HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 6 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Thompson Paving 09/02/2020
Sunny
8:30AM
70
12:30PM
I arrived at the site at approximately 8:30 and began my observations. I check the re-bar and made sure it
was all up to spec and that the contractor was doing the correct things. The pour was supposed to begin at
9AM but the truck showed up late, so the pour didn't start until about 10:30 AM. That is when I began my
testing and observations for the concrete placement. The first truck had low air, but air was added, and it
passed on the second test. Throughout the pour I observed the contractor stay within conformance to the
project documents.
Digitally signed by Jacob P Christensen
Date: 2020.09.13 13:29:18 -06'00'
Concrete Reinforcements Concrete Reinforcements Concrete Placement
L. Steiner
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: