HomeMy WebLinkAboutSOIL DENSITY 2 - 19-00723 - Mountain America Credit Union Office - Call CenterIn Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
MACU
20023
MACU
Big-D
Nov 4, 2020 D. Aust
3:30 PM 5:30 PM
3743
741 2703
BSBottom of Asphalt 3.3
128
96%
East side of parking lot. Approximately 30' North and 20' East
of Northeast corner of bldg
Bottom of Asphalt
3/4 Base
98%
128
3.4
125.1
129.3
Digitally signed by Jacob P
Christensen
Date: 2020.11.05 09:17:37 -07'00'
BS
1
123
127.3East side of parking lot. Approximately 20' North and 30' East
of Northeast corner of bldg
3/4 Base
2