HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 6 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Paving 09/02/2020 Sunny 8:30AM 70 12:30PM I arrived at the site at approximately 8:30 and began my observations. I check the re-bar and made sure it was all up to spec and that the contractor was doing the correct things. The pour was supposed to begin at 9AM but the truck showed up late, so the pour didn't start until about 10:30 AM. That is when I began my testing and observations for the concrete placement. The first truck had low air, but air was added, and it passed on the second test. Throughout the pour I observed the contractor stay within conformance to the project documents. Digitally signed by Jacob P Christensen Date: 2020.09.13 13:29:18 -06'00' Concrete Reinforcements Concrete Reinforcements Concrete Placement L. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: