Loading...
HomeMy WebLinkAboutASPHALT DENSITY - The Grove at Thomson Farms Bld 7, 8, 9In Place Density of Asphalt by Nuclear Methods ASTM D2950 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test #Test Location: Lift:Material Type: Wet: MA: % of MA: Test # Test # Test # Test # Test # Test # Test Location: Lift:Material Type: % of MA:MA: Wet: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: Reviewed By: Remarks: 208.970.6237 www.connectengr.com Test # Test # Test # Test # Test # Test # Test # % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: % of MA:MA: Wet: Material Type:Lift: Test Location: Page of 4103 E 605 N Suite 1 Rigby, ID 83442 The Grove 20001 Stillwater Equity Partners HK Oct 23, 2020 J. Denton 9:15 AM 8:00 PM 76561 2834 779 East of building 7 1 136.9 147.9 93% North of building 7 (east) 1 93%147.9 137.8 92%147.9 135.7 1 North of building 7 (west) 92%147.9 135.6 1 East of building 9 93%147.9 137.6 1 Between buildings 8 and 9 94%147.9 138.3 1 West of building 9 92%147.9 136.1 1 West of building 8 Digitally signed by Jacob P Christensen Date: 2020.10.26 13:33:52 -06'00' 1 2 3 4 5 6 7