Loading...
HomeMy WebLinkAboutPLANS REDLINED REVISIONS - 20-00791 - 127 N 4th E Units 1 & 2 - A Greener Door DuplexAuthor Name Author Email Author Phone No.: Larry Beesley Larry.Beesley@rexburg.org 208-372-2176 Alan Parkinson Alan.Parkinson@rexburg.org 208-372-2165 Description : 127 N 4th E Units 1 & 2 - A Greener Door DuplexAddress : 127 N 4th E Units 1 & 2Application Type : Document Filename : 0917GreenDoor_PermitDwgs.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference AnnotationType Author : Department Status Page Review Comments Applicant Response Comments A-1 Free text Larry Beesley : Building Open 2 SD A-1 Free text Larry Beesley : Building Open 2 SD CO A-1 Free text Larry Beesley : Building Open 2 SD A-1 Free text Larry Beesley : Building Open 2 SD A-1 Free text Larry Beesley : Building Open 2 SD A-1 Free text Larry Beesley : Building Open 2 SD CO A-1 Free text Larry Beesley : Building Open 2 SD A-1 Free text Larry Beesley : Building Open 2 SD A-1 Free text Larry Beesley : Building Open 2 F A-1 Free text Larry Beesley : Building Open 2 F A-1 Free text Larry Beesley : Building Open 2 F A-1 Free text Larry Beesley : Building Open 2 F A-1 Free text Larry Beesley : Building Open 2 Attic Access 22"x30" minimum access where attic clear heightexceeds 30" (R807) # 20-00791Building New Duplex You will need to provide more details on the footings and foundation, floors,TJIs and or slab on grade with in floor heat. Also pony and bearing walls and footings as needed. Report Date: 07-10-2020 Approval of plans does not constitute approval of variance from code Page 1 of 2 Page Reference AnnotationType Author : Department Status Page Review Comments Applicant Response Comments A-1 Free text Larry Beesley : Building Open 2 Attic Access 22"x30" minimum access where attic clear heightexceeds 30" (R807) A-1 Free text Larry Beesley : Building Open 2 SMOKE DETECTOR REQUIRED A-2 Free text Larry Beesley : Building Open 3 FOOTING AND FOUNDATION WALL REQUIRED A-2 Free text Larry Beesley : Building Open 3 YOU NEED TO SHOW BEARING PONE WALL FOOTINGS ANDDETAILS OF THE SIZE OF ALL FOOTINGS AND FOUNDATIONS A-2 Free text Larry Beesley : Building Open 3 X X A-2 Free text Larry Beesley : Building Open 3 X X A-2 Free text Larry Beesley : Building Open 3 X X A-2 Free text Larry Beesley : Building Open 3 4200LB HOLD DOWNS A-2 Free text Larry Beesley : Building Open 3 Radon Reduction System IRC Appendix F A-2 Free text Larry Beesley : Building Open 3 Radon Reduction System IRC Appendix F A-2 Free text Larry Beesley : Building Open 3 Rebar: 8' Wall-Horizontal & Vertical 24" O.C. with 2 in Top 12"Rebar: 4' Wall-Horizontal & Vertical 24" O.C. with 1 in Top 6" A-3 Free text Larry Beesley : Building Open 4 Roof Trusses (designed according to R802.10.1) 35 # Snow and90 mph winds (Local Conditions) A-4 Free text Larry Beesley : Building Open 5 Street NumberDisplayed on House A-5 Free text Larry Beesley : Building Open 6 Ground Surface to Slope away from Foundation a minimum of6" within first 10 ft. A-5 Free text Larry Beesley : Building Open 6 Roof Ventilation as per R806 A-5 Free text Larry Beesley : Building Open 6 Footing Depth (36" below finished grade and 12" belowundisturbed soil; 18" to top of slab - interior) A-0 Free text Alan Parkinson : P&Z Open 1 7' Landscape Strip and 5' Sidewalk shall be provided A-0 Free text Alan Parkinson : P&Z Open 1 Front yard shall not have more than 40% covered by concreteor asphalt in the Low Density Residential 2 (LDR2) Zone. If youpush the house back a little this should help satisfy thisrequirement. A-0 Free text Alan Parkinson : P&Z Open 1 Public Works requires the Right of Way to encompass 12'behind back of curb. To address this, please contact the PublicWorks Department. Report Date: 07-10-2020 Approval of plans does not constitute approval of variance from code Page 2 of 2 Powered by TCPDF (www.tcpdf.org) 4 t h E A S T 84 . 9 ' 189' 2016 09/17/20 DR A W I N G S A R E F O R M A T T E D T O P R I N T T O S C A L E O N 2 4 " X 3 6 " . T H E S E P L A N S W E R E D R A F T E D B Y V R D E S I G N . P L E A S E C O N T A C T ( 2 0 8 ) 2 0 6 - 9 6 8 1 F O R D E S I G N S E R V I C E S . G E N E R A L C O N T R A C T O R I S R E S P O N S I B L E T O V E R I F Y D E S I G N I S E N G I N E E R E D I F R E Q U I R E D A N D I S C O N S T R U C T E D T O C U R R E N T C O D E R E Q U I R E M E N T S . 4T H E A S T RE X B U R G , I D 8 3 4 4 0 Gr e e n D o o r DATE: PROJECT: REVISION DATES: T W I N H O U S E A-0 SI T E L A Y O U T 4th East, Rexburg Idaho 83440 Green Door Duplex 7' Landscape Strip and 5' Sidewalk shall be provided Front yard shall not have more than 40% covered by concrete or asphalt in the Low Density Residential 2 (LDR2) Zone. If you push the house back a little this should help satisfy this requirement. Public Works requires the Right of Way to encompass 12' behind back of curb. To address this, please contact the Public Works Department. MASTER 14'0" X 12'5" #3/OFFICE BEDROOM #2 14'0" X 11'1" 11'8" X 12'9" LIVING 16'6" X 15'8" KITCH/DIN. 16'6" X 17'9" REF WIC COV. PATIO 16'7" X 8'0" LDY. 6'7" X 9'0" DW MW 2-CAR GARAGE 23'1" x 23'8" WINDOW SCHEDULE SYM.SIZE DOOR SCHEDULE SYM.SIZE NOTESTYPE TYPE NOTESQTY HARDWARE PTY. 3'9" X 6'8" MASTER 14'0" X 12'5" #3/OFFICE BEDROOM #2 14'0" X 11'1" 11'8" X 12'9" LIVING 16'6" X 15'8" KITCH/DIN. 16'6" X 17'9" REF WIC COV. PATIO 16'7" X 8'0" LDY. 6'7" X 9'0" MW 2-CAR GARAGE 23'1" x 23'8" COVERED PATIO 14'9" X 6'0" PTY. 3'9" X 6'8" 2016 09/17/20 DR A W I N G S A R E F O R M A T T E D T O P R I N T T O S C A L E O N 2 4 " X 3 6 " . T H E S E P L A N S W E R E D R A F T E D B Y V R D E S I G N . P L E A S E C O N T A C T ( 2 0 8 ) 2 0 6 - 9 6 8 1 F O R D E S I G N S E R V I C E S . G E N E R A L C O N T R A C T O R I S R E S P O N S I B L E T O V E R I F Y D E S I G N I S E N G I N E E R E D I F R E Q U I R E D A N D I S C O N S T R U C T E D T O C U R R E N T C O D E R E Q U I R E M E N T S . 4T H E A S T RE X B U R G , I D 8 3 4 4 0 Gr e e n D o o r DATE: PROJECT: REVISION DATES: T W I N H O U S E FL O O R P L A N A-1 SD SD CO SD SD SD SD CO SD SD F F F F Attic Access 22"x30" minimum access where attic clear height exceeds 30" (R807) Attic Access 22"x30" minimum access where attic clear height exceeds 30" (R807) SMOKE DETECTOR REQUIRED GARAGE SLAB GARAGE SLAB HOUSE SLAB 2016 09/17/20 DR A W I N G S A R E F O R M A T T E D T O P R I N T T O S C A L E O N 2 4 " X 3 6 " . T H E S E P L A N S W E R E D R A F T E D B Y V R D E S I G N . P L E A S E C O N T A C T ( 2 0 8 ) 2 0 6 - 9 6 8 1 F O R D E S I G N S E R V I C E S . G E N E R A L C O N T R A C T O R I S R E S P O N S I B L E T O V E R I F Y D E S I G N I S E N G I N E E R E D I F R E Q U I R E D A N D I S C O N S T R U C T E D T O C U R R E N T C O D E R E Q U I R E M E N T S . 4T H E A S T RE X B U R G , I D 8 3 4 4 0 Gr e e n D o o r DATE: PROJECT: REVISION DATES: T W I N H O U S E FO U N D A T I O N A-2 FOOTING AND FOUNDATION WALL REQUIRED YOU NEED TO SHOW BEARING PONE WALL FOOTINGS AND DETAILS OF THE SIZE OF ALL FOOTINGS AND FOUNDATIONS X X X X X X 4200LB HOLD DOWNS Radon Reduction System IRC Appendix F Radon Reduction System IRC Appendix F Rebar: 8' Wall-Horizontal & Vertical 24" O.C. with 2 in Top 12" Rebar: 4' Wall-Horizontal & Vertical 24" O.C. with 1 in Top 6" 2016 09/17/20 DR A W I N G S A R E F O R M A T T E D T O P R I N T T O S C A L E O N 2 4 " X 3 6 " . T H E S E P L A N S W E R E D R A F T E D B Y V R D E S I G N . P L E A S E C O N T A C T ( 2 0 8 ) 2 0 6 - 9 6 8 1 F O R D E S I G N S E R V I C E S . G E N E R A L C O N T R A C T O R I S R E S P O N S I B L E T O V E R I F Y D E S I G N I S E N G I N E E R E D I F R E Q U I R E D A N D I S C O N S T R U C T E D T O C U R R E N T C O D E R E Q U I R E M E N T S . 4T H E A S T RE X B U R G , I D 8 3 4 4 0 Gr e e n D o o r DATE: PROJECT: REVISION DATES: T W I N H O U S E RO O F L A Y O U T A-3 Roof Trusses (designed according to R802.10.1) 35 # Snow and 90 mph winds (Local Conditions) EAST ELEVATION SOUTH SIDE ELEVATION 2016 09/17/20 DR A W I N G S A R E F O R M A T T E D T O P R I N T T O S C A L E O N 2 4 " X 3 6 " . T H E S E P L A N S W E R E D R A F T E D B Y V R D E S I G N . P L E A S E C O N T A C T ( 2 0 8 ) 2 0 6 - 9 6 8 1 F O R D E S I G N S E R V I C E S . G E N E R A L C O N T R A C T O R I S R E S P O N S I B L E T O V E R I F Y D E S I G N I S E N G I N E E R E D I F R E Q U I R E D A N D I S C O N S T R U C T E D T O C U R R E N T C O D E R E Q U I R E M E N T S . 4T H E A S T RE X B U R G , I D 8 3 4 4 0 Gr e e n D o o r DATE: PROJECT: REVISION DATES: T W I N H O U S E A-4 EX T E R I O R EL E V A T I O N S Street Number Displayed on House WEST ELEVATION NORTH SIDE ELEVATION 2016 09/17/20 DR A W I N G S A R E F O R M A T T E D T O P R I N T T O S C A L E O N 2 4 " X 3 6 " . T H E S E P L A N S W E R E D R A F T E D B Y V R D E S I G N . P L E A S E C O N T A C T ( 2 0 8 ) 2 0 6 - 9 6 8 1 F O R D E S I G N S E R V I C E S . G E N E R A L C O N T R A C T O R I S R E S P O N S I B L E T O V E R I F Y D E S I G N I S E N G I N E E R E D I F R E Q U I R E D A N D I S C O N S T R U C T E D T O C U R R E N T C O D E R E Q U I R E M E N T S . 4T H E A S T RE X B U R G , I D 8 3 4 4 0 Gr e e n D o o r DATE: PROJECT: REVISION DATES: T W I N H O U S E A-5 EX T E R I O R EL E V A T I O N S Ground Surface to Slope away from Foundation a minimum of 6" within first 10 ft. Roof Ventilation as per R806 Footing Depth (36" below finished grade and 12" below undisturbed soil; 18" to top of slab - interior)