HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 28 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Excavation 6/2/2020 Sunny 8:00 AM 72 3:00 PM I arrived on site at approximately 8:15 AM. I observed the contractor starting to backfill the steam line near the SE corner of the Spori Building. I observed that compaction was achieved using a Jumping Jack and dual roller. After the first lift, I observed the contractor over-saturate the material leading to over-moist areas that deflected under my body weight. To remedy the issue the contractor will let the over-saturate area dry over night. I observed the work done was in general conformance with project documents. Will return for retesting. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.08 07:45:33 -06'00'8129697 Picture of Over Saturated Material Picture of Over Saturated Material David Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: