HomeMy WebLinkAboutCOMCHECK - 08-00224 & 08-00225 - Rod Jones Real Estate OfficeCOMcheck Software Version 3.5.3
Envelope Compliance Certificate
2006 IECC
Report Date: 05/19/08
Data filename: Untitled.cck
Section 1: Project Information
Project Type: New Construction
Project Title : Rod Jones Facility - Idaho's Realtor
Construction Site:
Rexburg, 10 83440
Owner/Agent:
Rod Jones
Section 2: General Information
Building Location (for weather data):
Rexburg, Idaho
Climate Zone:
6b
Heating Degree Days (base 65 degrees F):
8693
Cooling Degree Days (base 50 degrees F):
1446
Vertical Glazing / Wall Area Pct.:
18%
Activity Type(s) Floor Area
Office 5512
Section 3: Requirements Checklist
Envelope PASSES: Design 3% better than code.
Climate -Specific Requirements:
Component Name/Description
Roof 1: Attic Roof with Wood Joists
Exterior Wall 1: Wood -Framed, 16" o.c.
Window 1: Vinyl Frame:Double Pane with Low -E, Clear, SHGC 0.70
Door 1: Glass, Entrance Door, SHGC 0.40
Door 2: Insulated Metal, Swinging
Basement Wall 1: Solid Concrete: 10" Thickness, Medium Density,
Furring: Wood, Wall Ht 9.0, Depth B.G. 8.0
Floor 1: Wood -Framed
0800224
Rod Jones Real Estate Office
Designer/Contractor:
Johnny Watson
JRWA
1152 Bond Ave
Rexburg, ID 83440
359-2309
jwatson@jnva.com
D EC EE WE
D
MAY 2 7 2008
CITY OF REXQURG
Gross Area Cavity Cont. Proposed Budget
x Perimeter R -Value R -Value U -Factor U -Factor
4165 38.0
0.0
0.027
0.034
3000 19.0
0.0
0.067
0.089
519 --
---
0.550
0.350
42 --
--
0.350
0.800
42 --
---
0.600
0.700
972 11.0
0.0
0.092
0.323
4165 19.0 0.0 0.051 0.034
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements.
Air Leakage, Component Certification, and Vapor Retarder Requirements
Lj 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance
with the manufacturer's installation Instructions.
FI 2. Windows, doors, and skylights certified as meeting leakage requirements.
n 3. Component R -values & U -factors labeled as certified.
F -I 4. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that
achieves the rated R -value without compressing the,insulation.
Project Title: Rod Jones Facility - Idaho's Realtor Report date: 05/19/08
Data filename: Untitled.cck ?age 1 of 2
M
❑ 5. No roof Insulation is Installed on a suspended ceiling with removable ceiling panels.
❑ 6. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized
dampers.
i7 7. Cargo doors and loading dock doors are weather sealed.
❑ 8. Recessed lighting fixtures are: (I) Type IC rated and sealed or Basketed; or (ii) installed inside an appropriate air -tight assembly with a
0.5 inch clearance from combustible materials and with 3 inches clearance from insulation matedal.
9. Building entrance doors have a vestibule and equipped with closing devices.
Exceptions:
Building entrances with revolving doors.
Doors that open directly from a space less than 3000 sq. ft. in area.
❑ 10.Vapor retarder installed.
Section 4: Compliance Statement •////��II
Compliance Statement: The proposed envelope design represepterfin his d u tis consistefit . th,the buil g plans, specifications
and other calculations submitted with this permit applicatl Jas the proposed env 0pe system has .e desig to meet the 2006 IECC
requirements in COMcheck Version 3.5.3 and to comply with the mandato;yq ' ements in a ire hecklist.
Name - Title nog
Project Title: Rod Jones Facility - Idaho's Realtor
Data filename: Untitled.cck
Report date: 05/19/08
Page 2 of 2