HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Excavation 9/18/2020 Overcast. Smokey 9:00 AM 68 12:30 PM I arrived on site and began my observations. I first observed the placement and compaction of Base prep for sidewalk/driveway entrance into the Spori Anex parking lot. I observed the placement and compaction of the base material was in general conformance to project documents. I performed density tests on the base material and informed the contractor of the results. I then observed the contractor epoxy dowels into the existing concrete sidewalk. I observed the contractor place the epoxy and that it was in general conformance to project documents. At 10:30 Concrete arrived and I began my observation of the Concrete Reinforcement and Concrete placement. I observed the reinforcement was in general conformance to project documents. I performed ACI tests on the Air, Temperature and Slump and observed the concrete was in general conformance to project documents. I observed the contractor place and consolidate the concrete and observed it to be in general conformance to project documents. I observed for the duration of the pour. The contractor was a little short for finish. They will complete the slab on a future date. Digitally signed by Jacob Christensen Date: 2020.09.21 09:15:23 -06'00'8129697 Epoxy Experatin Epoxy Placement Concrete Reinforcement E. Jenkins Page 2 of 2 Description: Description: Description: Description: Additional Comments: Concrete placement and consolidation