Loading...
HomeMy WebLinkAboutSOIL DENSITY 3 - 19-00723 - Mountain America Credit Union Office - Call CenterIn Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл MACU Call Center 20023 MACU Big-D Nov 3, 2020 D. Aust 10:30 AM 7:00 PM 3743 730 2696 BSBottom of Asphalt 6.7 128 98% West side of parking lot, 5 feet South of Valley gutter and 180 feet West of Northwest corner of bldg Bottom of Asphalt 3/4 base 97% 128 5.5 124.7 131.6 96% 128 6.2 123.4 131 3/4 base Bottom of Asphalt West side of parking lot, 3 feet South of Valley gutter and 100 feet West of Northwest corner of bldg 95% 128 4.9 121.9 127.9 3/4 base Bottom of Asphalt West side of parking lot, 5 feet South of Valley gutter and 75 feet West of Northwest corner of bldg 97% 128 3.3 124.5 128.6 3/4 base Bottom of Asphalt West side of parking lot, 20 feet North of Valley gutter and 200 feet West of Northwest corner of bldg 99% 128 4 126.5 131.6 3/4 base Bottom of Asphalt West side of parking lot, 20 feet North of Valley gutter and 150 feet West of Northwest corner of bldg 98% 128 5.5 126 133 3/4 base Bottom of Asphalt West side of parking lot, 20 feet North of Valley gutter and 100 feet West of Northwest corner of bldg Digitally signed by Jacob P Christensen Date: 2020.11.11 14:23:49 -07'00' 10:30-12:30 AM 5:00-7:00 PM BS BS BS BS BS BS 1 125 133.6West side of parking lot, 3 feet South of Valley gutter and 200 feet West of Northwest corner of bldg 3/4 base 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 98% 128 3.9 125.6 130.5 3/4 base Bottom of Asphalt West side of parking lot, 20 feet North of Valley gutter and 50 feet West of Northwest corner of bldg 128 96% 2.4 123.3 126.2 3/4 base Bottom of Asphalt East side of parking lot, 20 feet East and 20 feet South of Northeast corner of bldg 128 95% 3.5 121.4 125.6 3/4 base Bottom of Asphalt East side of parking lot, 30 feet East and 40 feet South of Northeast corner of bldg 128 99% 4.3 126.6 132.1 3/4 base Bottom of Asphalt East side of parking lot, 10 feet East and 70 feet South of Northeast corner of bldg BS BS BS BS 8 11 9 10