Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - The Grove at Thomson FarmsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Construction 11-02-2020 Cold 6:30 AM 26 8:30 AM I arrived on site at approximately 6:45 AM. I observed that the contractor had placed a blue moisture barrier as well as rebar in the footing areas. I tested the first truck and sixth trucks and found them to be within project specifications. Digitally signed by Jacob P Christensen Date: 2020.11.05 08:15:07 -07'00' D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: