Loading...
HomeMy WebLinkAboutASPHALT DENSITY 2 - The Grove at Thomson Farms Bld 7, 8In Place Density of Asphalt by Nuclear Methods ASTM D2950 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test #Test Location: Lift:Material Type: Wet: MA: % of MA: Test # Test # Test # Test # Test # Test # Test Location: Lift:Material Type: % of MA:MA: Wet: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: Reviewed By: Remarks: 208.970.6237 www.connectengr.com Test # Test # Test # Test # Test # Test # Test # % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: Page of 4103 E 605 N Suite 1 Rigby, ID 83442 The Grove 20001 Stillwater Equity Partners HK Contractors 10/28/2020 T. FALLS 10:30 AM 4:30 PM 3743 BUILDING 7 PARKING AREA EAST TO WEST 1 OF 1 137.4 148 93% BUILDING 7 PARKING AREA EAST TO WEST 1 OF 1 94%147.8 138.6 94%147.8 138.2 1 OF 1 BUILDING 7 PARKING AREA EAST TO WEST 93%147.8 137.9 1 OF 1 BUILDING 7 PARKING AREA EAST TO WEST 92%147.8 136.6 1 OF 1 BUILDING 7 PARKING AREA EAST TO WEST 93%147.8 136.8 1 OF 1 BUILDING 8 PARKING AREA EAST TO WEST 93%147.8 138 1 OF 1 BUILDING 8 PARKING AREA EAST TO WEST Digitally signed by Jacob P Christensen Date: 2020.10.29 15:57:05 -06'00' 1 2 3 4 5 6 7 11