Loading...
HomeMy WebLinkAboutCONCRETE TEST 10 - 19-00780 - 500 N 2nd E - DL Evans Bank2791 S Victory View Way, Boise, ID 83709 208.376.4748 | oneatlas.com Jessica Aguilar Phone: (208) 363-8400 DL Evans Bank Fax: 890 West Main Street Other: E-REPORTS ONLY Boise, ID 83702 Project: D.L. Evans, North 2nd East, Rexburg, ID Permit #: Project Manager: Derrick Fontes MTI File #: E200068c INSPECTION/TESTING REPORT Our representative(s) performed work on the above referenced project. Attached you will find the corresponding inspection and/or test reports. Please refer to the attached reports for details and locations of our testing and inspection services. If there are questions concerning the attachment(s), please contact the project manager at (208) 529-8242. Respectfully submitted, ATLAS TECHNICAL CONSULTANTS, LLC cc: Larry Skelton; Kai Risung; Tom Lennon; Jim Turner; Kristina Teichert; Josh Morgan Attachments: rpt010ad www.oneatlas.com DENSITY OF BITUMINOUS CONCRETE IN PLACE BY NUCLEAR METHODS (ASTM D-2950) Rev. Sept 28, 2020  Make & Model:Gauge #:Serial #:Standard Counts: DS:MS: NOTICE: Our professionals are represented on site solely to observe operations of the contractor to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction.  This Report is Preliminary. observation was performed. Observations and/or conclusions and/or shall take precedence over those indicated in a preliminary report.  This Report is Final. conclusions drawn from this report should be discussed with and evaluated by the professional involved. Inspector: _________________________________________ Date: ________________ Note: The recording of false, fictitious or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute. Reviewed by: ______________________________________Date: ________________ Contractor Initials: ____________ Date: _______________ File #: _____________________ Project Name: ____________________________________ Contractor: _________________________________________ Permit #: ________________________________________ Inspector: __________________________________________ Weather: _______________________________________ Paving Contractor: ___________________________________ % Compaction Spec.: ______________________________ Material Source: _______________________________ Asphalt Mix Description: _________________________________ Marshall Unit Weight:____________ Hveem Max. Theoretical: ___________ Super Pave Max. Theoretical: ____________ Mix Temperature (˚F) (Delivered): __________ Mix Design Provided: Yes No Mat Thickness Spec.: ___________ No cores have been taken to establish a core to gauge correlation factor. Compaction values reports above are uncorrected and for information only. Test #Element and Location Test A(pcf)Test B(pcf)Average(pcf)Core Correlation Corrected Density (pcf) % Compaction Core Thickness Notes: Date of Last Calibration: 10/12/2020 E200068c DL Evans Bank Construction Solutions Brock Thornock Windy Thompson paving 92-96 HK Willow Creek 1/2 SP3 150.7 300 4 N/A 1 15’ W 6’ S of SW corner of building 140.2 141.0 140.6 140.6 93.3 2 18 W 0’ S of SW corner of building 141.9 141.0 141.5 141.5 93.9 3 11’ W 21’ N of SW corner of building 142.0 142.3 142.2 142.2 94.3 4 9’ N 12’ E of NW corner of building 143.1 142.2 142.7 142.7 94.7 40 Troxler 3430 23414 1581 615 4 5/10/2020 10/12/2020 4 10/14/2020 Jocelynn Silva 10/14/2020 Page 1 of 1