HomeMy WebLinkAboutCOMCHECK - 08-00224 & 08-00225 - Rod Jones Real Estate Office (2)2006 IECC 08 00224 & 08 00225 COMcheck Software Versit Rod Jones BuildingRevisions 5/23/08 Envelope Compliaill Ill c GI LII IVQ LV Report Date: 05/19/06 Data f lename: S:\Drawings1366-Rod JoneskRodJones.cck Section 1: Project Information Project Type: New Construction Project Title : Rod Jones Facility - Idaho's Realtor Construction Site: Rexburg, ID 83440 Owner/Agent: Rod Jones Section 2: General Information Building Location (for weather data): Rexburg, Idaho Climate Zone: 6b Heating Degree Days (base 65 degrees F): 8693 Cooling Degree Days (base 50 degrees F): 1446 Vertical Glazing / Wall Area Pct.: 18 Activity Type(s) Office Section 3: Requirements Checklist Envelope PASSES: Design 3% better than code. Climate -Specific Requirements: Floor Area 5512 Designer/Contractor: Johnny Watson JRWA 1152 Bond Ave Rexburg, ID 83440 359-2309 jwatson@jma.com p EC EE INE D MAY 2 3 2008 CITY OF REXE3G Component NamelDescription Gross Area Cavity Cont. Proposed Budget or Perimeter R -Value R -Value U -Factor U -Factor Roof 1: Attic Roof with Wood Joists 4165 38.0 0.0 0.027 0.034 Exterior Wall 1: Wood -Framed, 16" o.c. 3000 19.0 0.0 0.067 0.089 Window 1: Vinyl Frame:Double Pane with Low -E, Clear, SHGC 0.70 519 -- -- 0.550 0.350 Door 1: Glass, Entrance Door, SHGC 0.40 42 -- -- 0.350 0.800 Door 2: Insulated Metal, Swinging 42 -- -- 0.600 0.700 Basement Wall 1: Solid Concrete:10" Thickness, Medium Density, 972 11.0 0.0 0.092 0.323 Furring: Wood, Wall Ht 9.0, Depth B.G. 8.0 Floor 1: Wood-Fmmed 4165 19.0 0.0 0.051 0.034 (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance with the manufacturer's installation Instructions. ❑ 2. Windows, doors, and skylights certified as meeting leakage requirements. 3. Component R -values & U -factors labeled as certified. 4. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R -value without compressing the insulation. Project Title: Rod Jones Facility - Idaho's Realtor Data filename: S:\Drawings\366-Rod Jones\RodJones.cck Report date: 05/19/08 Page 1 of 4 5. No roof insulation is installed on a suspended ceiling with removable ceiling panels. 6. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. 7. Cargo doors and loading dock doors are weather sealed. 8. Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (ii) installed inside an appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from Insulation material. 9. Building entrance doors have a vestibule and equipped with closing devices. Exceptions: Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. R. in area. 10.Vapor retarder Installed. Section & C.om Dllance Statement ,. ;mpliance State e . The pro s envelope d n represented in this document is consistent with the building plans, specifications and other calcullidicyle submitt w' this permi lication. The proposed envelope system has been designed to meet the 20061ECC requirement Mcheck er n3. an co y with the mandatory requirements in the Requirements Checklis . _W5071 - Title Signature Da Project Title: Rod Jones Facility - Idaho's Realtor Report date: 05/19/08 Data filename: SADrawings\366-Rod Jones\RodJones.cck Page 2 of 4