Project: D.L. Evans, North 2nd East, Rexburg, ID
Permit #:
Project Manager: Derrick Fontes
MTI File #: E200068c
INSPECTION/TESTING REPORT
Our representative(s) performed work on the above referenced project. Attached you will find the corresponding
inspection and/or test reports. Please refer to the attached reports for details and locations of our testing and
inspection services.
If there are questions concerning the attachment(s), please contact the project manager at (208) 529-8242.
Respectfully submitted,
MATERIALS TESTING & INSPECTION, LLC
cc: Larry Skelton; Kai Risung; Tom Lennon; Jim Turner; Kristina Teichert; Josh Morgan
Attachments:
rpt005co
Idaho | Montana | Nevada | Oregon | Utah | Washington | Wyoming
mti@mti-id.com • www.mti-id.com
Environmental Services Geotechnical Engineering Construction Materials Testing Special Inspections
MATERIALS
TESTING &
INSPECTION
REINFORCED CONCRETESPECIAL INSPECTION REPORT
Date: _______________ MTI File #: _____________________ Project Name: ________________________________
Contractor: _________________________________________ Permit #: ____________________________________
Inspector: __________________________________________ Weather: ____________________________________
Rev. April 18, 2018
MTI personnel performed:
Continuous Inspection Periodic Inspection Reinforcing Steel Only Inspection Concrete Only Inspection
Reinforcing Steel
Inspected reinforcing steel placement for element (e.g. beam, column, oor slab, footing, etc.):
Inspection reinforcing steel placement at location:
Concrete Placement
Observed placement and consolidation of concrete.
Concrete placed at the following location:
Monitored loads for correct mix.
Mix I.D. #: __________________________________
Supplier: ___________________________________
Total # of cubic yards placed: __________________
Concrete Sampling and Testing
Performed ________ Air Content Test(s)Sampled at:
Performed ________ Unit Weight Test(s)Pump Chute Both Other: ____________________
Performed ________ Slump Test(s)Placed by:
Cast ________ set(s) of ________ cylinders Pump Chute Both Other: ____________________
Cast ________ set(s) of ________ exural beams Consolidated by:
Sample #s: _________________________________ Mechanical Manual Other: ____________________
Work Inspected was: in compliance except as noted reinspection/retesting required
Notes:
NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those
opinions to our client. The presence and activities of our field representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may rely on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction.
This Report is Preliminary.
A preliminary report is provided solely as evidence that eld observation was performed. Observations and/or conclusions and/or
recommendations conveyed in the nal report may vary from and Inspector: _________________________________________ Date: ________________ shall take precedence over those indicated in a preliminary report.Note: The recording of false, fictitious or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute.
Reviewed by: ______________________________________Date: ________________
___________________________
Contractor Initials
This Report is Final.
A nal report is an instrument of professional service. Any
conclusions drawn from this report should be discussed with and evaluated by the professional involved.
6/9/2020 E200068c D.L. Evans, North 2nd East
Construction Solutions
J. Larsen Cloudy
4 4
N/A
N/A
4
South 3 Pillars.
4
454516C-4
Burns
2.50
1
1 4
1
1 5 4
20-01229 to 20-01233 4
4
6/9/2020
4
6/10/2020Alex Liang
6/10/2020Page 1 of 1