HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 28 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Thompson Excavation 6/2/2020
Sunny
8:00 AM
72
3:00 PM
I arrived on site at approximately 8:15 AM. I observed the contractor starting to backfill the steam line near
the SE corner of the Spori Building. I observed that compaction was achieved using a Jumping Jack and
dual roller. After the first lift, I observed the contractor over-saturate the material leading to over-moist
areas that deflected under my body weight. To remedy the issue the contractor will let the over-saturate
area dry over night. I observed the work done was in general conformance with project documents.
Will return for retesting.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.08 07:45:33
-06'00'8129697
Picture of Over Saturated Material Picture of Over Saturated Material
David Aust
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: