Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 8 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Excavation 09/01/2020 Sunny 8:00 AM 65 5:00 PM I arrived on site at approximately 8:00 AM. I observed that the contractor was not prepared for the inspection. I watched as the contractor drilled and cleaned holes for epoxy placement. I observed that the holes were cleaned out enough that was no longer any residue or dust. I observed that when the epoxy and rebar were inserted into the hole, a little bit of epoxy would come out. The holes were on the South side of the Spori building. They are in preparation for concrete sidewalks. I also observed that the epoxy expiration date is 02/2021. 8:00 AM- 10:00 AM (2 hrs) 4:00 PM- 5:00 PM (1 hrs) Digitally signed by Jacob P Christensen Date: 2020.09.13 13:20:37 -06'00' D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: