Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 33 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Big D 4/29/2020 Clear 1:30 PM 80 6:00 PM Arrived on site and began observations. The footings on the south side of the building and the foundation walls on the north and east side were being poured. I observed that the reinforcement of the concrete was in general conformance to project plans. I also observed that the concrete placement was in general conformance with project plans. Digitally signed by Jacob P Christensen Date: 2020.05.01 13:13:51 -06'00'8129697 Reinforcement of concrete J. Morrison Page 2 of 2 Description: Description: Description: Description: Additional Comments: