Project: D.L. Evans, North 2nd East, Rexburg, ID
Permit #:
Project Manager: Derrick Fontes
MTI File #: E200068c
INSPECTION/TESTING REPORT
Our representative(s) performed work on the above referenced project. Attached you will find the corresponding
inspection and/or test reports. Please refer to the attached reports for details and locations of our testing and
inspection services.
If there are questions concerning the attachment(s), please contact the project manager at (208) 529-8242.
Respectfully submitted,
MATERIALS TESTING & INSPECTION, LLC
cc: Larry Skelton; Kai Risung; Tom Lennon; Jim Turner; Kristina Teichert; Josh Morgan
Attachments:
5/21/2020 Page 1 of 2
rpt002geo
Idaho | Montana | Nevada | Oregon | Utah | Washington | Wyoming
mti@mti-id.com • www.mti-id.com
Environmental Services Geotechnical Engineering Construction Materials Testing Special Inspections
MATERIALS
TESTING &
INSPECTION
SUBGRADE INSPECTION REPORT
Date: _______________ MTI File #: _____________________ Project Name: ________________________________
Contractor: _________________________________________ Permit #:_____________________________________
Inspector: __________________________________________ Weather:_____________________________________
Rev. April 18, 2018
Geotechnical Report: Yes No If yes, by who: ____________________________________________________________
Report Date: ___________________ Report #: ____________________ Page #: _____________________
Plan Sheet(s): ________________________ Detail(s):________________________RFI(s): _________________________________
Bearing Capacity (if applicable): _________________________________________________________________________
Subgrade Compaction Required: Yes No If yes: Standard: _______________ %Required: _________________
Other Requirement(s) (e.g. geogrid, over-ex, etc.):___________________________________________________________
Element(s) Inspected: Footings Columns Building Pad Floor Slab Pavement Inltration Facility
Other: ______________________________________________________________________________
Area(s)/Location(s) of Inspection:
Exposed Subgrade Soil Type(s):________________________________________________________________ Native Fill
Unstable: Yes No
Probed: Yes No Soft: Yes No If yes, how deep: ________________________________________________
Proof Rolled: Yes No Equipment Used: ___________________________________________________________________
Deflection Observed: Yes No If yes, how deep: ____________________________________________________________
Comments:
Work Inspected was: in compliance except as noted reinspection/retesting required
NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those
opinions to our client. The presence and activities of our field representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may
rely on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction.
This Report is Preliminary.
A preliminary report is provided solely as evidence that eld observation was performed. Observations and/or conclusions and/or
recommendations conveyed in the nal report may vary from and Inspector: _________________________________________ Date: ________________ shall take precedence over those indicated in a preliminary report.Note: The recording of false, fictitious or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute.
Reviewed by: ______________________________________Date: ________________
Contractor Initials: ____________
This Report is Final.
A nal report is an instrument of professional service. Any
conclusions drawn from this report should be discussed with and evaluated by the professional involved.
5/20/2020 E200068c DL Evans, Rexburg
CM / Thompson
C.Park Sunny
4 MTI
10/11/2018 E180207g 10
1500 1500
4 ...
4
Interior Footings
Sandy Lean Clay / Sandy Lean Clay with Gravel Fill 4 4
4
4 0 to 0.5 inch4
4
Inspector arrived onsite as scheduled to visually assess exposed subgrade for interior footings. Soils had been removed
to bottom of interior footing elevation. Through probing, subgrade was fpind to be firm and unyielding, but removal of the
sandy lean clay with gravel fill should be removed from the surface of the (2) eastern most interior footings as required
by the geotechnical report. Contractor may proceed with the placement of imported granular structural fill. Structural fill
must be placed as specified in the project plans and specifications.
4 4
5/20/2020
4
5/21/2020
This assessment is limited in scope to the surface soils/materials exposed at the time of inspection, and available project-specific information provided to us. Subsurface conditions beneath or beyond what is listed above are outside MTI’s scope of work. The inspection service provided does not address any geologic conditions, hazards, subsurface conditions, and/or area-wide geotechnical conditions.