HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 30 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Thompson Excavation 05/19/2020
Partly Cloudy
9:30 AM
70
5:30 PM
I arrived on-site at approximately 9:45 AM. I began an initial walkthrough and observed that one lift below
final grade had been compacted and was ready for density testing along the South wall. The tests taken
along that wall were passing tests on the first try. After completing the backfill along the South wall, the
contractor began backfilling along the West wall. There was about an hour wait before being able to start
on the West wall because the contractor was waiting on insulation to place along the West wall. After the
insulation was placed, I observed the contractor compacting with a hoepack. There are approximately 3' in
depth left to compact along the West wall.
Digitally signed by Jacob P Christensen
Date: 2020.05.20 14:06:41 -06'00'8129697
Compaction along the West wall Compaction along the West wall Backfill along West wall
D. Aust
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: