Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 4 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Bingham Mechanical 09/17/2020 Clear 9:00 AM 54 12:00 PM I arrived on site and began my observations of the condensate line going into the building. I observed the contractor place the gilsulate and consolidate it in place with a mechanical vibrator until firm under foot. I observed the contractor level off the gilsulate and place a piece of blue board on top then cover it with plastic. I notified the contractor of my observations prior to leaving. Digitally signed by Jacob P Christensen Date: 2020.09.20 14:42:42 -06'00'8129697 J. Christensen Page 2 of 2 Description: Description: Description: Description: Additional Comments: