Loading...
HomeMy WebLinkAboutCOMCHECK - 08-00224 & 08-00225 - Rod Jones Real Estate OfficeCOMcheck Software Version 3.5.3 Envelope Compliance Certificate 2006 IECC Report Date: 05/19/08 Data filename: Untitled.cck Section 1: Project Information Project Type: New Construction Project Title : Rod Jones Facility - Idaho's Realtor Construction Site: Rexburg, 10 83440 Owner/Agent: Rod Jones Section 2: General Information Building Location (for weather data): Rexburg, Idaho Climate Zone: 6b Heating Degree Days (base 65 degrees F): 8693 Cooling Degree Days (base 50 degrees F): 1446 Vertical Glazing / Wall Area Pct.: 18% Activity Type(s) Floor Area Office 5512 Section 3: Requirements Checklist Envelope PASSES: Design 3% better than code. Climate -Specific Requirements: Component Name/Description Roof 1: Attic Roof with Wood Joists Exterior Wall 1: Wood -Framed, 16" o.c. Window 1: Vinyl Frame:Double Pane with Low -E, Clear, SHGC 0.70 Door 1: Glass, Entrance Door, SHGC 0.40 Door 2: Insulated Metal, Swinging Basement Wall 1: Solid Concrete: 10" Thickness, Medium Density, Furring: Wood, Wall Ht 9.0, Depth B.G. 8.0 Floor 1: Wood -Framed 0800224 Rod Jones Real Estate Office Designer/Contractor: Johnny Watson JRWA 1152 Bond Ave Rexburg, ID 83440 359-2309 jwatson@jnva.com D EC EE WE D MAY 2 7 2008 CITY OF REXQURG Gross Area Cavity Cont. Proposed Budget x Perimeter R -Value R -Value U -Factor U -Factor 4165 38.0 0.0 0.027 0.034 3000 19.0 0.0 0.067 0.089 519 -- --- 0.550 0.350 42 -- -- 0.350 0.800 42 -- --- 0.600 0.700 972 11.0 0.0 0.092 0.323 4165 19.0 0.0 0.051 0.034 (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements Lj 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance with the manufacturer's installation Instructions. FI 2. Windows, doors, and skylights certified as meeting leakage requirements. n 3. Component R -values & U -factors labeled as certified. F -I 4. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R -value without compressing the,insulation. Project Title: Rod Jones Facility - Idaho's Realtor Report date: 05/19/08 Data filename: Untitled.cck ?age 1 of 2 M ❑ 5. No roof Insulation is Installed on a suspended ceiling with removable ceiling panels. ❑ 6. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. i7 7. Cargo doors and loading dock doors are weather sealed. ❑ 8. Recessed lighting fixtures are: (I) Type IC rated and sealed or Basketed; or (ii) installed inside an appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation matedal. 9. Building entrance doors have a vestibule and equipped with closing devices. Exceptions: Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft. in area. ❑ 10.Vapor retarder installed. Section 4: Compliance Statement •////��II Compliance Statement: The proposed envelope design represepterfin his d u tis consistefit . th,the buil g plans, specifications and other calculations submitted with this permit applicatl Jas the proposed env 0pe system has .e desig to meet the 2006 IECC requirements in COMcheck Version 3.5.3 and to comply with the mandato;yq ' ements in a ire hecklist. Name - Title nog Project Title: Rod Jones Facility - Idaho's Realtor Data filename: Untitled.cck Report date: 05/19/08 Page 2 of 2