HomeMy WebLinkAboutCONCRETE TEST 14 - 19-00734 - The Grove at Thomson Farms - Maplewood - 30 Unit Bldg 1Project Name:
Client:
Mix Number:
Project Number:
Ticket Number:
Load Amount:
Admixtures:
Tested By:
Date and Time:
Compressive Strength of Concrete Test Specimens
Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511)
Slump (Inches):
Entrained Air (%):
Concrete Temperature:
Ambient Temperature:
Test Results:Minimum:Maximum:
Cylinder #
Lab Test Data: (ASTM C39, C42, C617, and C1231)
Break Age
Cylinder
Diameter (in)
Area
(in² )
Break
Date
Maximum Load
(lbs)
Break
Type
Compressive
Strength (psi)Required 28 day
Strength (psi)
°F
°F
Reviewed By:
Supplier:
Test Location:
Unit Weight (PCF):Set # :
Cylinders Picked Up By: Date and Time:
Hi / Low Temperatures
Remarks:
28-day Average Strength
5,272 PSI
The Grove
Still Water Equity Partnership
192
20001
17875
10 of 20
MP 322, MA AE 90
D. Aust
09-22-2020 7:00 AM
5.25
5.5
62.8
44
372A
372E
372C
372B
372D
4
4
4
4
09/29/20
10/20/20
10/20/20
10/20/20
49,415
66,325
66,350
66,140
5 4,0003,931
5,276
5,278
5,261
Digitally signed by Jacob
Christensen
Date: 2020.10.20 12:48:49 -06'00'
12.57
Walter's Ready Mix
South and West sidewalks around BLDG 1
7
28
28
28
H
12.57
12.57
12.57
140.4 1 of 1
J. Christensen Sep 23, 2020 8:00:00 AM
1
2
1