HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 33 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Big D 4/29/2020
Clear
1:30 PM
80
6:00 PM
Arrived on site and began observations. The footings on the south side of the building and the foundation
walls on the north and east side were being poured. I observed that the reinforcement of the concrete was
in general conformance to project plans. I also observed that the concrete placement was in general
conformance with project plans.
Digitally signed by Jacob P Christensen
Date: 2020.05.01 13:13:51 -06'00'8129697
Reinforcement of concrete
J. Morrison
Page 2 of 2