Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 32 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Mills Conrete 4-13-2020 Clear and Cold 7:30 AM 20 10:30 AM I arrived on Site and started my observations of the concrete Reinforcement and Placement of Footings. Elevation, Footings. Between Grid lines 1-6 on the North End, as well as 1-1.2 and B-G on the East side. I observed the Reinforcement to be in general conformance to project documents. I observed the placement of Concrete through out the duration of the Pour, I observed the contractor consolidate the concrete. Two sets of tests were done on the concrete. The first truck had the wrong Mix design, the contractor was notified and adjustments were made. The last two had correct mix but wrong tickets. I observed the placement was in general conformance to project documents. Digitally signed by Jacob P Christensen Date: 2020.04.14 11:20:54 -06'00'8129697 Reinforcement NE corner Reinforcement North side between Grid lines 1.2 - 2 Reinforcement Gridlines 1-1.2 and B J. Christensen Page 2 of 2 Description: Description: Description: Description: Additional Comments: Reinforcement grid line 5.8-6 and G Concrete Placement Finish. Grid line 1-1.2 and F-G