Loading...
HomeMy WebLinkAboutCOMMERCIAL APPLICATION CHECKLIST - 19-00715 - 1145 S 2nd E - AT&T Cell TowerInspection Hotline – (208) 372.2344 www.rexburg.org Permit Technician – (208) 372.2341 Revised 10/2016 Building Safety Department City of Rexburg 35 North 1st East Rexburg, Idaho 83440 COMMERCIAL APPLICATION CHECKLIST The following items should be completed before you submit your building permit application. *Reasonable accommodations will be made upon request. Submit the Following Documents: ྅ 3 sets of site plans drawn to scale (see Site Plan Checklist) ྅ 3 sets of building plans (see box below to right) – stamped by a licensed professional. Include the following as applicable ྅ Foundation Plan, Floor Joist Layout, Floor Plan, Roof Layout, Truss Details, Sectional Views, Front, Back, and Side Elevations, Mechanical Layout, Stair Details, and any details required to illustrate special construction. ྅ Electrical panel layout and calculations included with building plans. ྅ Exterior Lighting Plan including photometric layout. ྅ Structural Calculations (see box below) – stamped by a licensed Engineer ྅ Energy Compliance Report: As per the 2012 IECC, a COMCheck is required (available online at www.energycodes.gov) ྅ Digital Plans (PDF Format – can be submitted by USB, CD, or Dropbox) ྅ **Copies of any Contractors’ State License if not on file already. Complete the Following Forms ྅ Site Plan Checklist ྅ Permit Policies Acknowledgment signed ྅ Property Line form signed ྅ Building Permit Application signed by a registered General Contractor ྅ Mechanical Permit Application signed by a registered Mechanical Contractor ྅ Electrical Permit Application signed by a licensed Electrical Contractor ྅ Plumbing Permit Application signed by a licensed Plumbing Contractor ྅ Fire Alarm Permit Application (if applicable) signed by a registered professional ྅ Fire Sprinkler Permit Application (if applicable) signed by a registered professional ྅ Subcontractor list filled out ྅ Affidavit of Legal Interest signed by owner ྅ Notifications Distribution List ྅ Business Use Summary Completed Subdivisions: If you plan to build in a subdivision please check the Rexburg Development Code for any requirements such as property setbacks, architecture board approval, etc. This information is available at http://rexburg.org/pages/development-code. Seismic Design Category – D (unless soil evaluation confirms category C) Ground Snow – 50 lbs. per sq. ft. Roof Snow Load – 35 lbs. per sq. ft. Wind Load – 90 MPH Frost Depth – 36”