Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 31 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Excavation 05/18/2020 Slightly Cloudy 8:00 AM 72 5:30 PM I arrived on site at approximately 8:30 AM. Upon arrival at the specified time, there were no areas ready for compaction testing. The contractor stated that their excavator had a broken component which caused them to be behind on compaction. I took the first density reading at approximately 11:00 AM. On the first lift, the contractor mixed native material with the pit run, causing the material to have a different proctor. They utilized the same means and methods of compaction as with other successful lifts, which gave me confidence that their compaction would be within the bounds of tolerance. I observed the contractor utilizing a hoepack to achieve compaction. Digitally signed by Jacob P Christensen Date: 2020.05.19 14:01:46 -06'00'8129697 Southeast corner after compaction Taken from Southeast corner facing Northwest. After 2nd lift. Hole by Southwest corner that needed to be filled to reach the West side D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: West side of building, being insulated in preparation for backfilling. Southwest corner before compaction of final lift. South side of building, before compaction of final lift.