Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 29 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Excavation 05/27/2020 Sunny 7:00 AM 75 9:00 AM I arrived on site at approximately 7:35 AM to test concrete. I observed a concrete truck being washed out and that the concrete was already poured. I observed that the contractor had finished compacting 1' below finish grade. According to the contractor, a roller was used to achieve compaction. I took two density shots; both of which passed on the first try. I observed the Contractor to be in general conformance to project documents. Digitally signed by Jacob P Christensen Date: 2020.05.28 09:57:41 -06'00'8129697 David Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: