Loading...
HomeMy WebLinkAboutCONCRETE TEST 8 - 19-00780 - 500 N 2nd E - DL Evans Bank Environmental Services Geotechnical Engineering Construction Materials Testing Special Inspections 1230 N Skyline Drive, Suite C  Idaho Falls, ID 83402  (208) 529-8242  Fax (208) 529-6911 www.mti-id.com  mti@mti-id.com Revised May 2016 Jessica Aguilar Phone: (208) 363-8400 DL Evans Bank Fax: 890 West Main Street Other: E-REPORTS ONLY Boise, ID 83702 Project: D.L. Evans, North 2nd East, Rexburg, ID Permit #: Project Manager: Derrick Fontes MTI File #: E200068c INSPECTION/TESTING REPORT Our representative(s) performed work on the above referenced project. Attached you will find the corresponding inspection and/or test reports. Please refer to the attached reports for details and locations of our testing and inspection services. If there are questions concerning the attachment(s), please contact the project manager at (208) 529-8242. Respectfully submitted, MATERIALS TESTING & INSPECTION, LLC cc: Larry Skelton; Kai Risung; Tom Lennon; Jim Turner; Kristina Teichert; Josh Morgan Attachments: 7/13/2020Page 1 of 2 rpt008 Idaho | Montana | Nevada | Oregon | Utah | Washington | Wyoming mti@mti-id.com • www.mti-id.com Environmental Services Geotechnical Engineering Construction Materials Testing Special Inspections MATERIALS TESTING & INSPECTION DAILY INSPECTION REPORT REMARKS Date: __________________ MTI File #:_________________________ Project Name:______________________________________ Contractor: _______________________________________________ Permit #:__________________________________________ Inspector: ________________________________________________ Weather: __________________________________________ Rev. April 18, 2018 NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our field representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may rely on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction.  This Report is Preliminary. A preliminary report is provided solely as evidence that eld observation was performed. Observations and/or conclusions and/or recommendations conveyed in the nal report may vary from and shall take precedence over those indicated in a preliminary report.  This Report is Final. A nal report is an instrument of professional service. Any conclusions drawn from this report should be discussed with and evaluated by the professional involved. Inspector: _________________________________________ Date: ________________ Note: The recording of false, fictitious or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute. Reviewed by: ______________________________________Date: ________________ Contractor Initials: ____________ 7/10/2020 E200068c D.L. Evans Construction Solution R. Jenson Sunny MTI representative Arrived on-site for some concrete testing. MTI rep was informed that the concrete was used to do a small repair and was going to be concrete mixed on-site. Josh, Rep for Construction Solution directed MTI to obtain a sample to cast only 2 sets of Cylinders that needed to show when 2000 PSI was reached. MTI rep Derrick Fontes confirmed with the Josh that he did not want a Slump, Air, or Unit weight test. One Cylinder was to be broken at 7 days and the other cylinder was to be store if the 7 day did not reach 2000 PSI 7/10/2020 4 7/13/2020Jocelynn Silva 7/13/2020Page 2 of 2rpt008