Project: D.L. Evans, North 2nd East, Rexburg, ID
Permit #:
Project Manager: Derrick Fontes
MTI File #: E200068c
INSPECTION/TESTING REPORT
Our representative(s) performed work on the above referenced project. Attached you will find the corresponding
inspection and/or test reports. Please refer to the attached reports for details and locations of our testing and
inspection services.
If there are questions concerning the attachment(s), please contact the project manager at (208) 529-8242.
Respectfully submitted,
MATERIALS TESTING & INSPECTION, LLC
cc: Larry Skelton; Kai Risung; Tom Lennon; Jim Turner; Kristina Teichert; Josh Morgan
Attachments:
7/13/2020Page 1 of 2
rpt008
Idaho | Montana | Nevada | Oregon | Utah | Washington | Wyoming
mti@mti-id.com • www.mti-id.com
Environmental Services Geotechnical Engineering Construction Materials Testing Special Inspections
MATERIALS
TESTING &
INSPECTION
DAILY INSPECTION REPORT
REMARKS
Date: __________________ MTI File #:_________________________ Project Name:______________________________________
Contractor: _______________________________________________ Permit #:__________________________________________
Inspector: ________________________________________________ Weather: __________________________________________
Rev. April 18, 2018
NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our field representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may
rely on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction.
This Report is Preliminary.
A preliminary report is provided solely as evidence that eld
observation was performed. Observations and/or conclusions and/or
recommendations conveyed in the nal report may vary from and
shall take precedence over those indicated in a preliminary report.
This Report is Final.
A nal report is an instrument of professional service. Any conclusions drawn from this report should be discussed with and
evaluated by the professional involved.
Inspector: _________________________________________ Date: ________________
Note: The recording of false, fictitious or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute.
Reviewed by: ______________________________________Date: ________________
Contractor Initials: ____________
7/10/2020 E200068c D.L. Evans
Construction Solution
R. Jenson Sunny
MTI representative Arrived on-site for some concrete testing. MTI rep was informed that the concrete was used to do a small
repair and was going to be concrete mixed on-site. Josh, Rep for Construction Solution directed MTI to obtain a sample to cast
only 2 sets of Cylinders that needed to show when 2000 PSI was reached. MTI rep Derrick Fontes confirmed with the Josh that
he did not want a Slump, Air, or Unit weight test. One Cylinder was to be broken at 7 days and the other cylinder was to be store
if the 7 day did not reach 2000 PSI
7/10/2020