June 10,2008
Parking Configuration
Plumbing Review
Parcel Ws RPRRXBP0030010
Meets code requirements.
O4/08/20O8
CITY OF �.
USG...
.
Amer,'ca's Camn+aeniq,
June 10, 2008
Review Action
P.O Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone(208)359-3020
Fax (208) 359-3022
Permit Number: 08 00151
Project Name: Upper Valley Options Addition -Site Plan
Project Type: Site Plan Review
Review Item Actions Required for Approval Approved
Planning Staff Review
Development Standards Review Site plan shows a100 -foot building. Is the 05/23/2008
building larger than this. I cannot determine
from the site plan what is existing and what is
proposed.
Development Standards Review Please show pedestrian connections from 05/23/2008
buildint to public right-of-way. Connection needs
to use material such as "pavers, bricks, or
scored concrete."
Development Standards Review
Development Standards Review
Development Standards Review
Need parking analysis which includes: Size of
building (gross square footage), describe land
use for building, number of parking spaces
required, number of parking spaces provided.
6-09-2008 Parking analysis still not submitted.
In the absence of an analysis, Staff reveiwed
old files and aerial photos to material to make
assumptions. Therefore, it is assumed that the
use will be medical in nature and will therefore
require 5 spaces per 1000 square feet of gross
floor area (GFA). With this standard, the
proposal has met the requirement.
Location of trash dumpster? Location cannot be
within the front yard setback of 20 -feet.
Dumpsters need to be screened. Show location
and material to be used for dumpster
screening. Material needs to be consistent wit
that used for the primary building, e.g. wood,
stone, brick, etc.
6-09-2008 Proposal submitted on June 5,
meets standard, ok.
Please submit a landscape plan. Parking areas
need to be screened as possible given some
"granfathered status" of the parking lot location
and dimensions of existing landscaped area.
Show location and type of trees, shrubs, and
ground cover to be used. Recomended: 1 tree
per 20 feet of road frontage (1.5 inche caliper at
06/09/2008
06/09/2008
06/10/2008
�4•r.z;x CITY (3 P.0 Box 280
'L ... '
U G 19 E. Main St.
REXBURG Rexburg,Idaho 83440
Americdsfana'lyc;am,; <arity Phone (208) 359-3020
Review Action Fax (208) 359-3022
June 10, 2008
Permit Number: 08 00151
Project Name: Upper Valley Options Addition -Site Plan
Project Type: Site Plan Review
Review Item Actions Required for Approval Approved
Development Standards Review
Parcel Ws RPRRXBP0030010
planting), 1 shrub per 5 feet of road frontage
(five gallon at planting). Groundcover should be
balanced between live cover and non -living
cover. Landscaping can, and is encouraged to
be clustered. The above standards only help
determine the number of plants that should be
used.
6-09-2008 Still not submitted as of this date.
6-10-2008 Scott from Upper Valley Options said
that he will work on the landcsaping issues as a
deferred submittal.
Revised site plan- southernmost parking stall
needs a manuevering area installed. This area
should be 6 -feet by 22 -feet.
6-10-2008 Did not discuss this issues with
Scott from Upper Valley Options, but it will be
noted on the approved site plan as a
requirement.
06/10/2008
4 Cy .. CIT.. t) F
u .A...l jj�
U `9.`.f
Arer'ca,, Family Community
June 10, 2008
-.a P.O Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone(208)359-3020
Review Action Fax (208) 359-3022
Permit Number: 08 00151
Project Name: Upper Valley Options Addition -Site Plan
Project Type: Site Plan Review
Review Item Actions Required for Approval Approved
Public Works Review,",
_. __.._....._____.
Approved Site Plan The site plan submitted is for the origional 04/10/2008
construction. There is no information about the
new building addition or what is to be done with
the site as a function of this project.
Parcel #'s RPRRXBP0030010
CITY 0REXBP
4
U
.......... __........................
wr}a;',, Vane?v C-Immun:h•
June 10, 2008
P.O Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone(208)359-3020
Review Action Fax (208) 359-3022
Existing Hydrants
Required Fire Flow
Vicinity Map Provided
Access to Hydrants
Hydrant Flows Provided
Fire Lane Signage
Fire Sprinkler System Required
Parcel Ws RPRRXBP0030010
Fire flows from existing hydrants must be
supplied to dept.
04/10/2008
04/10/2008
04/10/2008
04/10/2008
CITY OF
- I ........... -
REXBURG
America',,,T'amih; Community
June 10, 2008
P.0 Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone (208) 359-3020
Review Action Fax (208) 359-3022
Permit Number: 08 00152
Project Name: Upper Valley Options Addition
Project Type: Commercial Addition
Review 'Item Actions Required for Approval Approved
Administrative Review',
Permit Tech Notes 06/09/2008
Parcel Ws RPRRXBP0030010
REXBURGCITY OF
....... ... ._....— cv— ........................
Anwruds Eairi v Camn..t rjy
June 10, 2008
Permit Number: 08 00152
P.o Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone(208)359-3020
Review Action Fax (208) 359-3022
Project Name: Upper Valley Options Addition
Accessibility Review Meets code requirements. 04/08/2008
Building Type Compliance
Energy Conservation Compliance Review
Structural Review
Building Code Fire Compliance Review
Height and Area Review
Electrical Service Review
Electrical Circuits Review
Water and Sewer Service
Plumbing Sewer Drain Review
Plumbing Storm Drain Review
Building is Type VB
Meets code requirements.
Structural calculations have been provided
Building is sprinklered.
Meets code requirements.
No electrical plan was submitted, need to have
an electrical engineered set of drawings for the
electrical portion of this project. The therapy
spa and occupancy type are what mandates
this.Revisions required. The plans that were
submitted were excepted with the intent that
this is wired to the 2005 NEC and the notes that
were provided in the circuits review.
No electrical plans were submitted for this
project, need to see the occupancy type and
the therapy spa details -engineered. Revisions
required. Make sure that the receptacles are no
closer than 10' from the inside walls of the
therapy spa unless they meet the requirements
of section 680.22.a.1&2 of the 2005 NEC.
All plumbing services are required to be tested
and inspected before covering.
All drains are required to be istolled according
to the Uniform Plumbing code 2003 edition.
N/A
Mechanical Review Provide mechanical plans.
Exiting Review The required (Table 1015.1 2006 IBC) second
exit from the existing dining area now exits
through a storage space. Section 1014.2 of the
04/08/2008
04/08/2008
04/08/2008
04/08/2008
04/08/2008
05/22/2008
05/22/2008
oe,,r,xi z; "Ve
�d fITY 0 F
U
5 REXBURG
.............. — CW ._........... ..........
me u4' i'{a ndy (;o(FiI? unify
Review Action
June 10, 2008
P.O Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone(208)359-3020
Fax(208)359-3022
Permit Number: 08 00152
Project Name: Upper Valley Options Addition
Project Type: Commercial Addition
Review Item Actions Required for Approval Approved
2006 IBC does not allow exiting through storage
rooms.
Plumbing Potable Water Review All water lines are required to be tested and
inspected before covering.
Parcel #'s RPRRXBP0030010
.... '{{'�1CITY OF
EC
....___
BURG
America7,, an;:y CoYttHt6aizs ty
June 10, 2008
Permit Number: 08 00152
P.O Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone(208)359-3020
Review Action Fax (208) 359-3022
Project Name: Upper Valley Options Addition
Project Type: Commercial Addition
Review Item Actions Required for Approval Approved
Fire Department Review
Required Fire Flow See site plan review
Water Supply
Fire Access Roads
Fire Extinguishers
Automatic Fire Extinguishing Systems
Standpipes
See site plan review
See site plan review
All fire extiguishers are required to be installed
before final fire inspection
Plans for fire sprinkler system are required to
be submitted and approved by the State Fire
Marshall before installation of the system.
N/A
Commercial Cooking N/A
Alarm Systems The building requires a fire alarm system. Plans
are to be submitted to the City of Rexburg and
require approval before installing.Submit letter
of intent from a certified fire alarm contractor.
Letter of Intent was received on 5/27.
Other Comments If a lock box is not already on the building one
will be required to be installed before
occupancy will be issued.
Parcel #'s RPRRXBP0030010
z}zCT TY - P.O Box 280
G REXBURG
19 E. Main St.
—— ...................... Rexburg, Idaho 83440
America", 1-'anrly Comnrrniiy Phone (208) 359-3020
Review Action Fax (208) 359-3022
June 10, 2008
Permit Number: 08 00152
Project Name: Upper Valley Options Addition
Project Type: Commercial Addition
Review Item Actions Required for Approval Approved
,lArming Staff Review
Development Standards Review
Please submit building elevations that show the 05/23/2008
entire building for each side.
Development Standards Review Please show pedestrian connections from 05/23/2008
buildint to public right-of-way. Connection needs
to use material such as "pavers, bricks, or
scored concrete."
Development Standards Review
Development Standards Review
Development Standards Review
Development Standards Review
South side of building needs an additional 9 feet
of animating features such as arcades, display
windows, entry areas, or awnings.
Continuous internal pedestrian walkways, no
less than 5 -feet in width, shall be provided from
the public sidewalk or right-of-way to the
principal customer entrance of all principal
buildings on site.
If proposed pedestrian connection is located on
existing ashpalt, striping can be an applied
surface rather than a textrue change. Areas
from enrty to sidewalk need to be ADA
accessible.
Location of trash dumpster? Location and
material need to be specified. Cannot be
located within the required 20 -foot front yard
setback (this site has three front yards).
June 5th 2008- Recieved details on that date.
Enclosure meets standards. OK
Perimeter sidewalks need to be installed per
City standards (contact the Public Works
department for specifications) -
6 -9-2008 need to show on site plan.
6-10-2008 Talked to Scott from Upper Valley
Options. He said that he will commit to
exploring this issue with the Public Works
Department and/or the City Council prior to the
final inpspection of the building. He would not
commit to installation at this point.
05/23/2008
05/23/2008
06/09/2008
06/10/2008
CITY 0 F
REXBURG
.--........_..— CIQW - ... ..........
America's Famly C-Im umay
June 10, 2008
Permit Number: 08 00152
Review Action
Project Name: Upper Valley Options Addition
Project Type: Commercial Addition
P.O Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone(208)359-3020
Fax(208)359-3022
Review Item Actions Required for Approval Approved
Development Standards Review
Development Standards Review
Building facades shall include a repeating
pattern that shall include no less than three of
the elements listed below. At least one of these
elements shall repeat horizontally. All elements
shall repeat at intervals of no more than thirty
(30) feet, either horizontally or vertically.
- color change
- texture change
- material module change
- expression of architectural or structural bay
through a change in plane no less than 12
inches in width, such as an offset, reveal, or
projecting rib.
May need to add an element to the existing
building to maintain architctural continutity.
Development shall provide the establishment of
or enhancement of pedestrian or public spaces
by providing at least two (2) of the following:
Patio/seating area, pedestrian plaza with
benches, transportation center, window
shopping walkways, outdoor play area, kiosk
area, water feature, clock tower, steeple, or
other such deliberately shaped area and/or
focal feature or amenity that, in the judgement
of the Planning Commission, adequately
enhances such community and public spaces.
Any such areas shall have direct access to the
public sidewalk netwrok and such features shall
not be constructed of materails that are inferior
to the principal materials of the building and
landscape.
6-09-2008 Still not shown on revised plans. In
response to this request, applicant refers to a
document that was submitted to us, however, I
cannot find it. Applicant refers to a Covenant
that the Business Park does not requires this;
06/10/2008
06/10/2008
CT T Y OF
STA.,.
(;are+nr ;r,tp
June 10, 2008
P.O Box 280
19 E. Main St.
Rexburg, Idaho 83440
Phone(208)359-3020
Review Action Fax (208) 359-3022
Permit Number: 08 00152
Project Name: Upper Valley Options Addition
Project Type: Commercial Addition
Review Item Actions Required for Approval Approved
City regulations would trump this Covenant.
6-10-2008 Scott from Upper Valley Options said
that he will work on the landcsaping issues as a
deferred submittal.
Parcel Ws RPRRXBP0030010