
0
740
1426.6
246.6
122.2
0
0
12" Excavation, Backfill, and Compaction (SQY)
25
0
12" Excavation, Backfill, and Compaction (SQY)
25
0
12" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
Concrete Installation (SQY)
55
0
1833.3333
1527.7778
1375
611.1111
2047.2222
1741.6667
2169.4444
2352.7778
916.6667
2291.6667
2261.1111
2016.6667
2352.7778
1925
3972.2222
2627.7778
1955.5556
2352.7778
1894.4444
2047.2222
1986.1111
1955.5556
1466.6667
1894.4444
2291.6667
1940.2778
1650
1405.5556
611.1111
702.7778
56176.3889
Concrete Installation (SQY)
55
0
0
0
0
0
0
0
0
0
0
0
Concrete Installation (SQY)
0
Concrete Installation (SQY)
0
0
0
3055.5556
1833.3333
2383.3333
2750
1772.2222
0
2035
3923.15
678.15
336.05
0
0
Reinforced Concrete Installation (SQY)
75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Reinforced Concrete Installation (SQY)
75
0
0
0
0
0
0
0
0
0
0
0
Reinforced Concrete Installation (SQY)
0
Reinforced Concrete Installation (SQY)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
New Sidewalk and Driveway (Not Eligible)
Sidewalk (SQ Yd. $78.00)
Removal of Concrete/ Asphalt Sidewalk (SQY)
7
0
116.6667
120.5556
66.1111
58.3333
38.8889
66.1111
62.2222
77.7778
54.4444
85.5556
70
46.6667
0
38.8889
151.6667
77.7778
85.5556
73.8889
132.2222
77.7778
66.1111
77.7778
46.6667
116.6667
85.5556
77.7778
38.8889
70
77.7778
38.8889
2197.2222
New Sidewalk and Driveway (Not Eligible)
Sidewalk (SQ Yd. $78.00)
Removal of Concrete/ Asphalt Sidewalk (SQY)
7
0
0
0
1533.3333
1466.6667
666.6667
0
0
1266.6667
0
4933.3333
New Sidewalk and Driveway (Not Eligible)
Removal of Concrete/ Asphalt Sidewalk (SQY)
0
New Sidewalk and Driveway (Not Eligible)
Removal of Concrete/ Asphalt Sidewalk (SQY)
186.6667
19.4444
583.3333
0
54.4444
76.2222
217.7778
0
369.4444
0
290.92
412.23
365.54
731.1111
1337.7778
6 " Excavation, Backfill, and Compaction (SQY)
20
0
333.3333
344.4444
188.8889
166.6667
111.1111
188.8889
177.7778
222.2222
155.5556
244.4444
200
133.3333
0
111.1111
433.3333
222.2222
244.4444
211.1111
377.7778
222.2222
188.8889
222.2222
133.3333
333.3333
244.4444
222.2222
111.1111
200
222.2222
1722.2222
7888.8889
6 " Excavation, Backfill, and Compaction (SQY)
20
2488.8889
688.8889
1553.3333
2537.7778
3062.2222
1977.7778
1177.7778
2466.6667
2991.1111
8922.2222
27866.6667
6 " Excavation, Backfill, and Compaction (SQY)
0
6 " Excavation, Backfill, and Compaction (SQY)
55.5556
1666.6667
0
155.5556
217.7778
622.2222
0
1055.5556
0
831.2
1177.8
1044.4
2088.8889
3822.2222
12" Excavation, Backfill, and Compaction (SQY)
25
0
12" Excavation, Backfill, and Compaction (SQY)
25
0
12" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
666.6667
Concrete Installation (SQY)
55
0
916.6667
947.2222
519.4444
458.3333
305.5556
519.4444
488.8889
611.1111
427.7778
672.2222
550
366.6667
0
305.5556
1191.6667
611.1111
672.2222
580.5556
1038.8889
611.1111
519.4444
611.1111
366.6667
916.6667
672.2222
611.1111
305.5556
550
611.1111
4736.1111
21694.4444
Concrete Installation (SQY)
55
5377.7778
1894.4444
2291.6667
6978.8889
8421.1111
5438.8889
3238.8889
4583.3333
8225.5556
24536.1111
70986.6667
Concrete Installation (SQY)
0
Concrete Installation (SQY)
1466.6667
152.7778
4583.3333
0
427.7778
598.8889
1711.1111
0
2902.7778
0
2285.8
3238.95
2872.1
5744.4444
10511.1111
Reinforced Concrete Installation (SQY)
75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Reinforced Concrete Installation (SQY)
75
2000
0
2700
0
0
0
0
3000
0
0
7700
Reinforced Concrete Installation (SQY)
0
Reinforced Concrete Installation (SQY)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Existing Curb & Gutter (Eligible)
Removal of Concrete Curb & Gutter (Foot)
5
450
0
325
225
125
335
335
255
175
240
375
200
245
225
175
450
250
370
385
235
310
300
345
350
360
375
315
295
100
300
325
8750
Existing Curb & Gutter (Eligible)
Removal of Concrete Curb & Gutter (Foot)
5
0
0
0
0
0
0
0
0
0
0
0
Existing Curb & Gutter (Eligible)
Removal of Concrete Curb & Gutter (Foot)
0
Existing Curb & Gutter (Eligible)
Removal of Concrete Curb & Gutter (Foot)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
12" Excavation, Backfill, and Compaction (LF)
5
Park St Curb Machine
450
0
325
225
125
335
335
255
175
240
375
200
245
225
175
450
250
370
385
235
310
300
345
350
360
375
315
295
100
300
325
8750
12" Excavation, Backfill, and Compaction (LF)
5
0
0
0
0
0
0
0
0
0
0
0
12" Excavation, Backfill, and Compaction (LF)
0
12" Excavation, Backfill, and Compaction (LF)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Concrete Installation (Foot)
35
25
2250
0
1625
1125
625
1675
1675
1275
875
1200
1875
1000
1225
1125
875
2250
1250
1850
1925
1175
1550
1500
1725
1750
1800
1875
1575
1475
500
1500
1625
43750
Concrete Installation (Foot)
35
0
0
0
0
0
0
0
0
0
0
0
Concrete Installation (Foot)
0
Concrete Installation (Foot)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Reinforced Concrete Installation (Foot)
40
Curb Mach
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Reinforced Concrete Installation (Foot)
40
0
0
0
0
0
0
0
0
0
0
0
Reinforced Concrete Installation (Foot)
0
Reinforced Concrete Installation (Foot)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
New Curb & Gutter (Not Eligible)
12" Excavation, Backfill, and Compaction (LF)
5
New Curb & Gutter (Not Eligible)
12" Excavation, Backfill, and Compaction (LF)
5
880
310
375
590
850
650
530
750
890
4015
9840
New Curb & Gutter (Not Eligible)
12" Excavation, Backfill, and Compaction (LF)
0
New Curb & Gutter (Not Eligible)
12" Excavation, Backfill, and Compaction (LF)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Concrete Installation (Foot)
25
Concrete Installation (Foot)
25
4400
1550
1875
2950
4250
3250
2650
3750
4450
20075
49200
Concrete Installation (Foot)
0
Concrete Installation (Foot)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Reinforced Concrete Installation (Foot)
40
Reinforced Concrete Installation (Foot)
40
800
0
1080
0
0
0
0
1200
0
0
3080
Reinforced Concrete Installation (Foot)
0
Reinforced Concrete Installation (Foot)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sanitary Sewer Service Reconnection
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
1700
52700
Sanitary Sewer Service Reconnection
1700
0
0
0
1700
1700
1700
0
0
0
0
5100
Water/Sanitary Sewer Service Reconnection
Water/Sanitary Sewer Service Reconnection
0
Landscaping/ Voluntary Amounts Added
886.3889
836.8519
975.5556
1064.7222
1064.7222
995.3704
1044.9074
1104.3519
1064.7222
1025.0926
1054.8148
1203.4259
1361.9444
1143.9815
1451.1111
1153.8889
1015.1852
1074.6296
817.037
965.6481
1025.0926
985.463
1074.6296
916.1111
1025.0926
1124.1667
1243.0556
1114.2593
1124.1667
1292.5926
32228.9815
Landscaping/ Voluntary Amounts Added
0
0
0
0
0
0
0
0
0
0
0
Landscaping/ Voluntary Amounts Added
Landscaping/ Voluntary Amounts Added
0
Street Reconstruction or Asphalt Patching
146.3594
73.1797
219.5391
Street Reconstruction or Asphalt Patching
90.625
0
122.3438
208.4375
199.375
90.625
0
135.9375
172.1875
0
1019.5312
Street Reconstruction
Street Reconstruction
Totals
Cost
4850
6686.3889
8501.8519
7075
5234.1667
8617.5
8411.4815
8493.2407
8448.2407
6449.1667
9768.9815
8345.9259
8171.7593
8144.7222
7394.537
14000
9432.7778
9222.963
9842.963
8681.7297
8798.9815
8633.8278
8927.1296
7957.963
9327.2222
9768.9815
8833.0556
7923.6111
6429.8148
6746.3889
12812.5926
261932.965
Cost
16037.2917
4443.3333
9997.3438
16498.4375
19949.375
13773.9583
7596.6667
15885.9375
17995.5208
57548.3333
179726.1979
Cost
45863.7196
66118.9416
60108.1374
148429.9238
135144.6576
153186.4936
48787.8992
48787.8992
48787.8992
65153.5466
111651.1144
23444.2956
23444.2956
73770.753
27403.1306
27403.1306
27403.1306
27403.1518
Cost
2320
227.7778
6833.3333
4555.5556
3371.1111
4446.2222
6651.1111
2642.2222
4327.7778
3034
9256.98
5840.04
4783.06
8564.4444
15671.1111
1707879.19
3394355.2196
Engineering
0.12
582
802.3667
1020.2222
849
628.1
1034.1
1009.3778
1019.1889
1013.7889
773.9
1172.2778
1001.5111
980.6111
977.3667
887.3444
1680
1131.9333
1106.7556
1181.1556
1041.8076
1055.8778
1036.0593
1071.2556
954.9556
1119.2667
1172.2778
1059.9667
950.8333
771.5778
809.5667
1537.5111
31431.9558
Engineering
0.12
1924.475
533.2
1199.6812
1979.8125
2393.925
1652.875
911.6
1906.3125
2159.4625
6905.8
21567.1437
Engineering
Engineering
278.4
27.3333
820
546.6667
404.5333
533.5467
798.1333
317.0667
519.3333
364.08
1110.8376
700.8048
573.9672
1027.7333
1880.5333
204945.5028
267847.5719
City Participation (50% of Replaced SW C&G, excludes new and driveway)
5432
1366.6667
2276.3889
1812.5
893.0556
2698.6111
2470.8333
2509.7222
2366.3889
1523.3333
3020.8333
2385.5556
2360.8333
2541.3889
2047.5
4536.1111
2833.8889
2752.7778
3101.3889
2234.7222
2611.1111
2530.5556
2665.2778
2318.3333
2672.2222
3020.8333
2548.8889
2262.5
1397.7778
1505.5556
1661.3889
76358.9444
City Participation (30% of Replaced SW C&G, excludes new and driveway)
17961.7667
4976.5333
0
18478.25
22343.3
15426.8333
8508.2667
0
0
87694.95
City Participation
City Participation
0
0
0
1366.6667
820
1066
1230
792.6667
0
910.2
1754.718
303.318
150.306
0
0
1912824.6928
2085272.4626
CITY SHARE
PROPERTY OWNER SHARE
TOTAL ESTIMATED COST
Property Owner Cost
0
6122.09
7245.69
6111.5
4969.22
6952.99
6950.03
7002.71
7095.65
5699.74
7920.43
6961.89
6791.54
6580.7
6234.39
11143.89
7730.83
7576.95
7922.73
7488.82
7243.75
7139.34
7333.11
6594.59
7774.27
7920.43
7344.14
6611.95
5803.62
6050.4
12688.72
217006.11
Property Owner Cost
0
0
11197.03
0
0
0
0
17792.25
20154.99
64454.14
113598.41
Property Owner Cost
45863.7196
66118.9416
60108.1374
148429.9238
135144.6576
153186.4936
48787.8992
48787.8992
48787.8992
65153.5466
111651.1144
23444.2956
23444.2956
73770.753
27403.1306
27403.1306
27403.1306
27403.1518
1162292.12
Property Owner Cost
2598.4
255.12
7653.34
3735.56
2955.65
3913.77
6219.25
2166.63
4847.12
2487.88
8613.1
6237.53
5206.73
9592.18
17551.65
0
1576930.55
2085300
1576900
3662200
10 Year Payment
0
612.209
724.569
611.15
496.922
695.299
695.003
700.271
709.565
569.974
792.043
696.189
679.154
658.07
623.439
1114.389
773.083
757.695
792.273
748.882
724.375
713.934
733.311
659.459
777.427
792.043
734.414
661.195
580.362
605.04
1268.872
10 Year Payment
0
0
1119.703
0
0
0
0
1779.225
2015.499
6445.414
10 Year Payment
10 Year Payment
259.84
25.512
765.334
373.556
295.565
391.377
621.925
216.663
484.712
248.788
861.31
623.753
520.673
0
1st Year Interest
0.0325
0
198.967925
235.484925
198.62375
161.49965
225.972175
225.875975
227.588075
230.608625
185.24155
257.413975
226.261425
220.72505
213.87275
202.617675
362.176425
251.251975
246.250875
257.488725
243.38665
235.421875
232.02855
238.326075
214.324175
252.663775
257.413975
238.68455
214.888375
188.61765
196.638
412.3834
1st Year Interest
0.0325
0
0
363.903475
0
0
0
0
578.248125
655.037175
2094.75955
1st Year Interest
1st Year Interest
84.448
8.2914
248.73355
121.4057
96.058625
127.197525
202.125625
70.415475
157.5314
80.8561
279.92575
202.719725
169.218725
0
1st Year Utility Billing Payment
0
73.75
87.28
73.62
59.86
83.76
83.72
84.36
85.48
68.66
95.41
83.86
81.81
79.27
75.1
134.24
93.13
91.27
95.44
90.21
87.26
86
88.34
79.44
93.65
95.41
88.47
79.65
69.91
72.88
152.85
1st Year Utility Billing Payment
0
0
134.88
0
0
0
0
214.32
242.78
776.38
1st Year UB Payment
1st Year UB Payment
31.3
3.08
92.19
45
35.61
47.15
74.92
26.1
58.39
29.97
103.75
75.14
62.72
0
Interim Interest (XXX% APR)
Interim Interest (XXX% APR)
Interim Interest (XXX% APR)
Interim Interest (XXX% APR)
Final Assessment
Final Assessment
Final Assessment
Final Assessment
INT INT CALCULATED FROM 08/15/07
Amounts Paid by City Already to Homeowner or Contractor
Amounts Paid by City Already to Homeowner or Contractor
Amounts Paid by City Already to Homeowner or Contractor
Amounts Paid by City Already to Homeowner or Contractor
INT INT CALCULATED FROM 08/15/07
Check # and Vendor Name
INT INT CALCULATED FROM 08/15/07
Check # and Vendor Name
Check # and Vendor Name
Check # and Vendor Name
DATE PAID
DATE PAID
DATE PAID
DATE PAID
Instrument # (deed)
124302
292464
417167
402455
278271
316897
393299
375917
358481
364546
285311
406535
368666
153009
423671
252435
426420
422113
323090
290597
340029
313606
398312
386327
311812
337512
220295
365790
424740
423072
295674
Instrument # (deed)
Instrument # (deed)
433072
433072
433072
433072
433072
433072
433072
433072
433072
433072
433072
433072
433072
433072
433072
433072
433072
433072
Instrument # (deed)
Previous LID
Parcel
Legal Description
Legal Description
Legal Description
Legal Description
LOCAL IMPROVEMENT DISTRICT 50
Item #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
LOCAL IMPROVEMENT DISTRICT 50
Item #
32
33
34
35
36
37
38
39
40
41
Item #
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
Item #
60
61
62
63
64
65
66
67
68
69
99
Map Section
Map Section
Map Section
Map Section
Map Section
Map Section
Park St
No.
No.
502
534
546
550
558
566
576
586
596
610
620
630
640
162
670
511
521
529
543
553
561
571
581
589
597
605
625
635
645
655
665
7th North
No.
No.
297
315
339
367
679
420
386
12th West Development
No.
23
Misc. Parcels
No.
314
50
40
136
138
146
160
376
150
Dir
Dir
W
W
W
W
W
W
W
W
W
W
W
W
W
S
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Dir
Dir
E
E
E
E
N
E
E
E
Dir
Dir
E
E
E
E
E
E
W
N
Street
Street
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Aries St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Park St
Street
Street
7th North
7th North
7th North
7th North
7th North
7th North
Stonebridge St
7th North
7th North
7th North
Street
Sawtelle Ave
Street
4th South
Mill Race
Mill Race
1st North
1st North
1st North
1st North
1st North
4th South
2nd West
L Name
Company/ L Name
City of Rexburg
Bert & Terrie Flamm
Ladean Hilton
Jorge & Maria Hernandez
Brent & Theresa Ashcraft
Sandra Angell
Brandon & Ashley Sharon
Steven Christensen
Justin & Michelle Alexander
Traci Ann Maurino
Gary & Chimene Benson
Rebecca & Timothy Ng
Hung Ng Ying
Wren Clair Harrop
Kaylene Ross
Kevin & Carrie Shiley
Corde & Danielle Miller
Dawson & Ashlyn Bingham
Tiffany & Jeffrey Gibbons
Brian & Megan Dold
Salem & Rebecca El-Kher
Benjamin S Ashley
Alex & Brianna Scott
Karen & Bryce Anderson
Melvin & Doris Cook Living Trust
Ryan & Lisa Snelgrove
Kenneth England
Benjamin & Rachel Luthi
Light Enterprises LLC
Delaine & Lori Rydalch
Joseph & Ashley Anderson
L Name
Company/ L Name
City of Rexburg
City of Rexburg
Dorion Development Inc
David & Susan Salvesen
Dianna Theis
Spencer & Tara Parker
Darren P Clark
Rexburg Pacific Associates
Rexburg Urban Renewal Agency
Grover Dean R Family Bypass Trust
Company/ L Name
Joshua R Fullmer
Matthew M Griffeth
Matthew M Griffeth
Matthew M Griffeth
12TH WEST DEVELOPMENT LLC
12TH WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
12th WEST DEVELOPMENT LLC
Company/ L Name
Wesley & Madison Monasmith
Timothy Martindale
David Jacob
Keith & Joann Lewis
Bodrero Revocable Living Trust
Bodrero Revocable Living Trust
Turquoise Springs LLC
Turquoise Springs LLC
Daniel & Amanda Smith
Jay & Sephlin Hepworth
City of Rexburg
Date Reported
Notes (Add to Property Owner Notes Sheet Instead)
Park St Park
1/27/20: Met with Noah about mailbox which is in front of neighbor and removing sidewalk bumpout addition from costs.
1/27/20: Met with Brett at property to discuss estimate and reasons for work.
1/27/20 Noah talked to Corde for 1 ½ hours going over LID process, what is an LID, ADA Compliance, proposed work on his property, and finance options. 1/29/2020 Noah talked to Corde
for two hours. Concerns about the proposed work on City trust lands were presented. He requested the specifications for the whole project. It was explained that the specifications for
the project will be available when the engineers are ready to request bids for this project. There was a request for the City ordinance that dictates how much the City will reimburse
for sidewalk, curb & gutter. There was a request for the City ordinance that dictates the liability of the repairs of sidewalk falls on the adjacent property owner. Corde provided his
email address and the ordinances and resolutions were send.
2/3/20: Notice of Intent to Create letter was return to sender. Park St. is removed from LID 49 thus, no further notice is needed.
1/22/20: Met with Noah about existing SW which was recently poured but does not meet ADA standards.
1/29/20: Called Eric and asked about quantity calculations and cost, city participation rates, mailbox bumpout.
1/30/20: Property owner is for LID 49 and is happy that the City is going to repair the street of his rental property.
Date Reported
Notes (Add to Property Owner Notes Sheet Instead)
Water Dept 100%, Approx 271 E 7th North
Water Dept?
Covey Cove, Approx 301 E 7th North
City 100%
City 100%
City 100%
Stonebridge-City 100%
Carlow Senior Apartments
Urb Ren 100%
Approx 300 E 7th North
Notes
Notes
Missing Full Length (Hill section, 12" Compaction)
Missing 5' Section
Missing Full Length outside driveway, driveway length of SW is acceptable
Replace-Safety
Replace-Safety
Replace-Safety
Replace-Safety
Replace-Safety
Missing Full West
LID 49 Holdover for sidewalk (37 SY of regular SW)
LOCAL IMPROVEMENT DISTRICT 49-Exhibit A of Ordinance
Item #
Map Section
No.
Dir
Street
Company/ L Name
F Name
Parcel #
Instrument # (deed)
Legal Description
Brief Legal
.