Loading...
HomeMy WebLinkAboutCONCRETE TEST 14 - 19-00733 - The Grove at Thomson Farms - Hemlock - 30 Unit Bldg 2Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength 5,701 PSI The Grove Still Water Equity Partnership 192 20001 17997 44 yards MP 322, MA AE 90 D. Aust 09-25-2020 7:00 AM 3.25 4.5 68 50 388A 388E 388C 388B 388D 4 4 4 4 10/02/20 10/23/20 10/23/20 10/23/20 10/23/20 51,335 71,525 72,090 71,365 5 4,0004,083 5,690 5,735 5,677 Digitally signed by Jacob Christensen Date: 2020.10.23 08:10:52 -06'00' 12.57 Walter's Ready Mix Sidewalks around bldg 2 7 28 28 28 H 12.57 12.57 12.57 141 E. Jenkins 09/28/2020 8:30 AM 6 1 2