Loading...
HomeMy WebLinkAboutCONCRETE TEST 14 - 19-00734 - The Grove at Thomson Farms - Maplewood - 30 Unit Bldg 1Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength 5,272 PSI The Grove Still Water Equity Partnership 192 20001 17875 10 of 20 MP 322, MA AE 90 D. Aust 09-22-2020 7:00 AM 5.25 5.5 62.8 44 372A 372E 372C 372B 372D 4 4 4 4 09/29/20 10/20/20 10/20/20 10/20/20 49,415 66,325 66,350 66,140 5 4,0003,931 5,276 5,278 5,261 Digitally signed by Jacob Christensen Date: 2020.10.20 12:48:49 -06'00' 12.57 Walter's Ready Mix South and West sidewalks around BLDG 1 7 28 28 28 H 12.57 12.57 12.57 140.4 1 of 1 J. Christensen Sep 23, 2020 8:00:00 AM 1 2 1