Loading...
HomeMy WebLinkAboutSITE PLANS - 19-00780 - 500 N 2nd E - DL Evans BankSTATE MAP 51 78 95 20I-8 4 93 I-8 4 I-86 I - 1 5 I-1 5 I- 1 5 30 34 26 93 20 33 75 26 20 26 28 75 21 93 55 I- 8 4 52 95 95 95 12 13 9 5 95 I-90 95 95 M O N T A N A WY O M I N G UTAH CANADA WA S H I N G T O N OR E G O N BOUNDARY BONNER KOOTENAI SHOSHONE BENEWAH LATAH CLEARWATER NEZ PERCE LEWIS IDAHO ADAMS WASHINGTON VALLEY LEMHI CUSTER CLARK FREMONT BOISEGEM PAYETTE BLAINE CAMAS ELMOREADA CANYON OWYHEE BUTTE LINCOLNGOODING JEROME TWIN FALLS CASSIA MINIDOKA POWER ONEIDA BANNOCK CARIBOU FRANKLIN BEAR LAKE BINGHAM BONNEVILLE JEFFERSON MADISON TETON VICINITY MAP Know what's below. Call before you dig. R PROJECT SITE NEVADA IF-797-1601 BM # SURVEY NOTE: THIS SITE PLAN CONFORMS TO AN ACTUAL SURVEY THAT WAS PERFORMED ON THE GROUND BY A LICENSED LAND SURVEYOR IN AND FOR THE STATE OF IDAHO. IT IS THE OWNER'S RESPONSIBILITY TO CONSTRUCT ALL STRUCTURES SHOWN ON THIS SITE PLAN IN ACCORDANANCE WITH SAID SURVEY. SHEET INDEX PAGE #SHEET #SHEET TITLE 1 C.1.0 COVER 2 C.1.1 GENERAL NOTES 3 C.1.2 LEGEND 4 C.2.0 OVERALL EXISTING CONDITIONS & DEMO PLAN 5 C.3.0 SITE PLAN 6 C.4.0 GRADING PLAN 7 C.5.0 UTILITY & DRAINAGE PLAN 8 C.6.0 EROSION AND SEDIMENT CONTROL PLAN SITE PLAN FOR D.L. EVANS BANK NNA NORTH 2ND EAST, REXBURG, IDAHO 83440 H:\!2018\ID-1174-1805 D.L. Evans 2nd East (Rexburg)\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\ID-1174-1805_01_COVER.dwg - C.1.0 COVER - 3/02/2020 08:03am, cadenf 1 5 RE V I S I O N S RE V # DA T E DR A W I N G I N F O DA T E DE S I G N E D DR A W N *S E E G E N E R A L N O T E S S H E E T WA R N I N G 0 1 2 IF T H I S B A R D O E S N O T ME A S U R E 2 " T H E N DR A W I N G I S N O T T O S C A L E ww w . h o r r o c k s . c o m PAGE C PR O J E C T CH E C K E D D B A # 2 3 4 90 1 P i e r V i e w D r . , S u i t e 2 0 5 Id a h o F a l l s , I D 8 3 4 0 2 (2 0 8 ) 5 2 2 - 1 2 2 3 PRELIMINARY NOT FOR CONSTRUCTION CI T Y R E V I E W S E T 28 J A N 2 0 2 0 1 28 F E B 2 0 2 0 2 ID - 1 1 7 4 - 1 8 0 5 LT S CJ F CJ F 20 D E C 2 0 1 9 CO V E R D. L . E V A N S B A N K NN A N O R T H 2 N D E A S T , RE X B U R G , I D A H O 8 3 4 4 0 1 C.1.0 ENGINEER: HORROCKS ENGINEERS 901 Pier View Dr., Suite 205 Idaho Falls, ID 83402 (208) 522-1223 CONTACT: LEITH SHEETS, PE UTILITIES: POWER: ROCKY MOUNTAIN POWER GAS: INTERMOUNTAIN GAS SEWER: CITY OF REXBURG WATER: CITY OF REXBURG APPLICANT: ERSTAD ARCHITECTS 310 NORTH 5TH STREET BOISE, ID 83702 (208) 331-9031 CONTACT: TOM LENNON HW Y 2 0 W MAIN ST N 5 T H W R.R . E 1ST N N 2 N D E N Y E L L O W S T O N E H W Y E 2ND N E 7TH N N 2 N D E OWNER: DL EVANS BANK 375 N OVERLAND P.O. BOX 1188 BURLEY, ID 83318 (208) 363-8400 CONTACT: JESSICA AGUILAR BENCHMARK: BM#1 ELEV: 4871.46' N:791240.3293' E: 758958.7957' FOUND: PK & WASHER BM#2 ELEV:4870.88' N: 791402.3408' E: 758958.1883' FOUND: PK & WASHER BM#3 ELEV:4872.39' N: 791437.1284' E: 758991.4898' FOUND: 1\2" REBAR PLS 12457 BM#4 ELEV: 4872.16' N: 791437.8380' E: 759084.1026' FOUND: 1\2" REBAR PLS 12458 BM#5 ELEV:4871.83' N: 791416.6038' E: 759103.0743' FOUND: 1\2" REBAR PLS 12459 BM#6 ELEV: 4871.06' N: 791241.4558' E: 759103.7384' FOUND: 1\2" REBAR PLS 12460 04.12.19 09:26 AM | H:\!2018\ID-1174-1805 D.L. Evans 2nd East (Rexburg)\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\ID-1174-1805_02_GENERAL NOTES.dwg Know what's below. Call before you dig. R THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE DRAWINGS ARE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE DRAWINGS AND WE ASSUME NO RESPONSIBILITY AS TO THE ACCURACY OF THEIR DEPICTED LOCATION ON THESE DRAWINGS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN, AND ALL OTHER LINES NOT OF RECORD OR NOT SHOWN ON THESE DRAWING BY VERIFICATION OF THEIR LOCATION IN THE FIELD PRIOR TO THE START OF CONSTRUCTION ACTIVITIES. ENGINEER'S NOTICE TO CONTRACTOR USE OF THE INFORMATION CONTAINED IN THIS INSTRUMENT FOR OTHER THAN THE SPECIFIC PURPOSE FOR WHICH IT WAS INTENDED AND FOR OTHER THAN THE CLIENT FOR WHOM IT WAS PREPARED IS FORBIDDEN UNLESS EXPRESSLY PERMITTED IN WRITING IN ADVANCE TO HORROCKS ENGINEERS, AND HORROCKS ENGINEERS SHALL HAVE NO LIABILITY TO ANY USE OF THIS INFORMATION WITHOUT THEIR WRITTEN CONSENT. LEGAL NOTICE TO CONTRACTOR REVISIONS REV No.SHEET No.DATE OF REV DESCRIPTION C.3.0 28 JAN 2020 SANITARY SEWER CLEAN-OUT & KEYNOTE REVISIONS C.3.0 28 FEB 2020 ADJUSTED SNOW STORAGE AREA TO BE CLEAR OF EXISTING SIDEWALK C.5.0 28 FEB 2020 CHANGED 2" CURB STOP TO 2" GATE VALVE 1 2 2 1.ALL CONTRACTORS WORKING WITHIN THE PUBLIC ROAD RIGHT-OF-WAY ARE REQUIRED TO SECURE A RIGHT-OF-WAY CONSTRUCTION PERMIT FROM ITD AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION. ·CITY OF REXBURG ENGINEERING DEPARTMENT STANDARD SPECIFICATIONS AND DRAWINGS. ·CITY OF IDAHO FALLS SUPPLEMENTAL SPECIFICATIONS AND DRAWINGS TO ISPWC, 2018 EDITION. ·IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION(ISPWC, 2017). ·PROJECT GEOTECHNICAL REPORT PREPARED BY MTI , FILE NUMBER E180207G AND DATED 10-11-2018 NOTE: CONTRACTOR SHALL MAINTAIN A CURRENT COPY OF ALL PROJECT SPECIFICATIONS AND STANDARDS AT THE JOBSITE DURING CONSTRUCTION. PROJECT SPECIFICATIONS AND STANDARDS GENERAL NOTES UTILITY NOTES H:\!2018\ID-1174-1805 D.L. Evans 2nd East (Rexburg)\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\ID-1174-1805_02_GENERAL NOTES.dwg - C.0.2 GENERAL NOTES - 3/02/2020 08:03am, cadenf 1 5 RE V I S I O N S RE V # DA T E DR A W I N G I N F O DA T E DE S I G N E D DR A W N *S E E G E N E R A L N O T E S S H E E T WA R N I N G 0 1 2 IF T H I S B A R D O E S N O T ME A S U R E 2 " T H E N DR A W I N G I S N O T T O S C A L E ww w . h o r r o c k s . c o m PAGE C PR O J E C T CH E C K E D D B A # 2 3 4 90 1 P i e r V i e w D r . , S u i t e 2 0 5 Id a h o F a l l s , I D 8 3 4 0 2 (2 0 8 ) 5 2 2 - 1 2 2 3 PRELIMINARY NOT FOR CONSTRUCTION CI T Y R E V I E W S E T 28 J A N 2 0 2 0 1 28 F E B 2 0 2 0 2 ID - 1 1 7 4 - 1 8 0 5 LT S CJ F CJ F 20 D E C 2 0 1 9 GE N E R A L N O T E S D. L . E V A N S B A N K NN A N O R T H 2 N D E A S T , RE X B U R G , I D A H O 8 3 4 4 0 2 C.1.1 INTERMOUNTAIN GAS COMPANY 1527 HOLLIPARK DR. IDAHO FALLS, IDAHO 83401 (208) 542-6600 NATURAL GAS POWER CITY OF REXBURG PUBLIC WORKS 35 NORTH 1ST EAST REXBURG, IDAHO 83440 (208) 372-2320 WATER / SEWER ROCKY MOUNTAIN POWER 170 W 2ND N REXBURG, ID 83440 (208) 359-6155 UTILITY CONTACTS 1. THE STANDARD SPECIFICATIONS AND DRAWINGS USED FOR THIS PROJECT ARE CITY OF REXBURG ENGINEERING DEPARTMENT STANDARD SPECIFICATIONS AND DRAWINGS,CITY OF IDAHO FALLS ENGINEERING DEPARTMENT STANDARD SPECIFICATIONS(2018). CITY OF IDAHO FALLS PUBLIC WORKS DIVISION ENGINEERING DEPARTMENT STANDARD DRAWINGS(2018), AND IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION(ISPWC, 2017). 2. ALL SURPLUS EXCAVATION SHALL BE REMOVED FROM SITE AS PART OF THE PROJECT AND DISPOSED OF AT AN APPROVED LOCATION. 3. ALL CONSTRUCTION OF WATER, SEWER AND STORM SHALL BE TO THE CITY OF IDAHO FALLS STANDARDS UNLESS SPECIFIED OTHERWISE BY THE CITY OF REXBURG. THE SPECIFICATIONS AND DRAWINGS ARE AVAILABLE ONLINE AT: http://www.idahofallsidaho.gov/ OR http://rexburg.org/ 4. ALL CONSTRUCTION OF STREETS LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE TO THE CITY OF REXBURG STANDARDS. 5. THE CONTRACTOR SHALL LOCATE, RETAIN, AND PROTECT ALL EXISTING UTILITIES UNLESS DESIGNATED TO BE REMOVED. 7. ALL UTILITIES ADJUSTMENT OF MANHOLES, WATER VALVES, ETC. SHALL BE ADJUSTED TO FINISH GRADE BY THE CONTRACTOR AFTER PAVING AND LANDSCAPING ARE COMPLETE. 8. CONTRACTOR IS REQUIRED TO HAVE A SWPPP IN PLACE PRIOR TO ANY EARTH WORK OR CONSTRUCTION. 9. CONTRACTOR IS REQUIRED TO MAINTAIN THE SWPPP UNTIL THE NOTICE OF TERMINATION (NOT) IS FILED. 10. ANY MODIFICATION TO THE CONSTRUCTION, TO THE CONSTRUCTION SCHEDULE, OR TO THE CONSTRUCTION PHASE LIMITS SHALL BE APPROVED BY THE CITY ENGINEER. PRIOR TO SAID APPROVAL ALL IMPROVEMENT DRAWINGS SHALL BE RE-SUBMITTED TO THE CITY ENGINEER DEPT. SHOWING THE PROPOSED CHANGES. 11. CONTRACTOR IS RESPONSIBLE TO CONTROL ALL TEMPORARY STORM WATER POLLUTION AND DUST ABATEMENT DURING THE CONSTRUCTION PHASE AS REQUIRED BY THE FEDERAL CLEAN WATER ACT. 12. ALL STORM PIPE AND SANITARY SEWER PIPE SHALL BE TO THE CITY OF REXBURG STANDARDS. 13.THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ANY AND ALL DAMAGES CAUSED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. 14.THE CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE FACILITIES WITHIN THE CONSTRUCTION AREA UNTIL THE DRAINAGE IMPROVEMENTS ARE IN PLACE AND FUNCTIONING. 15.ALL CONTRACTORS WORKING WITHIN THE PROJECT BOUNDARIES ARE RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE SAFETY LAWS OF ANY JURISDICTIONAL BODY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BARRICADES, SAFETY DEVICES AND CONTROL OF TRAFFIC WITHIN AND AROUND THE CONSTRUCTION AREA. 16.THE CONTRACTOR SHALL KEEP ON SITE AT ALL TIMES A COPY OF THE APPROVED CONSTRUCTION PLANS ON WHICH IS RECORDED THE ACTUAL LOCATIONS OF THE CONSTRUCTED UTILITIES AND ANY OTHER UTILITIES ENCOUNTERED. THE CONTRACTOR SHALL PROVIDE THESE LOCATIONS TO THE DESIGN ENGINEER. 17.THE CONTRACTOR(S) SHALL REMOVE ALL OBSTRUCTIONS, BOTH ABOVE AND BELOW GROUND, AS REQUIRED FOR THE CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. THIS SHALL INCLUDE CLEARING AND GRUBBING WHICH CONSISTS OF CLEARING THE GROUND SURFACE OF ALL TREES, STUMPS, BRUSH, UNDERGROWTH, HEDGES, HEAVY GROWTH OF GRASS OR WEEDS, FENCES, STRUCTURES, DEBRIS, RUBBISH, AND SUCH MATERIAL WHICH IN THE OPINION OF THE ENGINEER, IS UNSUITABLE FOR THE FOUNDATION OF PAVEMENTS. ALL MATERIAL NOT SUITABLE FOR FUTURE USE ON SITE SHALL BE DISPOSED OF OFF SITE. 18.CONTRACTOR IS REQUIRED TO CALL DIG LINE OF IDAHO 1-800-342-1585 AT LEAST (2) BUSINESS DAYS PRIOR TO CONSTRUCTION, TO DETERMINE LOCATION OF UNDERGROUND UTILITIES. 19.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL RECOMMENDATIONS WITHIN THE GEOTECHNICAL REPORT. 20.GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF WORK AND BETWEEN TRADES. SUB-CONTRACTORS ARE ALSO RESPONSIBLE FOR COORDINATION WITH OTHER TRADES AND DISCIPLINES INCLUDED IN THE CONTRACT DOCUMENTS. IF ANY DISCREPANCIES ARE FOUND, THE GENERAL CONTRACTOR IS TO NOTIFY ENGINEER IMMEDIATELY BEFORE COMMENCEMENT OF WORK. NO EXTRA COSTS TO THE PROJECT WILL BE INCURRED DUE TO FAILURE OF GENERAL CONTRACTOR AND/OR SUB-CONTRACTORS TO REVIEW CONTRACT DOCUMENTS AND COORDINATE WITH OTHER TRADES. 21.ALL TRAFFIC CONTROL SHALL CONFORM TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND CITY STANDARDS. 22.THE CONTRACTOR MUST OBTAIN A PERMIT FROM THE BUILDING DEPARTMENT FOR ANY WALLS GREATER THAN 4' IN HEIGHT CONSTRUCTED WITHIN THE PROJECT. ALL ROCK WALLS CONSTRUCTED WITHIN THE PROJECT MUST BE CERTIFIED AND INSPECTED BY A LICENSED ENGINEER PRIOR TO THE CITY'S FINAL ACCEPTANCE. 1.THE WATER LINE CONSTRUCTION SHALL CONFORM TO REXBURG STANDARD DRAWINGS & SPECIFICATIONS AND THE DEPARTMENT OF ENVIRONMENTAL QUALITY REGULATIONS OF PUBLIC DRINKING WATER SYSTEMS AND DISINFECTION SPECIFICATIONS SHOULD BE TO ANSI/AWWA C 651-92: DISINFECTION OF WATER MAINS STANDARDS. 2.THE CONTRACTOR SHALL MAINTAIN 10' HORIZ. AND 18'' VERT. SEPARATION BETWEEN WATER AND NON-POTABLE LINES. WATER SEWER 1.ALL SANITARY SEWER PIPE SHALL BE TO THE PROJECT STANDARDS. 2.CONTRACTOR SHALL INSTALL ALL SANITARY SEWER MAINS AND SERVICE LINES PRIOR TO INSTALLING ANY WATER SYSTEM IMPROVEMENTS. ADJUST WATER LINES AS PER PLANS TO MAINTAIN SEPARATION OF MAIN LINES AND TO AVOID SANITARY SEWER SERVICE LINES. 3.THE CONTRACTOR SHALL MAINTAIN 10' HORIZ. AND 18'' VERT. SEPARATION BETWEEN WATER AND NON-POTABLE LINES. 4.ALL NEW AND EXISTING SEWER SYSTEMS WILL BE MANDREL AND AIR TESTED. 5.ALL REMOVED EXISTING SEWER OR WATER UTILITIES SHALL EITHER BE SALVAGED OR PROPERLY DISPOSED OF ACCORDING TO GOVERNING REGULATIONS. 6.SEWER LATERALS MAY EITHER BE COMPLETELY REMOVED OR ABANDONED IN PLACE. LATERALS TO BE REMOVED SHALL BE CUT AT THE MAIN AND CAPPED ON BOTH ENDS AS INDICATED IN NOTE 6 ABOVE. A.HORROCKS ENGINEERS HAS PREPARED GRADING PLANS AND SIZED DRAINAGE FACILITY SHOWN ON THIS PLAN TO CONTAIN THE RUNOFF FROM THE CITY OF REXBURG SPECIFIED DESIGN STORM EVENT FOR THE PROPOSED SITE. ONLY. B.ALL IMPORTED STRUCTURAL FILL, IF REQUIRED, SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO DELIVERY TO THE SITE C.THE GRADING AND DRAINAGE PLANS DO NOT IDENTIFY THE CONSTRUCTION METHODS, EQUIPMENT, PROCEDURES, AND OR SEQUENCING TO BE EMPLOYED BY THE CONTRACTOR. ALL GRADING OPERATIONS INCLUDING BUT NOT LIMITED TO SITE PREPARATION, SCARIFICATION, EXCAVATION, OVER-EXCAVATION, PLACEMENT OF FILLS, AND COMPACTION OF FILLS, SHALL BE PERFORMED BY THE CONTRACTOR IN CONFORMANCE WITH THE GEOTECHNICAL REQUIREMENTS FOR THE SITE AND ONSITE FIELD OBSERVATIONS AS REQUIRED BY THE GEOTECHNICAL FIRM. D.IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY HORROCKS IMMEDIATELY IF THERE ARE ANY CONFLICTS BETWEEN THE REQUIREMENTS OF THE GRADING AND DRAINAGE PLANS AND THE REQUIREMENTS OF THE GEOTECHNICAL REPORT OR GEOTECHNICAL FIELD OBSERVATIONS. E.ALL EXCAVATION, GRADING, AND FILL OPERATIONS WITHIN THE BUILDING AREA SHOULD BE OBSERVED BY THE GEOTECHNICAL ENGINEER TO VERIFY SUBSOIL CONDITIONS AND DETERMINE ADEQUACY OF SITE PREPARATION, SUITABILITY OF FILL MATERIALS AND COMPLIANCE WITH COMPACTION REQUIREMENTS. F.THE CONTRACTOR SHALL PROVIDE SUITABLE METHODS & EQUIPMENT TO CONTROL DUST AND AIR POLLUTION CAUSED BY CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL ALSO PROVIDE SUITABLE MUD AND DIRT CONTAINMENT TO MAINTAIN THE WORK SITE. ACCESS ROADWAYS AND ADJACENT PROPERTIES IN A CLEAN CONDITION. G.ALL EXCAVATION AND GRADING SHALL BE IN ACCORDANCE WITH THE CURRENT REQUIREMENTS OF IDAHO CITY CODES, UNIFORM BUILDING CODES, AND THE GEOTECHNICAL INVESTIGATION STUDY. H.THE GEOTECHNICAL ENGINEER SHALL PROVIDE A FINAL GRADING REPORT TO CONFIRM WORK HAS BEEN PERFORMED IN CONFORMANCE WITH THEIR RECOMMENDATIONS. GRADING & DRAINAGE NOTES 3/4'' W 3/4'' W 1'' W 1'' W 2'' W 2'' W 3'' W 3'' W 4'' W 4'' W 6'' W 6'' W 8'' W 8'' W WATER PROPOSEDEXISTING W W A ALGEBRAIC GRADE CHANGE ABC AGGREGATE BASE COURSE AC ASPHALTIC CEMENT OR CONCRETE BC BUILDING CORNER BCR BACK OF CURB RETURN BFE BASE FLOOD ELEVATION BFF BASEMENT FINISH FLOOR ELEVATION BLDG BUILDING BM BENCHMARK BP BEGIN POINT BV BUTTERFLY VALVE BVC BEGIN VERTICAL CURVE BVCE BEGIN VERTICAL CURVE ELEVATION BVCS BEGIN VERTICAL CURVE STATION BVP BEGIN VERTICAL PROFILE BVW BOTTOM OF VISIBLE WALL C&G CURB & GUTTER CL CENTERLINE CB CATCH BASIN CLR CLEAR CO CLEANOUT CONC CONCRETE Cu COPPER C.Y.CYCUBIC YARD DIA DIAMETER DIP DUCTILE IRON PIPE DWG DRAWING E EAST OR EASTING EA EACH EL ELEVATION EOC EDGE OF CONCRETE EOP EDGE OF PAVEMENT EP END POINT ESMT EASEMENT EVC END VERTICAL CURVE EVCE END VERTICAL CURVE ELEVATION EVCS END VERTICAL CURVE STATION EVP END VERTICAL PROFILE EX EXISTING FF FINISHED FLOOR ELEVATION FE FLANGE END FG FINISHED GRADE ELEVATION FL FLOW LINE FJ FLANGE JOINT FM FORCE MAIN FPS FEET PER SECOND FT FOOT OR FEET FUT FUTURE G GAS LINE GB GRADE BREAK GFF GARAGE FINISHED FLOOR ELEVATION GV GATE VALVE HGL HYDRAULIC GRADE LINE HRZ HORIZONTAL HP HIGH POINT HWM HIGH WATER MARK ID INSIDE DIAMETER IN INCH(ES) IRR IRRIGATION (PRESSURIZED)/ NON-POTABLE K VERTICAL CURVE COEFFICIENT L LENGTH LF LINEAR FEET L/S LANDSCAPE LP LOW POINT LT LEFT MAX MAXIMUM MFR MANUFACTURER MGD MILLION GALLONS PER DAY MID MIDDLE MH MANHOLE MIN MINIMUM MJ MECHANICAL JOINT N NORTH OR NORTHING, FRICTION FACTOR N/A NOT APPLICABLE NTS NOT TO SCALE OC ON CENTER OD OUTSIDE DIAMETER OVHP OVERALL HIGH POINT OVLP OVERALL LOW POINT PC POINT OF CURVE PCC POINT OF COMPOUND CURVE PH PHASE PI POINT OF INTERSECTION PL PROPERTY LINE PRC POINT OF REVERSE CURVE PT POINT OF TANGENCY PUE PUBLIC UTILITY EASEMENT PVC POLYVINYL CHLORIDE PVI POINT OF VERTICAL INTERSECTION Q RATE OF FLOW R RADIUS R/W RIGHT OF WAY REV REVISION RT RIGHT S SLOPE S/W SIDEWALK SD STORM DRAIN SDMH STORM DRAIN MANHOLE SEC SECTION SPEC SPECIFICATIONS SSMH SANITARY SEWER MANHOLE SS SANITARY SEWER S/L STREETLIGHT STA STATION STD STANDARD SVE SIGHT VISIBILITY EASEMENT TBM TEMPORARY BENCH MARK TC TOP OF CONCRETE TBC TOP BACK OF CURB TEMP TEMPORARY TA TOP OF ASPHALT TF TOP OF FOOTING TG TOP OF GRATE TRW TOP OF RETAINING WALL TW TOP OF WALL TYP TYPICAL UTC UNTREATED BASE COURSE V VELOCITY VC VERTICAL CURVE VRT VERTICAL WTR WATER W/WITH MATCHLINE STA. XX+XX.XX SEE SHEET PP-XX UNKNOWN 18'' W 18'' W 24'' W 24'' W 30'' W 30'' W 36'' W 36'' W EXISTING PROPOSED ELECTRICAL MANHOLE # PROPOSED BUILDING FINISHED FLOOR ELEVATION PARKING STALL COUNT PROPOSED TBC SPOT ELEVATION (@ PC'S, PT'S & PL PROPOSED EOP SPOT ELEVATION (@ EDGE OF 75.19 75.19 FFE: XXXX.XX ABBREVIATIONSSTANDARD SYMBOLSHATCH PATTERNS SURFACE FEATURES BUILDING / PAD CONCRETE SIDEWALK / FLATWORK POOL DECK XERISCAPE HEAVY DUTY PAVEMENT SECTION LIGHT DUTY PAVEMENT SECTION RIPRAP CALLOUTS CONSTRUCTION KEYNOTE TAGS DETAIL REFERENCE 1-1/2'' W 1-1/2'' W SCALE: X - DETAIL NAME NTS ADA ACCESS RAMP TRUNCATED DOMES GRAVEL LANDSCAPE AREAS / GRASS 35 D00 OR DEMO PLAN OR GRADING PLAN OR SITE PLAN OR WATER OR SEWER OR STORM DRAIN OR IRRIGATION OR CABLE TV OR TELEPHONE OR GAS OR MISCELLANEOUS 66 36 81 51 91 94 97 A 01 G1 G9 D99 50 65 80 90 93 96 99 Z 00 00OR POWER FO TV T E JB IR PP W W S SD W E T FO IR W G G TV T W W CO SD TP BH fo tv t jb ir pp s w e t fo ir w g g tv tb co e sd FIBER OPTIC MANHOLE TELEPHONE MANHOLE CABLE TV MANHOLE ELECTRICAL POWER POLE SIGNAL POLE ELECTRICAL BOX FIBER OPTIC BOX JUNCTION BOX TELEPHONE BOX TELEPHONE PEDESTAL CABLE TV BOX LIGHT POLE LIGHT POLE OPT 2 LIGHT POLE OPT 3 GAS MANHOLE GAS METER CLEANOUT SEWER MANHOLE IRRIGATION MANHOLE IRRIGATION BOX WATER MANHOLE WATER METER FIRE HYDRANT FIRE HYDRANT OPT 2 GATE VALVE GATE VALVE OPT 2 CROSS TEE 90° BEND 45° BEND 22.5° BEND 11.25° BEND WYE REDUCER CAP & PLUG STORM DRAIN MANHOLE AREA DRAIN ROUND AREA DRAIN SQUARE DROP INLET CURB INLET CURB INLET OPT 2 CURB INLET OPT 3 CURB DOUBLE INLET CURB DOUBLE INLET OPT 2 COMBO BOX OIL/WATER SAND/GREASE OIL/WATER SAND/GREASE OPT 2 FLARED END LARGE FLARED END SMALL SIGN BOLLARD BORE HOLE TEST PIT SD TP BH DECORATIVE BRICK / SIDEWALK / FLATWORK / LANDSCAPE AREAS 10'' W 10'' W 12'' W 12'' W 14'' W 14'' W 16'' W 16'' W 48'' W 48'' W 60'' W 60'' W 72'' W 72'' W 3/4 INCH 1 INCH 1-1/2 INCH 2 INCH 3 INCH 4 INCH 6 INCH 8 INCH 10 INCH 12 INCH 14 INCH 16 INCH 18 INCH 24 INCH 30 INCH 36 INCH 48 INCH 60 INCH 72 INCH 4'' SD 4'' SD 6'' SD 6'' SD 10'' SD 10'' SD 12'' SD 12'' SD 15'' SD 15'' SD 16'' SD 16'' SD 18'' SD 18'' SD STORM PROPOSEDEXISTING SD SDUNKNOWN 48'' SD 48'' SD 54'' SD 54'' SD 60'' SD 60'' SD 66'' SD 66'' SD 8'' SD 8'' SD 24'' SD 24'' SD 30'' SD 30'' SD 36'' SD 36'' SD 42'' SD 42'' SD 72'' SD 72'' SD 4 INCH 6 INCH 8 INCH 10 INCH 12 INCH 15 INCH 16 INCH 18 INCH 24 INCH 30 INCH 36 INCH 42 INCH 48 INCH 54 INCH 60 INCH 66 INCH 72 INCH 4'' SS 4'' SS 6'' SS 6'' SS 10'' SS 10'' SS 12'' SS 12'' SS 14'' SS 14'' SS 15'' SS 15'' SS 16'' SS 16'' SS SEWER PROPOSEDEXISTING SS SSUNKNOWN 8'' SS 8'' SS 18'' SS 18'' SS 24'' SS 24'' SS 30'' SS 30'' SS 36'' SS 36'' SS 4 INCH 6 INCH 8 INCH 10 INCH 12 INCH 15 INCH 16 INCH 18 INCH 24 INCH 30 INCH 36 INCH 14 INCH SSSERVICE LATERAL 1'' IRR 1'' IRR 2'' IRR 2'' IRR 6'' IRR 6'' IRR 8'' IRR 8'' IRR 10'' IRR 10'' IRR 12'' IRR 12'' IRR IRRIGATION PROPOSEDEXISTING IRR IRRUNKNOWN 4'' IRR 4'' IRR 1 INCH 2 INCH 4 INCH 6 INCH 8 INCH 10 INCH 12 INCH 18 INCH 24 INCH 30 INCH 36 INCH BEL BEL 2'' BEL 2'' BEL 4'' BEL 4'' BEL 6'' BEL 6'' BEL 8'' BEL 8'' BEL 10'' BEL 10'' BEL A-1/0 A-1/0 A-1/0 POWER PROPOSEDEXISTING OHP OHPOVERHEAD 3'' BEL 3'' BEL A-4/0 A-4/0 A-4/0 B-1/0 B-1/0 B-4/0 B-4/0 B-4/0 C-1/0 C-1/0 UNDERGROUND 2 INCH 3 INCH 4 INCH 6 INCH 10 INCH 1 PH A 1/0 1 PH A 4/0 1 PH B 1/0 1 PH B 4/0 1 PH C 1/0 8 INCH SERVICE LATERAL SERVICE LATERAL C-4/0 C-4/0 ABC-4/0 ABC-4/0 ABC-750 SEC SEC SL SL SL A-1/0A-1/0A-1/0 A-4/0A-4/0A-4/0 B-1/0B-1/0 B-4/0B-4/0B-4/0 C-1/0C-1/0 C-4/0C-4/0 ABC-4/0ABC-4/0 ABC-750 SECSEC SLSLSL 1 PH C 4/0 3 PH ABC 4/0 3 PH ABC 750A SECONDARY STREET LIGHT BCTV BCTV BFO BFO TEL TEL BTEL BTEL COMMUNICATIONS PROPOSEDEXISTING CTV CTVOVERHEAD CABLE TV FO FO UNDERGROUND CABLE TV OVERHEAD FIBER OPTIC UNDERGROUNG FIBER OPTIC ctv ctv OVERHEAD TELEPHONE UNDERGROUND TELEPHONE 1'' G 1'' G 2'' G 2'' G 6'' G 6'' G 8'' G 8'' G 12'' G 12'' G GAS PROPOSEDEXISTING G GUNKNOWN 4'' G 4'' G 1 INCH 2 INCH 4 INCH 6 INCH 8 INCH 12 INCH 3 INCH HPG HPGHIGH PRESSURE LD LDLAND DRAIN FILL FILL LOD LOD GB GB GB HWM HWM 1YR HWM 5YR HWM 10YR CUT CUT CUT HWM 25YR HWM 50YR HWM 100YR X X X X X CUT LINE FILL LINE LIMITS OF DISTURBANCE DITCH GRADE BREAK HIGH WATER MARK HIGH WATER MARK - 1 YEAR EVENT HIGH WATER MARK - 5 YEAR EVENT HIGH WATER MARK - 10 YEAR EVENT HIGH WATER MARK - 25 YEAR EVENT HIGH WATER MARK - 50 YEAR EVENT HIGH WATER MARK - 100 YEAR EVENT FENCE - BARBED FENCE - CHAIN LINK FENCE - DECORATIVE FENCE - WOOD WALL - BLOCK WALL - PANEL WALL - ROCK R/W RIGHT OF WAY WALL - CONCRETE CENTERLINE (ROAD/ENTITY) CURB & GUTTER PARCEL LINE PROPERTY BOUNDARY 10' PUBLIC UTILITY & DRAINAGE EASEMENT (P.U.E.) JUT TOP TOP TOP >>> MISCELLANEOUS PROPOSEDEXISTING DEMO TOE TOE UNKNOWN PIPE JOINT UTILITY TRENCH TOE OF SLOPE TOP OF SLOPE DIRECTIONAL FLOWLINE GUARDRAIL RAILROAD TRACKS EDGE OF PAVEMENT top top top toe toe PAINT STRIPE - SOLID PAINT STRIPE - DOUBLE SOLID PAINT STRIPE - BROKEN PAINT STRIPE - BIKE LANE INTERSECTION PAINT STRIPE - LANE DROP PAINT STRIPE - LANE LINE EXTENSION FUT FUT LTG LTG PED PED DET DET EXISTING/PROPOSED TRAFFIC SIGNAL - DETECTION CONDUIT PWR PWR SIG SIG TRAFFIC SIGNAL - FUTURE CONDUIT TRAFFIC SIGNAL - LIGHTING CONDUIT TRAFFIC SIGNAL - PEDESTRIAN CONDUIT TRAFFIC SIGNAL - POWER SOURCE CONDUIT TRAFFIC SIGNAL - SIGNAL CONDUIT 4000 4002 4000 4002 CONTOUR - MAJOR CONTOUR - MINOR 2'' BEL 2'' BEL 4'' BEL 4'' BEL 6'' BEL 6'' BEL 8'' BEL 8'' BEL 10'' BEL 10'' BEL 3'' BEL 3'' BEL H:\!2018\ID-1174-1805 D.L. Evans 2nd East (Rexburg)\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\ID-1174-1805_03_LEGEND.dwg - C.0.3 LEGEND - 3/02/2020 08:03am, cadenf 1 5 RE V I S I O N S RE V # DA T E DR A W I N G I N F O DA T E DE S I G N E D DR A W N *S E E G E N E R A L N O T E S S H E E T WA R N I N G 0 1 2 IF T H I S B A R D O E S N O T ME A S U R E 2 " T H E N DR A W I N G I S N O T T O S C A L E ww w . h o r r o c k s . c o m PAGE C PR O J E C T CH E C K E D D B A # 2 3 4 90 1 P i e r V i e w D r . , S u i t e 2 0 5 Id a h o F a l l s , I D 8 3 4 0 2 (2 0 8 ) 5 2 2 - 1 2 2 3 PRELIMINARY NOT FOR CONSTRUCTION CI T Y R E V I E W S E T 28 J A N 2 0 2 0 1 28 F E B 2 0 2 0 2 ID - 1 1 7 4 - 1 8 0 5 LT S CJ F CJ F 20 D E C 2 0 1 9 LE G E N D D. L . E V A N S B A N K NN A N O R T H 2 N D E A S T , RE X B U R G , I D A H O 8 3 4 4 0 3 C.1.2 s fopp e e e e tv tb w pp t e w w w w w w w w w w w w w w w w w w w w w w w w ABS ID-O, LLC DEED INSTR #381561 PASCORE, INC. DEED INSTR #249975 HG PARTNERS, LLC DEED INSTR #401811 HG PARTNERS, LLC DEED INSTR #401811 PA C I F I C O R P E A S E M E N T DE E D I N S T R # 2 4 4 4 9 8 PA C I F I C O R P E A S E M E N T DE E D I N S T R # 2 4 4 4 9 8 PARCEL OF LAND LOCATED IN SECTION 20, TOWNSHIP 6N, RANGE 40E, BOISE MERIDIAN, MADISON COUNTY, IDAHO PROPOSED LOT 0.636 AC 10' 4 1 . 7 ' 1.5' 5 2 . 8 6 ' 1.5' 4 3 . 1 9 ' 27'6.2' N 2 N D E A S T S T R E E T / H W Y 3 3 N 2 N D E A S T S T R E E T / H W Y 3 3 EX SIGNALIZED APPROACH 48 7 2 . 0 487 1 . 0 48 7 1 . 0 4 8 7 1 . 0 48 7 2 . 0 48 7 1 . 0 48 7 1 . 0 48 7 2 . 0 487 3 . 0 4 8 7 1 . 0 4 8 7 2 . 0 48 7 2 . 0 48 7 2 . 0 48 7 3 . 0 487 3 . 0 48 7 2 . 0 48 7 1 . 5 48 7 1 . 0 4870.0 4869.0 48 7 0 . 0 48 7 2 . 5 4 8 7 2 . 5 48 7 2 . 5 4871 . 5 4 8 7 1 . 5 487 2 . 5 48 7 2 . 5 48 7 0 . 5 48 7 0 . 5 4 8 7 1 . 5 487 2 . 5 487 2 . 5 48 7 0 . 5 4870.5 48 7 0 . 5 4869.5 S89°34'21"W 92.50' N 4 1 ° 3 1 ' 0 1 " W 2 8 . 6 7 ' N0 ° 0 8 ' 2 9 " W 17 4 . 9 5 ' S43 ° 4 8 ' 0 7 " W 48.6 2 ' S0 ° 1 3 ' 4 5 " E 16 1 . 8 1 ' N89°32'13"E 144.94' 0 20'40' SCALE: 1" = 20' 1.CONTRACTOR TO VERIFY ALL UTILITY SIZES, LOCATIONS & ELEVATIONS PRIOR TO ORDERING MATERIALS FOR CONSTRUCTION. 2.ALL SUBSURFACE ITEMS DESIGNATED FOR REMOVAL SHALL BE REPLACED WITH FILL MATERIAL PER PROJECT GEOTECHNICAL REPORT. SAID MATERIAL SHALL BE COMPACTED PER SPECIFICATIONS SET FORTH IN PROJECT GEOTECHNICAL REPORT BY MTI, FILE NUMBER E180207G AND DATED 10-11-2018. 3.CONTOURS ARE SHOWN AT 0.5' and 1' INTERVALS. SHEET NOTES: DEMOLITION/EXISTING KEY NOTES: EXISTING SIDEWALK (PROTECT IN PLACE) EXISTING LIGHT POLE (PROTECT IN PLACE) EXISTING POWER POLE (PROTECT IN PLACE) EXISTING SANITARY SEWER MANHOLE (PROTECT IN PLACE) EXISTING 8" SANITARY SEWER MAIN (PROTECT IN PLACE) EXISTING UNDERGROUND TELEPHONE CABLE (PROTECT IN PLACE) EXISTING UNDERGROUND ELECTRIC CABLE (PROTECT IN PLACE) EXISTING UNDERGROUND FIBER OPTIC CABLE (PROTECT IN PLACE) EXISTING UNDERGROUND TV CABLE (PROTECT IN PLACE) EXISTING OVERHEAD POWER CABLE (PROTECT IN PLACE) EXISTING CURB & GUTTER (PROTECT IN PLACE) EXISTING ASPHALT (PROTECT IN PLACE) EXISTING ASPHALT (TO BE REMOVED) EXISTING CURB & GUTTER (TO BE REMOVED) EXISTING CURB & GUTTER (TO BE REMOVED & REPLACED) EXISTING FIRE HYDRANT, WATER VALVE, WATER METER (PROTECT IN PLACE) EXISTING LANDSCAPE ISLAND & CURBING (TO BE REMOVED) EXISTING WATER MAIN (PROTECT IN PLACE) EXISTING FENCE (PROTECT IN PLACE) EXISTING TREE (TO BE REMOVED) EXISTING RETAINING WALL (PROTECT IN PLACE) SURVEY NOTE: THIS SITE PLAN CONFORMS TO AN ACTUAL SURVEY THAT WAS PERFORMED ON THE GROUND BY A LICENSED LAND SURVEYOR IN AND FOR THE STATE OF IDAHO. IT IS THE OWNER'S RESPONSIBILITY TO CONSTRUCT ALL STRUCTURES SHOWN ON THIS SITE PLAN IN ACCORDANANCE WITH SAID SURVEY. BENCHMARK: BM#1 ELEV: 4871.46' N:791240.3293' E: 758958.7957' FOUND: PK & WASHER BM#2 ELEV:4870.88' N: 791402.3408' E: 758958.1883' FOUND: PK & WASHER BM#3 ELEV:4872.39' N: 791437.1284' E: 758991.4898' FOUND: 1\2" REBAR PLS 12457 BM#4 ELEV: 4872.16' N: 791437.8380' E: 759084.1026' FOUND: 1\2" REBAR PLS 12458 BM#5 ELEV:4871.83' N: 791416.6038' E: 759103.0743' FOUND: 1\2" REBAR PLS 12459 BM#6 ELEV: 4871.06' N: 791241.4558' E: 759103.7384' FOUND: 1\2" REBAR PLS 12460 D01 D02 D03 D04 D05 D06 D07 D08 D09 D10 D11 D12 D13 BM # H:\!2018\ID-1174-1805 D.L. Evans 2nd East (Rexburg)\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\ID-1174-1805_04_EXISTING.dwg - C.2.0 OVERALL EXISTING CONDITIONS & DEMO PLAN - 3/02/2020 08:04am, cadenf 1 5 RE V I S I O N S RE V # DA T E DR A W I N G I N F O DA T E DE S I G N E D DR A W N *S E E G E N E R A L N O T E S S H E E T WA R N I N G 0 1 2 IF T H I S B A R D O E S N O T ME A S U R E 2 " T H E N DR A W I N G I S N O T T O S C A L E ww w . h o r r o c k s . c o m PAGE C PR O J E C T CH E C K E D D B A # 2 3 4 90 1 P i e r V i e w D r . , S u i t e 2 0 5 Id a h o F a l l s , I D 8 3 4 0 2 (2 0 8 ) 5 2 2 - 1 2 2 3 PRELIMINARY NOT FOR CONSTRUCTION CI T Y R E V I E W S E T 28 J A N 2 0 2 0 1 28 F E B 2 0 2 0 2 ID - 1 1 7 4 - 1 8 0 5 LT S CJ F CJ F 20 D E C 2 0 1 9 OV E R A L L E X I S T I N G C O N D I T I O N S & D E M O P L A N D. L . E V A N S B A N K NN A N O R T H 2 N D E A S T , RE X B U R G , I D A H O 8 3 4 4 0 4 C.2.0 H O R R O C K S E N G I N E E R SN D11 D02 D01 D07 D07 D07 D03 D08 D07 D09 D05 D04 D13 D06 D13 D13 432 SF 79 SF 65 SF D14 D15 D11 D11 D11 D01 D10 D14 D11 D15 D11 D14 D07 D09 D03 D16 D17 D18 D19 D16 D17 D17 D18 D18 D19 D19 D11 D11 D11 D11 D11 D11 D05 D01 D01 D02 D20 D20 D21 D21 D16 D16 BM #1 BM #6 BM #5 BM #4BM #3 BM #2 fopp e e e e tv tb fopp e e e e tv tb 16.3' 12.2'2 0 ' T Y P . 10' TYP. THIS ROW 100' 9' TYP. THIS ROW 71' 2 0 ' T Y P . 26' 14 1 . 9 ' 9' TYP. 111.4' 22 ' TY P . 1.2' 68 . 7 ' 82.4' 10.8' 18 . 3 ' 1 6 . 5 ' 3.3' 31.2' 31.2' 100' 2 2 . 8 ' 26 ' 18.2' 1 6 . 5 ' 1 6 . 5 ' 11.6' 11.7' 2.2' 1 5 ' 1 4 . 7 ' 6.5' 11.7' 8' 9. 3 '4.5' R 8 ' R3' R 8 'R10 ' R 3 ' 6.5'8'6.5' 6 ' 6 ' 6 ' 6 ' 6'5.5' R3 ' R 1 0 ' 14.7'42.5'25.2' 3 7 . 5 ' 3 7 . 5 ' 41.7'42.5'27.2' R3' R8' 4 . 1 ' 1 2 . 2 ' 2 1 . 3 ' 5.6'5.7' 1 . 8 ' 1 0 . 8 ' 6 . 5 ' 9.1' 9.1'5' 4.5' 6 . 6 ' 6 ' 6 ' 7 ' 1 0 ' 5 2 . 7 ' 4 3 . 7 ' 9 1 . 2 ' 17' 7 . 8 ' 18.2' R10 ' R6' 3 7 . 5 ' 2 6 ' 3 ' 3 ' 12' 7.1' 5' 10.1' 9' 5 6 . 7 ' 76.2' 18.2' 3.7' 1 0 ' 1 6 . 3 ' 1 6 . 3 ' R2'R2' ss 7 . 8 ' 4 1 . 7 ' 10' tv tb tv tb 19.9' 2 7 . 1 ' 42.8' 42.3' 6 . 4 ' 105.4' 4 1 . 1 ' SNOW STORAGE AREA = 1,511 SF H O R R O C K S E N G I N E E R SN 0 10'20' 1" = 10' H:\!2018\ID-1174-1805 D.L. Evans 2nd East (Rexburg)\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\ID-1174-1805_05_SITE PLAN AND DETAILS.dwg - C.3.0 SITE PLAN - 3/02/2020 08:04am, cadenf 1 5 RE V I S I O N S RE V # DA T E DR A W I N G I N F O DA T E DE S I G N E D DR A W N *S E E G E N E R A L N O T E S S H E E T WA R N I N G 0 1 2 IF T H I S B A R D O E S N O T ME A S U R E 2 " T H E N DR A W I N G I S N O T T O S C A L E ww w . h o r r o c k s . c o m PAGE C PR O J E C T CH E C K E D D B A # 2 3 4 90 1 P i e r V i e w D r . , S u i t e 2 0 5 Id a h o F a l l s , I D 8 3 4 0 2 (2 0 8 ) 5 2 2 - 1 2 2 3 PRELIMINARY NOT FOR CONSTRUCTION CI T Y R E V I E W S E T 28 J A N 2 0 2 0 1 28 F E B 2 0 2 0 2 ID - 1 1 7 4 - 1 8 0 5 LT S CJ F CJ F 20 D E C 2 0 1 9 SI T E P L A N D. L . E V A N S B A N K NN A N O R T H 2 N D E A S T , RE X B U R G , I D A H O 8 3 4 4 0 5 C.3.0 CURB RAMP W/ TRUNCATED DOMES PER CITY OF REXBURG STANDARDS ADA ACCESSIBLE PARKING STALL, DIMENSIONS PER PLAN UNLESS OTHERWISE NOTED ADA HANDICAP SIGN SEE DETAIL 3 THIS SHEET. SIGNS TO BE PLACED ON BUILDING OR MOUNTED ON STAIR POSTS WHERE AVAILABLE TRASH ENCLOSURE SEE ARCHITECTURAL PLANS FOR DETAILS 1.5' FLAT PAN CURB & GUTTER SEE DETAIL 1 THIS SHEET 4" THICK SIDEWALK. WIDTH VARIES PER ISPWC SD-709, SD-714, SD-714A & SD-714B LANDSCAPED AREA, SEE LANDSCAPE PLAN MODERATE DUTY ASPHALT, SEE TABLE THIS SHEET ALL STRIPING PER MUTCD STANDARDS MONUMENT SIGN, SEE ARCHITECTURAL PLANS FOR DETAILS STAMPED CONCRETE PATHWAY SEE ARCHITECTURAL PLANS FOR DETAILS SNOW STORAGE AREA (SEE LANDSCAPE TABLE FOR AREA) SEE DETAIL 4 THIS SHEET SIGN & LIGHT LOCATIONS (REFER TO ARCHITECTURAL AND ELECTRICAL PLANS FOR DETAILS) SIGNS SHOWN IN APPROXIMATE LOCATION (SIGNS N.I.C) INSTALL PORTLAND CEMENT CONCRETE PAVEMENT SEE PAVEMENT SECTION SUMMARY THIS SHEET ELECTRICAL TRANSFORMER PAD. SEE ELECTRICAL PLANS FOR DETAILS CONCRETE PAD FOR BENCHES. BENCHES PER ARCHITECTURAL PLANS INSTALL "DO NOT ENTER" SIGN PER MUTCD STANDARDS INSTALL CURB TAPER PER ISPWC SD-707 (LENGTH PER PLANS) CONCRETE WHEEL STOPS LOCATED 18" MIN. FROM HEAD OF STALL PER REXBURG STANDARDS SITE PLAN KEY NOTES: LANDSCAPING TABLE *OVERALL SITE LANDSCAPING SITE AREA = 27,732 SF TOTAL LANDSCAPING = 6,596 SF (23.8% OF SITE) TOTAL HARDSCAPE = 18,907 SF (68.2% OF SITE) TOTAL SNOW REMOVAL AREA = 14,930 SF (53.8% OF SITE) TOTAL SNOW STORAGE = 1,511 SF (10.1% OF PLOW-ABLE HARDSCAPE ) PARKING COUNT LOCATION MINIMUM REQUIRED PROVIDED CITY REQUIRED ONSITE PARKING 12 23 ALBERTSON'S REQUIRED ONSITE PARKING 22 23 TOTAL 22 STALLS 23 STALLS *MINIMUM BUSINESS/FINANCE USE REQUIRED PARKING CALCULATION= (3 STALLS PER 1,000 GROSS SQ FT) = (3,977 SQ FT / 1000) * 3 = 11.93 STALLS *MINIMUM BUSINESS/FINANCE USE REQUIRED PARKING PER ALBERTSONS = (5.5 STALLS PER 1,000 GROSS SQ FT) = (3,944 SQ FT / 1000) * 5.5 = 21.69 STALLS - MATERIAL SPECIFICATIONS: ASPHALTIC CONCRETE:ASPHALT MIX SHALL MEET THE REQUIREMENTS OF THE ISPWC, SECTION 59 CLASS III PLANT MIX. MATERIALS SHALL BE PLACED IN ACCORDANCE WITH ISPWC STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. AGGREGATE BASE:MATERIAL COMPLYING WITH ISPWC STANDARDS FOR CRUSHED AGGREGATE MATERIALS STRUCTURAL SUBBASE:GRANULAR STRUCTURAL FILL MATERIAL COMPLYING WITH THE REQUIREMENTS DETAILED IN THE THE STRUCTURE FILL SECTION OF THE GEOTECHINCAL REPORT (PREPARED BY MTI DATED 10-11-2018) EXCEPT THAT THE MAXIMUM MATERIAL DIAMETER IS NO MORE THAN 23 THE COMPONENT THICKNESS. GRADATION AND SUITABILITY REQUIREMENTS SHALL BE PER ISPWC SECTION 501, TABLE 1. - IT WILL BE REQUIRED FOR MTI PERSONNEL TO VERIFY SUBGRADE COMPETENCY AT THE TIME OF CONSTRUCTION RIGID PAVEMENT SECTION: THE AASHTO PAVEMENT DESIGN METHOD WAS USED TO DEVELOP THE FOLLOWING RIGID CONCRETE PAVEMENT SECTION. CONCRETE PAVEMENT SHALL BE BATCHED AND CONSTRUCTED IN ACCORDANCE WITH THE MOST CURRENT AMERICAN CONCRETE INSTITUTE STANDARDS AND IN ACCORDANCE WITH IDAHO TRANSPORTATION DEPARTMENT STANDARD DRAWINGS C-1-A AND C-1-B. NATIVE SUBGRADE SOILS ON THE SITE ARE FROST SUSCEPTIBLE, AND THEREFORE, REQUIRE JOINTS SEALERS OR UNDER-DRAINS. MATERIAL SPECIFICATIONS: PORTLAND CEMENT CONCRETE:4,000 PSI CONCRETE WITH A MODULUS OF RUPTURE GREATER THAN 650 PSI GENERALLY COMPLYING WITH ITD REQUIREMENT FOR URBAN CONCRETE. CRUSHED AGGREGATE BASE:MATERIAL COMPLYING WITH ITD STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION SECTION 303 AND 703 FOR AGGREGATES. STRUCTURAL SUBBASE:GRANULAR STRUCTURAL FILL MATERIAL COMPLYING WITH THE REQUIREMENTS DETAILED IN THE THE STRUCTURE FILL SECTION OF THE ORIGINAL GEOTECHINCAL REPORT (PREPARED BY MTI DATED 10-11-2018) EXCEPT THAT THE MAXIMUM MATERIAL DIAMETER IS NO MORE THAN 23 THE COMPONENT THICKNESS. GRADATION AND SUITABILITY REQUIREMENTS SHALL BE PER TABLE 1, ISPWC. - IT WILL BE REQUIRED FOR MTI PERSONNEL TO VERIFY SUBGRADE COMPETENCY AT THE TIME OF CONSTRUCTION PCCP PAVEMENT SECTION SUMMARY PORTLAND CEMENT CONCRETE PAVEMENT 6.0 INCHES CRUSHED AGGREGATE BASE 6.0 INCHES STRUCTURAL SUBBASE NOT REQUIRED COMPACTED SUBGRADE SEE PAVEMENT SUBGRADE PREPARATION SECTION NOTES: RECOMMENDATIONS PER GEOTECHNICAL REPORT PREPARED BY MTI, FILE NUMBER E180207G AND DATED 10-11-2018 PC BUILDING ANALYSIS BUILDING BUILDING AREA TOTAL 3,977 SF MAX BUILDING HEIGHT 22'-0" BUILDING TYPE (VB) *V-B (NO FIRE SPRINKLERS)* NOTES: * BUILDING TYPE TO BE VERIFIED WITH ARCHITECTURAL PLANS, ARCHITECTURAL PLANS TO SUPERCEDE. 2 . 9 ' 7 10 6 3/4" GRAVEL ROAD BASE FIN. GRADE (W/ LIP FLAT) CONC. CURB & GUTTER 3/4'' GRAVEL ROAD BASE ASPHALT PAVEMENT 1. 0 ' 0. 5 ' 0. 5 ' 2''± 4'' 1.5' 0.5' FLAT PAN CURB & GUTTER1 C.3.0 1' 5 5 5 5 5 5 5 5 5 5 5 PC PROPOSED BUILDING N 2 N D E S T N 2 N D E S T TYPICAL HANDICAP SIGN DETAIL NTSC.3.0 3 CAP TOP OF POST 3/5"X3 1/2" CADMIUM PLATED HEX HEAD BOLT WITH FLAT LOCK WASHER AND NUT 6' - 0 " 3" 15 " 6" 12" BLUE BACKGROUND W/ WHITE SYMBOL AND LETTERING PROVIDE SIGN THAT IDENTIFIES ALL VAN ACCESSIBLE STALLS. REFER TO PLAN FOR LOCATIONS NOTE: TOP OF POST TO BE CUT 1/2" BELOW TOP OF SIGN FLEXIBLE PAVEMENT SECTION SUMMARY CLASSIFICATION MODERATE DUTY ASPHALTIC CONCRETE 3.0" CRUSHED AGGREGATE BASE 4.0" STRUCTURAL SUBBASE 12.0" SUBGRADE PREPARATION (MAX LIFT PER GEOTECHNICAL REPORT) SEE PAVEMENT SUBGRADE PREPARATION SECTION NOTES: FLEXIBLE PAVEMENT SPECIFICATIONS ARE PER GEOTECHNICAL REPORT PREPARED BY MTI, FILE NUMBER E180207G AND DATED 10-11-2018 MD 13 13 13 13 18 18 19 SEWER TIE-IN PAVEMENT PATCH 1" = 10'C.3.0 2 SEE DETAIL 2 THIS SHEET 13 13 13 13 5 7 7 7 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 7 7 7 7 7 7 7 7 7 15 9 9 9 9 8 8 8 8 8 2 2 16 1 6 3 3 6 6 10 17 14 14 6 11 4 6 17 SNOW STORAGE AREA 5 INSTALL TRUNCATED DOMES INSTALL TRUNCATED DOMES 18 18 12 12 SNOW STORAGE AREA DETAIL 1" = 10'C.3.0 4 5 2 fopp e e e e tv tb S D SD S D SD S D S S S S 48 7 1 . 0 4871.0 4 8 7 2 . 0 4872.0 487 2 . 5 4873.0 4871.5 48 7 1 . 0 48 7 1 . 5 48 7 1 . 0 48 7 1 . 5 487 1 . 5 4 8 7 1 . 0 4871. 0 4871.5 4871. 5 4871 . 0 4 8 7 1 . 0 4 8 7 1 . 0 487 0 . 5 4871.54872.04873 . 0 4872.5 4 8 7 2 . 0 48 7 1 . 5 4 8 7 1 . 0 4871.5 48 7 1 4 8 7 1 4 8 7 2 4 8 7 3 48 7 1 48 7 1 48 7 2 4 8 7 1 4 8 7 2 48 7 2 487 1 48 7 1 GR A D E BR E A K GR A D E BR E A K GR A D E BR E A K GRADE BREAK G R A D E B R E A K GRADE BREAK GRA D E BRE A K GR A D E BR E A K GR A D E BR E A K GR A D E BR E A K PROPOSED BUILDING 1.0% 1.7% 2.0% 2 . 0 % 2 . 1 % 2 . 5 % 2. 2 % 2. 3 % 2. 3 % 2.3 % 2.3 % 2. 2 % 2.2% 1.8 % 1.9 %1.6 % 1.5 % 1.4 % 1.5% 1.9% 1.6% 2.6 % 1. 5 % 1. 5 % 1. 5 % 3.8%3.6% 2.7 % 1.5% 1.9% 1.7% 2.3% 2.5% 2.2% 4. 4 % 2.2 % 1.0% 1.8% 1.4% 1.8% 1.5 % 1.5 % 1.7 % 1.7 % 1. 4 % 1. 9 % 1 . 5 % 1 . 9 % 1.8% 2.5 % 1.5% 2 . 3 % 2. 1 % 2.8% 4.6% 3.7% 1 . 9 % 1. 5 % 1 . 7 % 1 . 3 % 8.0%6.8% 1. 4 % 1 . 8 % 1. 7 % 1 . 6 % 1. 4 % 1. 3 % 1 . 5 % 1. 7 % 1.5% 1.6% 1. 5 % 1. 3 % 1.1%1.2% 1.5 % 4.0%1.5% 1.5% 1.6% 1.6% 1.7%1.7% 1.8% 1.7% 1. 8 % 2.0 % 0 . 6 % 3 . 2 % 5 . 0 %2.0%3.7 % 1.7% 2.3% 2.1% 1 . 6 % 1. 2 % 3.4 % 6. 2 % 1.4% 1.6% 1.8% 4.9 % 5.1 % 1.2 %1. 7 % 3 . 1 % 3.4 % 1 . 6 % 2.6 % 0.9% 1. 1 % 4. 2 % 6. 2 % 10 . 0 % 8.5 % 6.9% 1.8 % 2. 3 % 0.5% 6.2% 5.7% 5.8% 5.0% 1.2% 1 . 1 % 1.2% 10.2% 14.1% 17.0% 19.7 % 27 . 4 % 30 . 9 % 26 . 7 % 20 . 5 % 14 . 4 % 9.3 % 2 . 3 % 0.0%0.0% 0.9%0.4% 1. 0 % 1. 8 % 1.2% 1. 6 % 5. 0 % 2. 5 % 0. 3 % 2.0% 1. 2 % 0.8%0.1% 2. 0 % 2. 5 % 0.0% 0.0% 2. 7 % 2. 0 % 1. 4 % 0. 1 % 1. 0 % 0. 4 % 0. 6 % 0.6%0.5%0.5%0.5%1.7% 0.0%1.4%0.0%2.5% 1.4 % 1. 7 % 2. 2 % 1.2 % 1 . 2 % 1. 2 % 2. 5 % FFE: 4871.80 GRADE BREAK GRADE BREAK GRADE BREAK TBC: 4871.74 MATCH EXISTING TBC: 4871.63 MATCH EXISTING TBC: 4871.57 MATCH EXISTING TBC: 4871.56 MATCH EXISTING TBC: 4871.54 MATCH EXISTING TBC: 4871.53 MATCH EXISTING TBC: 4871.61 MATCH EXISTING TBC: 4871.61 MATCH EXISTING TBC: 4871.21 MATCH EXISTING TOA: 4871.25 MATCH EXISTING TOA: 4871.14 MATCH EXISTING TOA: 4871.03 MATCH EXISTING TOA: 4870.96 MATCH EXISTING TOA:4871.09 TOA:4871.23 TOA:4871.54TOA:4871.49TOA:4870.98 TOA:4870.77 TOA:4870.86 TOA:4871.05 TOA:4871.14 TOA:4871.32 TOA:4871.40 TOA:4870.85 TOA:4870.62 TOA:4870.39 TOG:4870.30 TOA:4870.75 TOA:4871.00 TOA:4870.94 TOA:4870.93 TOA:4871.05 TOA:4871.14 TOA:4871.16 TOA:4870.89 TOG:4870.36 TOA:4870.36 TOA:4870.72 TOA:4870.97 TOA:4871.01 TOA:4871.03 TOA:4871.07 TOA:4871.11 TOA:4871.15 TOA:4871.17 TOA:4870.84 TOG:4870.45 TOA:4870.49 TOA:4870.54 TOA:4870.65 TOA:4870.97 TOC: 4870.55 TOC: 4871.30TOC: 4871.30 TOC: 4870.55 TOC: 4871.02 TOC: 4871.11 TOC: 4871.11 TOC: 4871.02 TOC: 4870.66 TOC: 4871.39TOC: 4871.39 TOC: 4871.48 TOC: 4871.49 TOC: 4871.05 TOC: 4871.07 TOC: 4871.68 TOC: 4871.43 TOC: 4871.72 TOC: 4871.21TOC: 4871.16 TOC: 4871.60TOC: 4871.60 TOC: 4871.54 TOC: 4871.45 TOC: 4871.65 TOC: 4871.80 TOC: 4871.68 TOC: 4871.80 TOC: 4871.30 TOC: 4871.73 TOC: 4871.80 TOC: 4871.63 TOC: 4871.65TOC: 4871.80 TOC: 4871.80 TOC: 4871.65 TBC: 4871.48 TBC: 4871.99 TBC: 4872.04 TBC: 4871.73 TBC: 4871.59 TBC: 4871.27 TBC: 4871.36 TBC: 4871.55 TBC: 4871.64 TBC: 4871.82 TBC DEP: 4871.42 TBC DEP: 4871.51 TBC: 4871.90 TBC: 4871.54 TBC: 4871.35 TBC: 4871.12 TBC: 4870.89 TBC: 4870.80 TBC: 4871.05 TBC: 4871.16 TBC: 4871.05 TBC: 4870.99 TBC: 4871.25 TBC: 4871.50 TBC: 4871.44TBC: 4871.80TBC: 4871.80 TBC: 4871.43 TBC: 4871.55 TBC: 4871.64 TBC: 4871.66 TBC DEP: 4871.51 TBC DEP: 4871.42 TBC: 4871.39 TBC: 4870.86 TBC: 4870.86 TBC: 4871.22 TBC: 4871.47 TBC: 4871.65 TBC DEP: 4871.14TBC DEP: 4871.09 TBC: 4871.53TBC: 4871.51 TBC: 4871.34 TBC: 4870.95 TBC: 4871.04 TBC: 4870.99 TOG:4870.49 FFE: 4871.80 FFE: 4871.80 FFE: 4871.80 FFE: 4871.80FFE: 4871.80 FFE: 4871.80 FFE: 4871.80FFE: 4871.80 FFE: 4871.80 FFE: 4871.80 FFE: 4871.80 FG: 4871.80 FG: 4871.59 TOC: 4871.61 TOC: 4871.61 TOC: 4871.61 TOC: 4871.61 TOC: 4871.02TOC: 4871.02 TBC: 4871.72TBC: 4871.60 TOA:4871.04 PIER: 4871.80 PIER: 4871.80 PIER: 4871.80 H O R R O C K S E N G I N E E R SN 0 10'20' SCALE: 1" = 10' H:\!2018\ID-1174-1805 D.L. Evans 2nd East (Rexburg)\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\ID-1174-1805_06_GRADING PLAN.dwg - C.4.0 GRADING PLAN - 3/02/2020 08:05am, cadenf 1 5 RE V I S I O N S RE V # DA T E DR A W I N G I N F O DA T E DE S I G N E D DR A W N *S E E G E N E R A L N O T E S S H E E T WA R N I N G 0 1 2 IF T H I S B A R D O E S N O T ME A S U R E 2 " T H E N DR A W I N G I S N O T T O S C A L E ww w . h o r r o c k s . c o m PAGE C PR O J E C T CH E C K E D D B A # 2 3 4 90 1 P i e r V i e w D r . , S u i t e 2 0 5 Id a h o F a l l s , I D 8 3 4 0 2 (2 0 8 ) 5 2 2 - 1 2 2 3 PRELIMINARY NOT FOR CONSTRUCTION CI T Y R E V I E W S E T 28 J A N 2 0 2 0 1 28 F E B 2 0 2 0 2 ID - 1 1 7 4 - 1 8 0 5 LT S CJ F CJ F 20 D E C 2 0 1 9 GR A D I N G P L A N D. L . E V A N S B A N K NN A N O R T H 2 N D E A S T , RE X B U R G , I D A H O 8 3 4 4 0 6 C.4.0 SHEET NOTE: 1. CONTOURS SHOWN AT 0.5' AND 1.0' INTERVALS 2. SEE SHEET C.5.0 FOR DRAINAGE DETAILS N 2 N D E S T s fopp e e e e tv tb w e w w w w w w w w w w w w w w w TOA:4871.23 TOA:4870.87 TOA:4871.42 TOA:4870.90 4871. 0 4871 . 0 48 7 1 . 0 4 8 7 1 . 0 4 8 7 1 . 0 4 8 7 1 . 0 48 7 1 . 0 4872.0 4871.0 4 8 7 1 . 0 4 8 7 1 . 0 48 7 3 . 0 48 7 2 . 0 4 8 7 1 . 0 4870.5 4871.5 48 7 0 . 5 4872.5 4873.0 4871.5 48 7 1 . 5 4871.5 48 7 1 . 5 48 7 1 . 5 4871.5 4 8 7 2 . 5 4871.5 48 7 1 . 0 48 7 2 4 8 7 1 48 7 1 48 7 2 4 8 7 2 48 7 2 4 8 7 1 48 7 1 48 7 3 487 3 S D S D S D SD w w w w w w w w w w w w w w w S S 38LF OF 6" S.D. @ 2.31% 36 L F O F 1 2 " S . D . @ 0 . 2 5 % 85 L F O F 1 2 " S . D . @ 0 . 2 5 % 31LF OF 12" S.D. @ 0.25% 63LF OF 12" S.D. @ 0.25%34LF OF 12" S.D. @ 0.24% 17LF OF 6" S.D. @ 1.24% 76LF OF 12" S.D. @ 1.03% 34LF OF 12" S.D. @ 0.89% 18LF OF 24" S.D. @ 0.00% 24LF OF 6" S.D. @ 0.98% 43 L F O F 4 " S . S . @ 5 . 0 9 % 16LF OF 4" S.S. @ 2.00% 21LF OF 4" S.S. @ 2.00% 12LF OF 4" S.S. @ 2.00% SD TEE-A INV IN: 4867.06 12" (S) INV IN: 4867.06 6" (E) INV OUT: 4867.06 12" (N) SD INLET-C RIM: 4870.30 INV IN: 4867.25 12" (E) INV OUT: 4867.15 12" (N) SD JUNCTION-A RIM: 4871.04 INV IN: 4866.85 12" (S) INV OUT: 4866.75 12" (E) SD RD-2 INV OUT: 4867.94 6" (W) SD INLET-D RIM: 4870.49 INV OUT: 4867.49 12" (W) SD TEE-B INV IN: 4867.41 12" (E) INV IN: 4867.41 6" (N) INV OUT: 4867.41 12" (W) SD RD-3 INV OUT: 4867.62 6" (S) SD INLET-A RIM: 4870.36 INV IN: 4866.67 12" (E) INV IN: 4866.67 12" (W) INV OUT: 4866.57 12" (N) SD S&G-A RIM: 4871.00 INV IN: 4866.27 12" (S) INV OUT: 4865.87 24" (E) SD INLET-B RIM: 4870.45 INV IN: 4867.95 6" (S) INV OUT: 4867.45 12" (W) SD RD-1 INV OUT: 4868.19 6" (N) SS CO - 1 RIM: 4872.46 INV IN: 4862.94 4" (NE) SS PLUG-1 INV OUT: 4865.13 4" (S) FFE 4871.80 PROPOSED BUILDING 52' 25 ' 61LF OF 4" S.S. @ 2.00% WATER KEYNOTES EXISTING DOMESTIC WATER LINE. CONTRACTOR TO FIELD VERIFY EXACT DEPTH AND LOCATION AND NOTIFY ENGINEER OF RECORD OF ANY DISCREPANCIES CONNECT 2" SERVICE LINE TO EXISTING 8" WATER MAIN PER ISPWC SD-402. COORD WITH CITY OF REXBURG AND ITD FOR BORING AND CONNECTION TO EXISTING MAIN LINE INSTALL CAP AND MARKER, SEE PLUMBING PLANS FOR CONTINUATION INSTALL 2" PIPE, LENGTH PER PLANS, MUST MAINTAIN 6' COVER POTABLE & NON-POTABLE VERTICAL LINE CROSSING PER ISPWC SD-407, MINIMUM 1.5' VERTICAL SEPARATION INSTALL 2" GATE VALVE 26 27 28 29 30 31 STORM DRAIN KEYNOTES INSTALL STORM DRAIN CATCH BASIN PER 2010 I.F. STD 700-9 INSTALL STORM DRAIN PIPE, SIZE AND LENGTH PER PLAN INSTALL 12" X 6" TEE INSTALL 6" ROOF DRAIN STUB, SEE ARCHITECTURAL DRAWINGS FOR CONTINUATION INSTALL 30" STORM DRAIN STRUCTURE WITH SOLID CIRCULAR LID INSTALL UNDERGROUND INFILTRATOR, SEE DETAIL 1 & 1A THIS SHEET INSTALL 6" C/O WITH TRAFFIC RATED LID INSTALL 1500 GAL SAND & GREASE TRAP PER ISPWC SD-624 INSTALL MONITORING WELL WITH TRAFFIC RATED LID PER ISPWC SD-627. 51 52 53 54 55 56 57 58 59 GENERAL NOTES: 1.ALL RIMS, VALVE LIDS SHALL BE SET FLUSH TO FINISH SURFACES 2.CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT EXISTING SANITARY SEWER DURING CONSTRUCTION. 3.STORM DRAIN PIPE TO BE SDR 35 FOR 6" PIPE, AND SANITITE HP OR APPROVED EQUAL FOR PIPES 12" AND LARGER, USE OTHER PIPE TYPES WHERE SPECIFIED. MISCELLANEOUS KEYNOTES LOCATION OF PROPOSED TRANSFORMERS SEE ELECTRICAL PLANS FOR DETAILS PROPOSED LIGHT POLES, SEE ELECTRICAL PLANS FOR DETAILS A B H O R R O C K S E N G I N E E R SN 0 20'40' SCALE: 1" = 20' SEWER KEYNOTES TIE INTO EXISTING SEWER MAIN. CONTRACTOR TO FIELD VERIFY EXACT DEPTH AND LOCATION OF EXISTING SEWER LINE AND NOTIFY ENGINEER OF RECORD OF ANY DISCREPANCIES AT CONNECTION POINT PER REXBURG STANDARDS. INSTALL 4" PVC SDR-35 SEWER LINE, SLOPE AND LENGTH PER PLANS LOCATION TO INSTALL TRAFFIC RATED SEWER CLEANOUT PER ISPWC SD-506 (SEPARATION AND NUMBER OF CLEANOUTS PER PLUMBING CODE) BRING SEWER PIPE UP TO SERVICE LINE GRADE WITH (2) 45 DEGREE FITTINGS PER ISPWC SD-511 NOT USED INSTALL PLUG & MARKER, SEE ARCHITECTURAL PLANS FOR CONTINUATION 71 72 73 74 75 76 H:\!2018\ID-1174-1805 D.L. Evans 2nd East (Rexburg)\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\ID-1174-1805_07_UTILITY PLAN AND DETAILS.dwg - C.5.0 UTILITY PLAN - 3/02/2020 08:06am, cadenf 1 5 RE V I S I O N S RE V # DA T E DR A W I N G I N F O DA T E DE S I G N E D DR A W N *S E E G E N E R A L N O T E S S H E E T WA R N I N G 0 1 2 IF T H I S B A R D O E S N O T ME A S U R E 2 " T H E N DR A W I N G I S N O T T O S C A L E ww w . h o r r o c k s . c o m PAGE C PR O J E C T CH E C K E D D B A # 2 3 4 90 1 P i e r V i e w D r . , S u i t e 2 0 5 Id a h o F a l l s , I D 8 3 4 0 2 (2 0 8 ) 5 2 2 - 1 2 2 3 PRELIMINARY NOT FOR CONSTRUCTION CI T Y R E V I E W S E T 28 J A N 2 0 2 0 1 28 F E B 2 0 2 0 2 ID - 1 1 7 4 - 1 8 0 5 LT S CJ F CJ F 20 D E C 2 0 1 9 UT I L I T Y & D R A I N A G E P L A N D. L . E V A N S B A N K NN A N O R T H 2 N D E A S T , RE X B U R G , I D A H O 8 3 4 4 0 7 C.5.0 56 57 7174 72 26 27 28 116 LF 2" WATER SERVICE 118 LF 2" WATER SERVICE & BORE SLEEVE (COORD WITH ITD & CITY OF REXBURG ON BORING SIZE, LOCATION, DEPTH, AND LENGTH) VERIFY EXACT LOCATION & SIZE OF WATER MAIN 30 N 2 N D E A S T S T / H W Y 3 3 14 LF 2" WATER SERVICE B B B B A N 2 N D E A S T S T / H W Y 3 3 737373 76 5151 51 51 52 52 52 52 52 52 52 52 73 53 53 54 54 54 55 58 29 29 12" MIN. SIZE PER TABLE 12" MIN. ADS N-12 PERFORATED INFILTRATION PIPE, SIZE PER TABLE(OR EQUIVALENT) NOTES: 1)STORMWATER DISTRIBUTION PIPES TO BE PERFORATED ADS N-12 INFILTRATION PIPE, SIZE PER TABLE(OR EQUIVALENT) 2)ALL WASHED STONE IN INFILTRATION TRENCH TO BE GRANITE. LIMESTONE BASED GRAVEL WILL NOT BE ACCEPTED. MATERIAL TO BE APPROVED BY GEOTECH 3)INFILTRATION TRENCH TO BE LINED IN FILTER FABRIC - TOP AND SIDES. 4)INFILTRATION STONE TO BE 3/4" TO 2" GRANITE, OR APPROVED EQUAL, FREE FROM SLATE, SHALE, CLAY & SILT UNDISTURBED MATERIAL 95% COMPACTED FILL (D) 5' (TYP) MIN. 1' OF ASTM C33 FILTER SAND 3/4" TO 2" WASHED, GRANITE STONE PAVEMENT 5' MIN (TYP) 1' MIN (TYP) TYPICAL SECTION A 5' (TYP) FILTER FABRIC TO BE PLACED AROUND TOP, AND SIDES OF INFILTRATION CHAMBER. FABRIC TO BE AMOCO 4545 NON-WOVEN OR EQUIVALENT LAYER OF CLEAN, WASHED SAND TO BE INSTALLED BELOW FILTER FABRIC 1.GROUND WATER IS NOT FOUND WITHIN 10' OF THE SURFACE BASED ON THE PROJECT GEOTECHNICAL REPORT DATED 02/14/2019. IF GROUNDWATER IS ENCOUNTERED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY FOR REDESIGN OF SEEPAGE TRENCHES TO PROVIDE 3' MINIMUM CLEARANCE BETWEEN GROUNDWATER AND THE BOTTOM OF THE TRENCH. UNTIMELY NOTIFICATION OF THE ENGINEER MAY RESULT IN ADDITIONAL COSTS TO THE CONTRACTOR. 2.WHEN ROCK IS ENCOUNTERED, CONTRACTOR SHALL HAVE PERCOLATION TEST PERFORMED BY SOILS ENGINEER AFTER SEEPAGE TRENCH IS FULLY EXCAVATED. IF THE PERCOLATION TEST IS LESS THAN SPECIFIED BY THE SOILS REPORT AND ENGINEER, CONTRACTOR SHALL BLAST TO CREATE CRACKS IN ROCK FOR DRAINAGE TO OCCUR, OR REDESIGN OF THE SYSTEM TO ACHIEVE REQUIRED CRITERIA. IN SUCH AREAS THE FINE AGGREGATE LAYER MAY BE REDUCED TO 1.5' 3.THE TRENCH SHALL BE EXTENDED INTO ANY POORLY GRADED GRAVEL LAYER A MINIMUM OF 1.5'. BACKFILL WITH A LOW FINE PIT RUN MATERIAL IS ACCEPTABLE BETWEEN THE BOTTOM OF THE TRENCH AND THE FINE AGGREGATE LAYER IF AVAILABLE. 4.SAND SHALL MEET THE REQUIREMENTS OF ISPWC SECTION 800, ASTM C33, OR ITD SPECIFICATION 703.02. WRAP TRENCHES TOP AND SIDES WITH AMOCO 4545 OR EQUIVALENT END CAP 2' MIN. COVER OVER CRUSHED GRAVEL IN PAVED AREAS SLOPE=0%(D ) 1'2' MIN. TO THE TOP OF PIPE ROADWAY SURFACING UNDISTURBED MATERIAL TO DISTRIBUTION HEADER EXCAVATE TO FREE DRAINING SAND AND GRAVEL PER PROJECT GEOTECHNICAL REPORT. CONSULT GEOTECHNICAL ENGINEER (TYP) (BOTTOM OF SAND AS SHOWN SHALL BE THE MINIMUM EXCAVATION)TYPICAL SECTION B ELEV:(A ) INFILTRATION TABLE INFILTRATION TRENCH DRAINAGE AREA (FT²) DESIGNED STORM (YEAR(S)) DESIGNED STORM VOLUME (FT³) VOLUME PROVIDED (FT³) (L) LENGTH (FEET) (W) WIDTH (FEET) (D) DEPTH (FEET) ELEVATION PERFORATED PIPE SIZEABC -27,732 25 3,850 4,099 52'25.0'8'4865.87 4868.87 4860.87 24" NOTE: POROSITY OF ROCK IS 30% PER CITY STANDARD 3/4" TO 2"WASHED GRANITE STONE THROAT WIDTH RING AND GRATE ELEVATION INVERT IN (FROM INLETS) OUTLET BAFFLE WALL ELEVATION INLET BAFFLE WALL ELEVATION SAND & GREASE TRAP SPECIFICATIONS SIZE (GALLONS)NAME RING & GRATE ELEVATION INVERT IN ELEVATION INLET BAFFLE WALL ELEVATION THROAT WIDTH (INCHES) OUTLET BAFFLE WALL ELEVATION INVERT OUT ELEVATION 1500 S&G INTERCEPTOR A (STORM) 4871.00 4866.27 4865.67 11 4866.17 4865.87 SAND & GREASE TRAP NOTES: 1.REFER TO SITE GEOTECH REPORT, PREPARED BY MTI & DATED 02/14/2019, FOR INFILTRATION FACILITY DESIGN. 2.SEE THE GRADING PLAN FOR MORE AND/GREASE TRAP ELEVATIONS. 3.REFER TO THE SAND AND GREASE TRAP STANDARD DRAWING, ISPWC SD-624 FOR MORE DETAIL. 4.THE SAND AND GREASE TRAP MUST BE CONSTRUCTED PER THE SPECIFICATIONS DESCRIBED IN THE ISPWC SPECIFICATIONS AND SD-624 FOR MORE DETAIL. 5.SEE THE STORM DRAIN PLAN FOR THE SAND & GREASE TRAP LOCATIONS AND THE OBSERVATION WELL PIT LOCATIONS. 6.THE INVERT IN OF THE DISTRIBUTION HEADER PIPE MUST BE A MINIMUM OF 0.10 FEET HIGHER THAN THE INVERT OUT. INVERT OUT (TO INFILTRATION TRENCH) MUST BE A MINIMUM OF 0.10' BELOW INFLOW INVERT PROFILE VIEW SCALE: 1 - TYPICAL INFILTRATION TRENCH DETAIL NTS SCALE: 1A - SAND & GREASE TRAP DETAIL NTS 2' MIN. ELEV:(B ) ELEV:(C ) 72 72 ELEV: 4868.87' ELEV: 4860.87' 31 59 ADJUST TO MATCH FINISH GRADE 30 1 2 2 fopp e e e e tv tb S D SD S D SD S D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D L O D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D S F S F S F S F S F S F S F S F S F S F S F S F S F S F S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF S F S F S F S F 4 8 7 2 4872 48 7 2 48 7 2 48 7 2 48 7 2 4 8 7 3 48 7 3 4873 48 7 3 48 7 1 4 8 7 1 4871 4 8 7 1 4 8 7 1 4871 4 8 7 2 4872 4872 4 8 7 3 48 7 2 48 7 1 SF SF SF SF SF SF SF SF H O R R O C K S E N G I N E E R SN 0 10'20' SCALE: 1" = 10' PROPERTY LINE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED CURB AND GUTTER DIRECTION OF OVERLAND FLOW STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASH OUT SILT FENCE LIMITS OF DISTURBANCE TEMPORARY DITCH TEMPORARY INLET PROTECTION LEGEND: SF SF LOD LOD H:\!2018\ID-1174-1805 D.L. Evans 2nd East (Rexburg)\Project Data\02 CAD\2.03 Sheet Files\Construction Drawings\ID-1174-1805_08_EROSION AND SEDIMENT CONTROL PLAN.dwg - C.6.0 EROSION AND SEDIMENT CONTROL PLAN - 3/02/2020 08:09am, cadenf 1 5 RE V I S I O N S RE V # DA T E DR A W I N G I N F O DA T E DE S I G N E D DR A W N *S E E G E N E R A L N O T E S S H E E T WA R N I N G 0 1 2 IF T H I S B A R D O E S N O T ME A S U R E 2 " T H E N DR A W I N G I S N O T T O S C A L E ww w . h o r r o c k s . c o m PAGE C PR O J E C T CH E C K E D D B A # 2 3 4 90 1 P i e r V i e w D r . , S u i t e 2 0 5 Id a h o F a l l s , I D 8 3 4 0 2 (2 0 8 ) 5 2 2 - 1 2 2 3 PRELIMINARY NOT FOR CONSTRUCTION CI T Y R E V I E W S E T 28 J A N 2 0 2 0 1 28 F E B 2 0 2 0 2 ID - 1 1 7 4 - 1 8 0 5 LT S CJ F CJ F 20 D E C 2 0 1 9 ER O S I O N A N D S E D I M E N T C O N T R O L P L A N D. L . E V A N S B A N K NN A N O R T H 2 N D E A S T , RE X B U R G , I D A H O 8 3 4 4 0 8 C.6.0 INSTALL TEMPORARY INLET PROTECTION AT STORM DRAIN INLETS, 2 BAGS HIGH PER BMP31. ALL SILT TO BE REMOVED REGULARLY(FOR EXISTING AND PROPOSED INLETS) STABILIZED CONSTRUCTION ENTRANCE PER APWA 126 AT ENTRANCES AS SHOWN. CONSTRUCT SILT FENCE/PRESERVATION PER BMP 63-68 PROVIDE DUST CONTROL FOR ENTIRE SITE. CONCRETE WASHOUT AREA 1)BMP NEEDS FOR STORM WATER RUNOFF FOR A PARTICULAR AREA WILL BE DETERMINED WHEN A NEW STRUCTURE IS PROPOSED FOR CONSTRUCTION. 2)IT IS NOT INTENDED FOR THE SITE TO RECEIVE ANY ONCOMING FLOW FROM OUTSIDE SOURCES NOT CONTAINED IN EXISTING FLOW STRUCTURES. 3)FIELD MARK LIMITS OF DISTURBANCE FOR APPROVAL BY LOCAL AUTHORITY AND OBTAIN APPROPRIATE STORM WATER MANAGEMENT PERMIT. 4)INSTALL SILT FENCE AND/OR ENVIRONMENTAL FENCE AROUND PERIMETER OF PROJECT AS INDICATED ON THIS PLAN SHEET. 5)INSTALL SEDIMENT CONTROL MEASURES INDICATED IN ALL EXISTING STORM DRAIN INLETS ADJACENT TO THE CONSTRUCTION SITE. 6)CONTRACTOR WILL BEGIN DEMOLITION, GRADING, EXCAVATION, AND CONSTRUCTING SITE UTILITY IMPROVEMENTS AS NEW DRAINAGE ELEMENTS ARE COMPLETED, CONSTRUCT SEDIMENT PROTECTION AT ALL NEW INLETS. 7)AREAS DISTURBED BY CONSTRUCTION ACTIVITIES WILL BE STABILIZED WITH NATIVE GRASS MATERIAL OUTSIDE THE STREET RIGHT OF WAY AND PAVEMENT AREAS OF PARKING AND DRIVEWAY AREAS. SITE STABILIZATION OF AREAS DISTURBED BY CONSTRUCTION ACTIVITIES TO BE COMPLETED WITHIN 14 DAYS OF FINISHING AN AREA TO THE FINAL LINES AND GRADES INDICATED ON THE GRADING PLAN. 8)LANDSCAPE ESTABLISHMENT, REMOVE TEMPORARY MEASURES AND CLEAN STORM DRAIN SYSTEM PRIOR TO RELEASING SYSTEM TO PROJECT OWNER. 9)DISCHARGE FROM THE SITE WILL BE THROUGH THE NEW STORM DRAIN SYSTEM AND INTO THE SNAKE RIVER LANDING COMMUNAL SYSTEM. 10)THE BMPS AND SITE WILL BE MONITORED REGULARLY, ANY ADDITIONAL BMPS THAT ARE NEEDED WILL BE DETERMINED DURING REGULAR INSPECTIONS AND INSTALLED ACCORDING TO SPECIFICATIONS. 11)CONTRACTOR TO UTILIZE STABLIZED CONSTRUCTION ENTRANCE FOR VEHICLE TIRE WASH, AS NECESSARY. APPROXIMATE QUANTITY SUMMARY LINEAR FIBER ROLL - SILT FENCE 542 LF CONSTRUCTION FENCE - EARTH DIKE & DRAINAGE SWALE - RIP RAP - HYDROSEEDING - STABILIZED CONSTRUCTION ENTRANCE 2 EA STABILIZED STAGING AREA 1 EA CONCRETE WASH OUT 1 EA SEDIMENT BASIN - WHEEL WASH - INLET PROTECTION 4 EA CHECK DAM - LIMITS OF DISTURBANCE ±0.62 AC PROJECT ACRES ±0.64 AC R25' 1" TO 3" COARSE AGGREGATE FILTER FABRIC 50' MIN PU B L I C R O A D HA R D S U R F A C E STABILIZED CONSTRUCTION ENTRANCE 30' MIN 12" DIAMETER ROCK 6" MIN 18" MIN 18 " M I N 48" MIN48" MIN 4" PVC PIPE FLOW CROSS-SECTION WOVEN FABRIC SANDBAG FILLED WITH COARSE SAND-MIN WEIGHT 40 LBS. 24" MIN FRONT VIEW 4" PVC PIPE FOR DRAINAGE SANDBAG BARRIER INLET PROTECTION (PAVED AREA) RETRIEVAL STRAP OVERFLOW (PEAK STORM) SEDIMENT ACCUMULATION GEOTEXTILE FABRIC SILT FENCE BMP 63-68 EQUAL ALTERNATE: STEEL FENCE POST FILTER FABRIC MATERIAL 60" WIDE ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2" X 2" 14 GA WIRE FABRIC OR EQUIV. BURY BOTTOM OF FILTER MATERIAL IN 8" X 12" TRENCH FILTER FABRIC MATERIAL 2" X 2" 14 GA WIRE FABRIC OR EQUIV. PROVIDE 3/4" - 1 1/2" WASHED GRAVEL BACKFILL IN TRENCH AND ON BOTH SIDES OR FILTER FENCE FABRIC ON THE SURFACE 2" X 4" WOOD POST ALT: STEEL FENCE POSTS 8" 12 " 2'- 6 " 2' - 0 " 5' - 0 " 6" PROPOSED BUILDING 3,966 SF 1 2 3 4 5 1 1 1 1 2 2 33 3 3 3 3 3 3 4 4 4 4 4 5